State College Area School District
January 22, 2018
Overall Progress
Building View from Westerly Parkway
Main Lobby
Finished Benches in the Main Entrance Lobby
Main Entrance Courtyard
Main Entrance Courtyard view from the LGI Room
Classroom Finishes
Childhood Development classroom with furniture set up
Classroom Finishes
Learning Enrichment classroom decorated for class
Temporary Library
All 1,200 boxes from the libraries have been moved and unpacked
Interior Finishes
The temporary Food Service Café is set up and operational on 1st Floor Pod C
Shop Areas
Electricians working in the Auto Lab
Shop Areas
Equipment Being hooked up in the Woodshop Lab as seen from the Storage Mezzanine
LGI Room
Final touches being completed in the LGI Room
Main Stairwell
The “hat” or temporary floor built in the 2nd Floor Main Stairwell
Existing Building Renovation
Drywall finishing is ongoing in the Culinary Arts classroom
Existing Building Renovation
Framing, drywall, and MEP work ongoing outside of the Culinary Dining Area
Phase 3 Construction
Subsurface soil stabilization in progress for future Auditorium area
New Feb. 2018 Traffic Pattern
Upcoming Work• Punch List – Phase 1• Kitchen / Cafeteria• Asbestos abatement • Foundations – Phase 3• North Building Demo
Project Stats• Safety = 84 Days with
Zero Recordable Accidents
Schedule• North Abatement = On Schedule• South Abatement = On Schedule• Area F1/F2 = Mid March turn over
January 22, 2018