Page 1: State Data Center (SDC)  Update

State Data Center (SDC) Update

July 23, 2014

Page 2: State Data Center (SDC)  Update

Agenda• SDC Colocation Overview• SDC Projects Status

• SDC Projects Communication

2

Page 3: State Data Center (SDC)  Update

SDC Colocation

3

Page 4: State Data Center (SDC)  Update

State Data Center Overview

SDC is part of the state’s IT Consolidation and Transformation strategy with goals to reduce overall IT costs and improve security

Designed to be the most secure and efficient data center in Washington state government

State-of-the-art infrastructure including power and cooling systems

4

Page 5: State Data Center (SDC)  Update

Consolidation Strategy

5

• Per legislation (ESSB 5931, Oct. 1, 2011), the state intends to consolidate data centers

• The Office of the Chief Information Officer (OCIO) developed and published the Updated SDC Business Plan which discusses next steps for OB2 as well as the consolidation of other state data centers

• OCIO recently distributed a survey to gather information about when agencies with data centers feel it makes sense for them to consolidate

• OCIO intends to publish another SDC Business Plan update in 2014

Page 6: State Data Center (SDC)  Update

SDC FacilitiesIn 2013 the SDC Facilities Team completed the work required to make the SDC facility operational.

This included areas such as: • physical security • access controls• equipment enclosures• structured cabling• customer power provisioning

6

Page 7: State Data Center (SDC)  Update

SDC Network CoreIn 2013 the Network Core Project completed establishing the network core in the SDC which connects to the OB2 network.

Customers in using the SDC Colocation Service have a range of network management options. Customers can choose to manage their own network or have CTS manage their network for them.

7

Page 8: State Data Center (SDC)  Update

SDC Colocation Service

8

• The SDC Colocation Service is operational.

• The CTS Service Catalog is updated to reflect the new service:– Service description and rates have been published– Steps for new customers to follow to use the service are available

• The Colocation Service Owner is supporting customer migrations:– Two of the twenty CTS A la Carte customers in OB2 have completed

migration to the SDC– CTS is engaged with remaining OB2 customers– CTS is also engaged with additional (non-OB2) customers– Washington State Patrol (WSP) has established a presence in the SDC

and is working with CTS to continue migration planning

Page 9: State Data Center (SDC)  Update

SDC Projects Status

9

Page 10: State Data Center (SDC)  Update

SDC Projects

10

1. Reduce Heat in OB2

2. Facilities3. Core Network4. SDC Firewalls5. Storage Optimization

7. SDC Move Phase 28. CTS Cloud Utility9. Virtual Tape Library

10. OB2 Decommissioning11. OB2 Node Site

Prepare the SDC to Receive Equipment

Move the Load to the SDC

Other Migrations to SDC (WSP)

Reduce Heat Generated in OB2

OB2 Data Center

Consolidation6. CTS Move Phase 1

Move the Load to the SDC (con’t)

Page 11: State Data Center (SDC)  Update

SDC Projects Timeline

11

Page 12: State Data Center (SDC)  Update

Storage Optimization (Complete)The Storage Optimization project expanded the enterprise shared storage environment and implemented state of the art technology.

The new technology supports growth and consolidation initiatives and reduces customer rates.

12

Page 13: State Data Center (SDC)  Update

Firewall MigrationsCTS has approximately 95 firewalls to migrate from OB2 to the new firewall solution in the SDC between March 2013 – September 2014.

Each migration has been a coordinated effort with customers.

We have completed 73 of the 95 migrations to date.

13

Page 14: State Data Center (SDC)  Update

CTS Move Phase 1 - Recap• 517 of 517 virtual servers in OB2 have been moved or

decommissioned. 264 of 287 physical servers in OB2 have been moved or decommissioned

• Completed migration of the messaging environment• Completed numerous projects to migrate CTS security

systems, including 8 change events supporting the migration of SAW and Fortress customer test and production

• Completed several telephony systems migrations• Establish provider/carrier presence in the SDC• Completed Unisys Mainframe migration and the

stand-up of the IBM Mainframe to the SDC

14

Page 15: State Data Center (SDC)  Update

SDC Move Phase 2- ScopeSDC Move Phase 2 moves the remaining systems out of OB2 into the SDC.

In Scope: • Equipment supporting CTS services such as:

• CTS internal support systems• Security systems• Telephony system• Network systems

• Customer agencies in OB2 A la Carte

15

Page 16: State Data Center (SDC)  Update

CTS Cloud Utility• The goal is to transform the current CTS virtual server service into an

automated service offering comparable to commercial public cloud providers.

• Functionality• On-demand self-service portal• Capability to automatically provision, de-provision, archive compute

resources• Secure multi-tenant infrastructure with complete business unit

isolation • Role based access control• Customizable templates to support specific use cases• Automated billing processes

16

Page 17: State Data Center (SDC)  Update

CTS Cloud Utility StatusRecent:

• Completed SOW negotiation• Completed final contract paperwork (ELA and EULA)• Kick-off formal production pilot with customers (UTC & LNI)

Upcoming:• Design production environment with VMware support• Install and configure production environment• Develop Cloud Readiness Guide

17

Page 18: State Data Center (SDC)  Update

DR - VTL Overview• The goal of the Disaster Recovery - Virtual Tape Library Project is to

implement a secondary VTL environment in the SDC, establish replication between OB2 and the SDC, replicate the data, then move the OB2 VTL to the DR site.

• The VTL DR will serve as the offsite backup service for the production mainframe environments.

• CTS will be able to eliminate the existing physical tape infrastructure and avoid replacing the SL8500 tape robot and reduce physical tape related costs.

18

Page 19: State Data Center (SDC)  Update

DR - VTL StatusRecent:

• Completed development of the Request for Quotation and Qualifications (RFQQ)

• Released the RFQQ with responses due August 4th

Upcoming:• Select the Apparently Successful Vendor (ASV)• Kick-off the project

19

Page 20: State Data Center (SDC)  Update

Other SDC ProjectsOB2 Decommissioning:

• CTS intends to have moved systems out of OB2 by June 30, 2015.

OB2 Node Site:• DES is working on plans to repurpose the data center space, including

an equipment room which will serve the IT needs of OB2.• Once the room is ready, CTS will move the its final OB2 equipment into

the room. This currently includes equipment for a node site and PBX (telephony) serving the OB2.

20

Page 21: State Data Center (SDC)  Update

Customer Communications

21

Page 22: State Data Center (SDC)  Update

Customer CommunicationsCTS Project Managers• The primary points of contact at CTS for

customer-impacting SDC migration projects are:– Doug Wood: customer migrations– Jennifer Cox: firewall migrations

Agency Implementation Coordinators• The primary point of contact for each

impacted agency was identified as the Agency Implementation Coordinator (AIC).

22

The Project Managers work individually with each agency to schedule planning meetings before each migration.

CTS hosts a monthly AIC meeting to share status updates and respond to questions.

This approach has been extremely successful when coordinating these complex activities.

Page 24: State Data Center (SDC)  Update

SDC Projects Website

24

The SDC Projects website provides current information about the status of the projects.

Page 25: State Data Center (SDC)  Update

Q&A

QUESTIONS?