state hydrometeorology institute 6-7 march 2012. dushanbe 6-7 march 2012. dushanbe project...

14

Click here to load reader

Upload: wesley-burns

Post on 27-Dec-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: State Hydrometeorology Institute 6-7 March 2012. Dushanbe 6-7 March 2012. Dushanbe Project «Modernisation of weather, climate and hydrological service

StateState Hydrometeorology InstituteHydrometeorology Institute

6-7 March 2012. Dushanbe6-7 March 2012. Dushanbe

Project «Modernisation of weather, Project «Modernisation of weather, climate and hydrological service climate and hydrological service

delivery in Central Asia» (WCHSD CА) delivery in Central Asia» (WCHSD CА)

Page 2: State Hydrometeorology Institute 6-7 March 2012. Dushanbe 6-7 March 2012. Dushanbe Project «Modernisation of weather, climate and hydrological service

Reasons for implementing WCHSD CА

• Economic losses due to Natural Hydrometeorological Disasters (NHD) average from 0.4 tо 1.3% of GDP in Central Asia;

• Therefore the requirement for high-quality weather, hydrological and climate services is of exceptional importance to stable development in the region.

Проект «Модернизация гидрометеорологическогообслуживания в Центральной Азии»

Page 3: State Hydrometeorology Institute 6-7 March 2012. Dushanbe 6-7 March 2012. Dushanbe Project «Modernisation of weather, climate and hydrological service

Reasons for implementing WCHSD CА

Weather, climate and hydrological information is essential for:

• early warning for the population in the event of a natural disaster;

• optimisation of economic activities in sectors such as agriculture, transport, water management and hydropower.

Проект «Модернизация гидрометеорологическогообслуживания в Центральной Азии»

Page 4: State Hydrometeorology Institute 6-7 March 2012. Dushanbe 6-7 March 2012. Dushanbe Project «Modernisation of weather, climate and hydrological service

Reasons for implementing WCHSD CА

The low technical and professional potential of National weather, climate and hydrological services (NWCHS) in Central Asia:

a) obsolescent and unserviceable equipment;

b) badly organised communications;

c) an acute shortage of skilled staff.

Проект «Модернизация гидрометеорологическогообслуживания в Центральной Азии»

Page 5: State Hydrometeorology Institute 6-7 March 2012. Dushanbe 6-7 March 2012. Dushanbe Project «Modernisation of weather, climate and hydrological service

General aims of WCHSD CА

•Improving the quality of weather, climate and hydrological services in Central Asia;

•Developing and reinforcing interaction between NWCHS CА in the exchange of data, information and know-how

for the restoration of infrastructure and professional potential;

•Reducing the risks of natural disasters, managing the consequences of climate change and promoting economic development in agriculture, the water resources sector, power engineering and transport throughout the region.

Проект «Модернизация гидрометеорологическогообслуживания в Центральной Азии»

Page 6: State Hydrometeorology Institute 6-7 March 2012. Dushanbe 6-7 March 2012. Dushanbe Project «Modernisation of weather, climate and hydrological service

Components of WCHSD CА

A – A regional component, designed to reinforce all participating NWCHS

(Republic of Kazakhstan, Kyrgyz Republic, Republic of Tajikistan, Republic of Uzbekistan);

B – Improvement of weather, climate and hydrological services in the Kyrgyz Republic;

C – Improvement of weather, climate and hydrological services in the Republic of Tajikistan.

Проект «Модернизация гидрометеорологическогообслуживания в Центральной Азии»

Page 7: State Hydrometeorology Institute 6-7 March 2012. Dushanbe 6-7 March 2012. Dushanbe Project «Modernisation of weather, climate and hydrological service

Component С: Improvement of weather, climate and

hydrological services in the Republic of Tajikistan

Aim:

• Reduction of risks arising from NHD to human life and the economy of the country

Funded by the World Bank from two sources: the International Development Association and the Pilot Programme for Climate Resilience

Проект «Модернизация гидрометеорологическогообслуживания в Центральной Азии»

Page 8: State Hydrometeorology Institute 6-7 March 2012. Dushanbe 6-7 March 2012. Dushanbe Project «Modernisation of weather, climate and hydrological service

Subcomponent С.1

Institutional strengthening of the Tajik Weather, Climate and Hydrological Service (Tadzhikgidromet), including the raising of professional potential, and financial stability models, by:

a) technical support and training of personnel;

b) devising and approving the essential business model for the provision of commercial weather, climate and hydrological services in the Republic of Tajikistan;

c) renewal of the scientific methods basis of Tadzhikgidromet operations to bring them into line with the standards of the World Meteorological Organization.

Проект «Модернизация гидрометеорологическогообслуживания в Центральной Азии»

Page 9: State Hydrometeorology Institute 6-7 March 2012. Dushanbe 6-7 March 2012. Dushanbe Project «Modernisation of weather, climate and hydrological service

Subcomponent С.2

Improving the system of weather, climate and hydrological monitoring ensuring timely warning of catastrophic and dangerous phenomena and water resources management by:

a) equipping and restoring weather, hydrological and agrometeorological observation points and avalanche observation networks;

b) creation, restoration and/or upgrading of national weather, climate and hydrological data collection centres;

c) improving forecasting systems.

Проект «Модернизация гидрометеорологическогообслуживания в Центральной Азии»

Page 10: State Hydrometeorology Institute 6-7 March 2012. Dushanbe 6-7 March 2012. Dushanbe Project «Modernisation of weather, climate and hydrological service

Subcomponent C.3

Improving the system of service provision by Tadzhikgidromet by:

a) perfecting weather, climate and hydrological services from Tadzhikgidromet, including client access to data and data-processing products;

b) specialised training for the personnel who provide the services.

Проект «Модернизация гидрометеорологическогообслуживания в Центральной Азии»

Page 11: State Hydrometeorology Institute 6-7 March 2012. Dushanbe 6-7 March 2012. Dushanbe Project «Modernisation of weather, climate and hydrological service

Subcomponent С.4

Support for implementation of Project Component С:

• Assisting the Project Management Committee (PMC);

• Financial management;

• Organisation of purchasing;

• Project administration;

• Supervision of delivery flows and equipment assembly.

Проект «Модернизация гидрометеорологическогообслуживания в Центральной Азии»

Page 12: State Hydrometeorology Institute 6-7 March 2012. Dushanbe 6-7 March 2012. Dushanbe Project «Modernisation of weather, climate and hydrological service

System integrator

Suppliers of goods and services

NWCHSProject coordination sub-divisions (PCS)

Project leader

ManagerPurchasing specialist

Finance manager

AccountantTechnical specialist

Technical coordinators

Regional subcoordinators

Оценочная

комиссия

Оценочная комиссияEvaluation

boards

Technical council

RCG coordinating council

Project Management

Committee

PMC members

Management and

coordination

Assistance

Finance Ministry

Inte

racti

on

Consultants

Central NWCHSoffice

Project management organisation chart

Page 13: State Hydrometeorology Institute 6-7 March 2012. Dushanbe 6-7 March 2012. Dushanbe Project «Modernisation of weather, climate and hydrological service

Results expected

(i) Reaching a ‘satisfactory’ level at Tadjhikgidromet in terms of technological provision (comparable with the general technological standard of NWCHS in WMO member-countries);

(ii) More reliable hydrometeorological and climatological forecasts, contributing directly to the economic development of the Republic of Tajikistan, particularly with regard to the development of the agricultural, water resources management and hydropower sectors, as well as combating natural disasters and climate change;

(iii) Raising the quality and extending the range of data-processing products supplied in an easy-to-use form to satisfy the consumer;

(iv) Improving the system of data and information exchange, in particular with regard to natural disasters, at the regional level.

Проект «Модернизация гидрометеорологическогообслуживания в Центральной Азии»

Page 14: State Hydrometeorology Institute 6-7 March 2012. Dushanbe 6-7 March 2012. Dushanbe Project «Modernisation of weather, climate and hydrological service

THANK YOUFOR YOUR ATTENTION!