STATE OF WYOMING OFFICE OF THE STATE ENGINEER APPLICATION FOR PERMIT TO APPROPRIATE SURFACE WATER THIS SECTION IS NOT TO BE FILLED IN BY APPLICANT Filing/Priority Date This instrument was received and filed for record on the _______ day of _____________________________________, _________, at _________ o’clock ________ M. ____________________________________________________ State Engineer Recorded in Book _____________________ of Stock Reservoir Permits, on Page_____________________ Fee Paid $ _____________ Map Filed ___________ WATER DIVISION NO. _______ DISTRICT NO. ________ TEMPORARY FILING NO.______________________________ PERMIT NO.__________________STOCK RESERVOIR THE STATE OF WYOMING STATE ENGINEER’S OFFICE } SS. NOTE: Do not fold this form. Use typewriter or print neatly with black ink. Form S.W. 4 _____________ Rev. 6.2.2006 Permit No. __________________________Stk. Res. Page No. _________________ (Leave Blank) NAME OF FACILITY THE ______________________________________________________________________________ STOCK RESERVOIR 1. Name(s), mailing address and phone no. of applicant(s) is/are ____________________________________________________ ______________________________________________________________________________________________________ ______________________________________________________________________________________________________ ______________________________________________________________________________________________________ (if more than one applicant, designate one to act as Agent for the others) 2. Name & address of agent to receive correspondence and notices ___________________________________________________ ______________________________________________________________________________________________________ __________________________________________________ E-mail address: ______________________________________ 3. The use to which the water is to be applied is in-place stock watering purposes. 4. (a) The area of the high water line of the reservoir is___________ acres. (b) The capacity of the reservoir is __________________ acre-feet. (c) Body of Reservoir: Length _____________________ Width _____________ Average Depth _______________ (d) If enalrgement, the capacity of this enlargement is __________________________ acre-feet. 5. The source of the proposed appropriation is___________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ 6. The outlet of the reservoir is located in _______________________ of Section ______________________________________, T._______________., R._____________. Surveyed corner tie, if available: bearing ________________________________ feet distant from the ________________________________ corner of Section _________, T. __________ ., R. __________ . Lot __________ Block _____________ Subdivision Name ______________________________________________________ Latitude (Decimal Degrees) ___________________________ Longitude (Decimal Degrees) ___________________________ 7. Are any of the lands covered by the proposed reservoir owned by the State or Federal government? If so, describe lands and designate whether State or Federally owned. ______________________________________________________________________________________________________ ______________________________________________________________________________________________________ ______________________________________________________________________________________________________ 8. Fill out either (a) or (b). (a) The reservoir is located in the channel of _________________________________________________________________ (b) The reservoir is to be filled through the __________________________________________________________________ Canal, which has a carrying capacity of __________cubic feet per second (c.f.s.) 9. (a) The dam is to be constructed as follows ___________________________________________________________________ _______________________________________________________contents = ___________________________ cubic yards. (b) The water face of the dam is to be protected from wave action in the following manner: ____________________________ _____________________________________________________________________________________________________ (c) Dam Height _________________________feet. 10. The accompanying map is prepared in accordance with the State Engineer’s Rules and Regulations for filing applications and is hereby declared a part of this application. 11. The estimated time required for completion of construction is____________________________________________________ (If a pipeline to additional points of storage will be used, include form SW4-A.)

Upload: others

Post on 13-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: STATE OF WYOMINGseoweb.wyo.gov/e-Permit/PDFFormsSW/SW4.pdfstate of wyoming office of the state engineer application for permit to appropriate surface water this section is not to be

STATE OF WYOMING OFFICE OF THE STATE ENGINEER

APPLICATION FOR PERMIT TO APPROPRIATE SURFACE WATER THIS SECTION IS NOT TO BE FILLED IN BY APPLICANT

Filing/Priority Date

This instrument was received and filed for record on the _______ day of _____________________________________, _________, at _________ o’clock ________ M.

____________________________________________________ State Engineer

Recorded in Book _____________________ of Stock Reservoir Permits, on Page_____________________

Fee Paid $ _____________ Map Filed ___________

WATER DIVISION NO. _______ DISTRICT NO. ________ TEMPORARY FILING NO.______________________________

PERMIT NO.__________________STOCK RESERVOIR

THE STATE OF WYOMING STATE ENGINEER’S OFFICE } SS.

NOTE: Do not fold this form. Use typewriter or print neatly with black ink.

Form S.W. 4 _____________Rev. 6.2.2006

Permit No. __________________________Stk. Res. Page No. _________________ (Leave Blank)

NAME OF FACILITY THE ______________________________________________________________________________ STOCK RESERVOIR

1. Name(s), mailing address and phone no. of applicant(s) is/are ____________________________________________________ ______________________________________________________________________________________________________ ______________________________________________________________________________________________________ ______________________________________________________________________________________________________

(if more than one applicant, designate one to act as Agent for the others)

2. Name & address of agent to receive correspondence and notices ___________________________________________________ ______________________________________________________________________________________________________ __________________________________________________ E-mail address: ______________________________________ 3. The use to which the water is to be applied is in-place stock watering purposes. 4. (a) The area of the high water line of the reservoir is___________ acres. (b) The capacity of the reservoir is __________________ acre-feet. (c) Body of Reservoir: Length _____________________ Width _____________ Average Depth _______________

(d) If enalrgement, the capacity of this enlargement is __________________________ acre-feet. 5. The source of the proposed appropriation is___________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________

6. The outlet of the reservoir is located in _______________________ of Section ______________________________________, T._______________., R._____________. Surveyed corner tie, if available: bearing ________________________________ feet distant from the ________________________________ corner of Section _________, T. __________ ., R. __________ . Lot __________ Block _____________ Subdivision Name ______________________________________________________ Latitude (Decimal Degrees) ___________________________ Longitude (Decimal Degrees) ___________________________ 7. Are any of the lands covered by the proposed reservoir owned by the State or Federal government? If so, describe lands and

designate whether State or Federally owned. ______________________________________________________________________________________________________ ______________________________________________________________________________________________________ ______________________________________________________________________________________________________ 8. Fill out either (a) or (b).

(a) The reservoir is located in the channel of _________________________________________________________________ (b) The reservoir is to be filled through the __________________________________________________________________

Canal, which has a carrying capacity of __________cubic feet per second (c.f.s.) 9. (a) The dam is to be constructed as follows ___________________________________________________________________ _______________________________________________________contents = ___________________________ cubic yards. (b) The water face of the dam is to be protected from wave action in the following manner: ____________________________ _____________________________________________________________________________________________________ (c) Dam Height _________________________feet.

10. The accompanying map is prepared in accordance with the State Engineer’s Rules and Regulations for filing applications and is hereby declared a part of this application.

11. The estimated time required for completion of construction is____________________________________________________

(If a pipeline to additional points of storage will be used, include form SW4-A.)

Page 2: STATE OF WYOMINGseoweb.wyo.gov/e-Permit/PDFFormsSW/SW4.pdfstate of wyoming office of the state engineer application for permit to appropriate surface water this section is not to be

______________________________________________________________ Signature of Applicant or Agent

_________________________________ Date

MAP AND PLANS OF PROPOSED__________________________________________________________STOCK RESERVOIR

LOCATION MAP—Scale 1”=2,000 ft. SEE NOTE BELOW

W. R.

N.

T.

AREA MAP—SCALE:—1”=__________________(Use as large a scale as possible)

PROFILE OF DAMSITE (Looking Upstream) - Scale: Ver. 1”=20’; Hor. 1”=_________.

Capacity = [Area x Depth ÷ 3] = ______________________________Acre-Feet. Existing Capacity = ____________ Acre-Feet

NOTE: The location map shown above is not required if the application is accompanied by an aerial photograph or a U.S.G.S. quad-rangle map, prepared in accordance with the State Engineer’s Rules and Regulations . However, the area map, cross-section of dam, profile of damsite and capacity computation must be completed in all applications.

DECLARATION

Under penalties of perjury, I declare that I have examined this application and the information contained herein, and to the best of my knowledge and belief it is true, correct and complete, and that the location of the proposed facility is accurately shown either above or on the aerial photograph or U.S.G.S. quadrangle map accompanying this application.

____:1 SLOPE

HIGH WATER LINE ELEV. =

TOP OF DAM ELEV. =_______________ →

¤VA

LVE

DETAILS OF DAM

FREEBOARD ABOVE HIGH WATER LINE ___________ TOP WIDTH

← ↑

↓ CROSS-SECTION OF DAM—No Scale

TOTAL HEIGHT_______ ____:1 SLOPE

____- INCH OUTLET PIPE