State Route 710 Study August 13, 2012 Presentation to Pasadena City Council
Overview: Alternative Analysis Phase
Background
• Existing No Build condition of SR-710 contributes to growing congestion on nearby freeways & arterials
• 2/3rds of LA County voters approved Measure R
• Robust Project Scoping effort completed
• Metro Board awards environmental and outreach contracts (two 3 year contracts)
• Public participation ongoing
2
Where we are…
3
Alternative Analysis (AA) Phase
WHY & HOW?
• Fulfill next step leading to environmental studies
• Evaluate a full range of reasonable multi-modal transportation alternatives to address the problem
• Collect data, and conduct engineering and other environmental and technical assessments
• Consider input from Project Scoping as well as public input during the AA phase
4
Project Development Process
Preliminary - Not for Distribution 5
Post Scoping - Initial Study Area
6
• Keep all modal options on the table including: Transportation Systems Management
/Transportation Demand Management (TSM/TDM) low-build; surface, subsurface and elevated alignments; transit (bus and rail) options; arterial improvements; freight management systems; supporting advanced technologies; and No-Build
• Define project need and study area • Continue public participation
7
What we heard during Scoping
• Consider all related traffic, engineering, social, aesthetic, economic, cultural, natural, archaeological, health, air quality, noise and environmental justice issues
• Consider local and regional planning impacts • Conduct cost/benefit analyses
8
More on what we heard
What we are studying…
9
• No Build • TSM/TDM • Bus Rapid Transit • Light Rail Rapid Transit • Freeway (surface, subsurface/underground) • Highway/Arterial Improvements • Advanced Transportation Technologies
10
Alternative Concepts
Paragraph of copy. Paragraph of regular copy.
Not bulleted. Paragraph of regular copy.
Preliminary - Not for Distribution
No Build
TSM - Transportation System Management • Active transportation systems • Expanded transit (bus) service • Hot spot and/or intersection improvements and • Intelligent Transportation System improvements
TDM - Transportation Demand Management • Rideshare, telecommuting
12
TSM/TDM Concepts
13
BRT and LRT Concepts
14
Freeway Concepts
15
Highway/Arterial Improvement Concepts
16 Preliminary - Not for Distribution
TSM/TDM Alternative Concept – Active Transportation
TSM/TDM Alternative Concept – Bus Service Improvements
17 Preliminary - Not for Distribution
18 Preliminary - Not for Distribution
Getting new graphic
TSM/TDM Alternative Concept– Intersection & Local Street Improvements
Preliminary - Not for Distribution
19 Preliminary - Not for Distribution
TSM/TDM Alternative Concept – ITS Improvements
Everyone has a role…
20
Key Participants
• Stakeholders – provide input throughout study process
• Metro - administer technical and community outreach study contracts (staff recommends final alternative to Metro Board based on study results)
• Caltrans - serve as lead agency for CEQA/NEPA compliance, provide technical oversight, certify study results
• Contractors – conduct study, execute tasks, solicit public input and inform stakeholders
21 Preliminary - Not for Distribution
Study Decision-Making
Study Team
Stakeholders
Metro, Caltrans
& Federal Agencies
Study & Recommen
d
Inform & Advise Input Decid
e
• All Communities Convening • Community Liaison Councils • Stakeholder Outreach Advisory Committee • Technical Advisory Committee • Open Houses, Subject specific
informational sessions, roundtables, and/or focus groups, as needed
23
Outreach Structure
Some of what we have learned…
25
• Major congestion on local streets intrusive and
decreases level of service • Operational deficiencies on highway system
adversely impacts transit system • Limited north-south transit network
constrained by slow speeds on local arterials
26
Mobility Constraints
Preliminary Project Need
• Improve mobility by accommodating regional and local north-south travel demands in the western San Gabriel Valley and east/northeast section of the city of Los Angeles within the study area
27 Preliminary - Not for Distribution
Objectives that meet Project Need
• Minimize travel time • Improve connectivity and mobility • Reduce congestion on local network and
regional freeway network • Increase transit ridership • Minimize environmental and community
impacts • Assure consistency with regional plans • Maximize cost-efficiency of public investments 28
Preliminary - Not for Distribution
Initial Environmental Assessment
Environmental topics evaluated • Property Acquisition • Community and Neighborhoods • Parkland/Community Facilities • Biological/Jurisdictional Resources • Noise • Air Quality • Visual Resources • Geotechnical • Hazardous Waste • Environmental Justice • Paleontological Resources • Historic Properties
Alternatives Screening Process
Draft P&N & Range of Alternatives
Conceptual Set of Alternatives (42)
Initial Set of Alternatives (12)
Final Set of Alternatives
Scoping Meetings
Alternative Analysis
Environmental Documentation
NOD/ROD
Preferred Alternative
CEQ
A/N
EPA
Proc
ess
Stak
ehol
der I
nput
&
Next Steps
• Further refine alternative concepts and study area • Continue conceptual engineering and technical
analyses • Recommend final alternatives by Fall 2012 • Circulate Draft Environmental Document and
conduct Public Hearing by Winter 2013 • Final Environmental Document by Winter 2014 • Continue public participation
31
Stay Connected and Involved
facebook.com/sr710Study @SR710Study
www.metro.net/sr710study (855) 4-SR-710-0 / (855) 477-7100 -
toll free [email protected]
32