Staten Island Community Board #1 May 11, 2010

St. George Ferry Terminal Ramps

Page 2: Staten Island Community Board #1 - May 11, 2010May 11, 2010  · Bus Station Ramps Maintain Richmond Terrace Traffic Movements through the Corridor Maintain Bus Turning / Movements

2

Design Build Team

New York City Department of Transportation

Division of Bridges – Design Build

Conti of New York• URS Inc.• Zetlin Strategic Communications Inc.• AECOM, USA Inc. - Donna Walcavage landscape• SI Engineering• FTL Associates• Leni Schwendinger – Light Projects Ltd.

Page 3: Staten Island Community Board #1 - May 11, 2010May 11, 2010  · Bus Station Ramps Maintain Richmond Terrace Traffic Movements through the Corridor Maintain Bus Turning / Movements

3

The Design Build Process

Single contract for design and construction

NYCDOT - Design-Build Program since 1994

Franklin Avenue Shuttle over Fulton Street, 1998

Ridge Boulevard and 3rd Avenue over Belt Parkway, 1999

Belt Parkway over Ocean Parkway, 2002

More efficient project delivery

Funded by FTA through ARRA

Page 4: Staten Island Community Board #1 - May 11, 2010May 11, 2010  · Bus Station Ramps Maintain Richmond Terrace Traffic Movements through the Corridor Maintain Bus Turning / Movements

4

Goal

To reconstruct the ferry terminal ramps while maintaining all operations and minimizing disruption to the public

Objectives

Bring all existing ramps to a “state of good repair”

Improve pedestrian and cyclist access

Improve circulation within the bus ramps

Engage stakeholders throughout the process

Page 5: Staten Island Community Board #1 - May 11, 2010May 11, 2010  · Bus Station Ramps Maintain Richmond Terrace Traffic Movements through the Corridor Maintain Bus Turning / Movements

5

Scope

Rehabilitate 7 vehicular ramps and decks

Reconstruct the North Ramp

Perform structural steel repairs

Remove and repaint steel structures

Reconstruct bus canopies

North Municipal Parking Lot - Improve drainage and pavement

Rehabilitate Employee Breezeway

Conduct Richmond Terrace Corridor Traffic Study

Page 6: Staten Island Community Board #1 - May 11, 2010May 11, 2010  · Bus Station Ramps Maintain Richmond Terrace Traffic Movements through the Corridor Maintain Bus Turning / Movements

6

Project ScheduleNTP: July 27, 2009Total Contract Duration: 1307 Days

Design: 320 daysConstruction: 987 days

Anticipated Completion: February 2013

Current Operations: Concrete encasement removalTV inspection of drainage system Construction survey Installation of shield over TWIC area

Short Term Look Ahead - (May 2010)Abrasive Blasting Pre-Stage MPTRelocate the taxi stand to the North Municipal Parking Lot

Long-er Term Look Ahead - (August 2010 – July 2011)Closure of Ramp DKiss & Ride two-way operationOld Viaduct two-way operation with two bus gates under constructionCommence New North Ramp ConstructionRehabilitate Employee Breezeway

Hours of operationDaytime 7 a.m. to 3:30 p.m. (with occasional night work)Incentive/Disincentive $16,000 per day ($3.2M cap)Liquidated Damages $3,000 per day

Page 7: Staten Island Community Board #1 - May 11, 2010May 11, 2010  · Bus Station Ramps Maintain Richmond Terrace Traffic Movements through the Corridor Maintain Bus Turning / Movements

7

Existing Terminal and Ramp Site

NYCEDC Parking

North Ramp

North Municipal Parking Lot

Staten Island Railroad

Taxi Stand

Bus Ramp D

Bus Ramp C

Bus Ramp B

Bus Ramp AOld Via

duct

Bus Ex

it Ram

p

Ramp D

Ramp C

Ramp A

Bus Entrance Ramp B

Bus Station

North

Kiss & Ride

Page 8: Staten Island Community Board #1 - May 11, 2010May 11, 2010  · Bus Station Ramps Maintain Richmond Terrace Traffic Movements through the Corridor Maintain Bus Turning / Movements

8

Community ContextSt. George Residential Community

Municipal AreaStaten Island Borough Hall

Staten Island Courthouse

Staten Island Institute of Arts & Science

Richmond County Bank Ballpark

St. George Theater

Local High SchoolsRalph R. McKee

Curtis

New York Public Library

Page 9: Staten Island Community Board #1 - May 11, 2010May 11, 2010  · Bus Station Ramps Maintain Richmond Terrace Traffic Movements through the Corridor Maintain Bus Turning / Movements

9

Maintain Access to Bus Station Ramps

Maintain Richmond Terrace Traffic

Movements through the Corridor

Maintain Bus Turning /

Movements through All Stages

Maintain Access to Kiss & Ride at All

Times

Maintain Access to Terminal

Maintain 300 Parking Spaces at

All Times

Design-Build Goal:Maintaining multiple operations at all times and minimizing disruption to patrons

Maintenance & Protection of Traffic

Vehicular MovementsPedestrian Movements

LEGEND

Ramp A

Ramp BRamp C

Ramp D

Old Viaduct

Page 10: Staten Island Community Board #1 - May 11, 2010May 11, 2010  · Bus Station Ramps Maintain Richmond Terrace Traffic Movements through the Corridor Maintain Bus Turning / Movements

10

Reconstruct Bus Station North Loading PlatformRelocate Taxi Stand

Operations

Remove Traffic Islands and Install Temporary Signals

Pre-Stage – 3 Months

Vehicular MovementsPedestrian Movements

LEGEND

Ramp A

Ramp BRamp C

Ramp D

Old Viaduct

Modify Kiss & Ride Islands

Page 11: Staten Island Community Board #1 - May 11, 2010May 11, 2010  · Bus Station Ramps Maintain Richmond Terrace Traffic Movements through the Corridor Maintain Bus Turning / Movements

11

Reconstruct Bus Station Ramps A and B and Southern Half of Old

Viaduct

Reconstruct Ramps A and D

Rehabilitate Employee Breezeway

Stage 1 – 11 Months

Vehicular MovementsPedestrian Movements

LEGEND

Ramp A

Ramp BRamp C

Ramp D

Old Viaduct

Construct New North Ramp

Page 12: Staten Island Community Board #1 - May 11, 2010May 11, 2010  · Bus Station Ramps Maintain Richmond Terrace Traffic Movements through the Corridor Maintain Bus Turning / Movements

12

Construct New North Ramp

Reconstruct Northern Half of Ramp C

Reconstruct Taxi Ramp, Bus Station Ramp D and

Northern Half of Old Viaduct

Construct Elevator Vestibule

Stage 2a – 5 Months

Vehicular MovementsPedestrian Movements

LEGEND Ramp B

Ramp D

Old Viaduct

Ramp A

Ramp C

Page 13: Staten Island Community Board #1 - May 11, 2010May 11, 2010  · Bus Station Ramps Maintain Richmond Terrace Traffic Movements through the Corridor Maintain Bus Turning / Movements

13

Reconstruct Southern Half of Ramp C

Reconstruct Taxi Ramp, Bus Station Ramp D and

Northern Half of Old Viaduct

Construct Elevator Vestibule

Stage 2b – 4 Months

Vehicular MovementsPedestrian Movements

LEGEND Ramp B

Ramp D

Old Viaduct

Ramp A

Demolish Existing North Ramp

Ramp C

Page 14: Staten Island Community Board #1 - May 11, 2010May 11, 2010  · Bus Station Ramps Maintain Richmond Terrace Traffic Movements through the Corridor Maintain Bus Turning / Movements

14

Reconstruct Bus Station Ramp C

Re-grade Parking Lot

Reconstruct Ramp B

Stage 3 - 9.5Months

Vehicular MovementsPedestrian Movements

LEGEND

Page 15: Staten Island Community Board #1 - May 11, 2010May 11, 2010  · Bus Station Ramps Maintain Richmond Terrace Traffic Movements through the Corridor Maintain Bus Turning / Movements

15

Maintenance & Protection of Traffic Stage 3

Richmond Terrace

D B

C A

NorthMunicipal Parking Lot

• Maintain 300 parking spaces during each phase of reconstruction

• Multiple construction phases to maximize space count

• Construction sequence driven by drainage installation

• Total duration: 348 days

New

North

Ram

p

Page 16: Staten Island Community Board #1 - May 11, 2010May 11, 2010  · Bus Station Ramps Maintain Richmond Terrace Traffic Movements through the Corridor Maintain Bus Turning / Movements

16

Architectural Design

Bus Canopies

Pedestrian access:

From Richmond Terrace

Within Terminal Bus Ramps

Bicycle Access

Pedestrian Breezeway Roof

Lighting

Street Furniture

Elevator Vestibule

Rehabilitate Flute Sculpture

Page 17: Staten Island Community Board #1 - May 11, 2010May 11, 2010  · Bus Station Ramps Maintain Richmond Terrace Traffic Movements through the Corridor Maintain Bus Turning / Movements

17

Old Viaduct Pedestrian Access

1

2

1 Existing Condition

2 Proposed Condition

1

Design Elements :: Pedestrian Access Improvements :: Old Viaduct

1

Page 18: Staten Island Community Board #1 - May 11, 2010May 11, 2010  · Bus Station Ramps Maintain Richmond Terrace Traffic Movements through the Corridor Maintain Bus Turning / Movements

18

1

1 Existing Condition

2 Proposed Condition

1

2

Design Elements :: Pedestrian and Access Improvements :: Old Viaduct

Old Viaduct Pedestrian Access

Page 19: Staten Island Community Board #1 - May 11, 2010May 11, 2010  · Bus Station Ramps Maintain Richmond Terrace Traffic Movements through the Corridor Maintain Bus Turning / Movements

19

Bus Platforms and Canopies Existing Condition

1

Design Elements :: Bus Platforms and Canopies :: Existing

Page 20: Staten Island Community Board #1 - May 11, 2010May 11, 2010  · Bus Station Ramps Maintain Richmond Terrace Traffic Movements through the Corridor Maintain Bus Turning / Movements

20

1

Design Elements :: Bus Platforms and Canopies :: Proposed

Bus Platforms and Canopies Proposed Rehabilitation

Page 21: Staten Island Community Board #1 - May 11, 2010May 11, 2010  · Bus Station Ramps Maintain Richmond Terrace Traffic Movements through the Corridor Maintain Bus Turning / Movements

21

Bus Platforms and Canopies Existing Condition

1

Design Elements :: Bus Platforms and Canopies :: Existing

Page 22: Staten Island Community Board #1 - May 11, 2010May 11, 2010  · Bus Station Ramps Maintain Richmond Terrace Traffic Movements through the Corridor Maintain Bus Turning / Movements

22

Bus Platforms and Canopies Proposed Rehabilitation

1

Design Elements :: Bus Platforms and Canopies :: Proposed

Page 23: Staten Island Community Board #1 - May 11, 2010May 11, 2010  · Bus Station Ramps Maintain Richmond Terrace Traffic Movements through the Corridor Maintain Bus Turning / Movements

23

Ramp B Existing Condition

1

Design Elements :: Pedestrian and Bicycle Access Improvements :: Ramp B :: Existing

Page 24: Staten Island Community Board #1 - May 11, 2010May 11, 2010  · Bus Station Ramps Maintain Richmond Terrace Traffic Movements through the Corridor Maintain Bus Turning / Movements

24

Bicycle Access Ramp B Proposed

1

Design Elements :: Pedestrian and Bicycle Access Improvements :: Ramp B :: Proposed

Page 25: Staten Island Community Board #1 - May 11, 2010May 11, 2010  · Bus Station Ramps Maintain Richmond Terrace Traffic Movements through the Corridor Maintain Bus Turning / Movements

25

Deck and Ramp PaintingSite Lighting: Helm Luminaire on 25’ Round Pole

Bus Station

Richmond Terrace

Ram

p D

Ram

p C

Ram

p B

Ram

p A

Tensile Structures, Lighting, Furnishings, and Painting

Tensile Structures Refurbishment

Site Furnishings: Benches

1

2

25’-0

Munsel Grey

1

2

Design Elements :: Other Components

“Park Vue”Refurbished Existing

Page 26: Staten Island Community Board #1 - May 11, 2010May 11, 2010  · Bus Station Ramps Maintain Richmond Terrace Traffic Movements through the Corridor Maintain Bus Turning / Movements

26

North Esplanade Extension

Page 27: Staten Island Community Board #1 - May 11, 2010May 11, 2010  · Bus Station Ramps Maintain Richmond Terrace Traffic Movements through the Corridor Maintain Bus Turning / Movements

27

Community Outreach Plan

Local OutreachSt. George Community

St. George Civic associationSt. George TheaterDowntown Staten Island CouncilStaten Island Chamber of Commerce

Staten Island Yankees OrganizationLocal High SchoolsBorough Hall, Courts and

Municipal Office Complex

Island-Wide OutreachCommutersCommunity BoardsCivic, Fraternal and Community Based OrganizationsSI Yankees FansPublic and Private Schools“Reverse Commuters”

Page 28: Staten Island Community Board #1 - May 11, 2010May 11, 2010  · Bus Station Ramps Maintain Richmond Terrace Traffic Movements through the Corridor Maintain Bus Turning / Movements

28

Community Outreach Understanding Our Island

Different communities have different concernsSt. George Community

Direct Construction Impacts NoiseNight work DustTruck routes Lead abatement

Island Wide Commuting impacts

Parking availability - maintaining 300 spacesBus relocations SIRT access

Page 29: Staten Island Community Board #1 - May 11, 2010May 11, 2010  · Bus Station Ramps Maintain Richmond Terrace Traffic Movements through the Corridor Maintain Bus Turning / Movements

29

Community Outreach Toolbox

Onsite Community Outreach Liaison

Electronic & Paper Notification Systems

Project Brochure & Quarterly Newsletters

Staten Island Advance

On-board Ferry Outreach

NYCDOT Website Updates

Page 30: Staten Island Community Board #1 - May 11, 2010May 11, 2010  · Bus Station Ramps Maintain Richmond Terrace Traffic Movements through the Corridor Maintain Bus Turning / Movements

30

Funding

• 100% funded from ARRA Stimulus Funds

• Project cost: $175 Million

• Largest fully-funded Stimulus Project in New York City

• Overseen by the Federal Transit Administration

Page 31: Staten Island Community Board #1 - May 11, 2010May 11, 2010  · Bus Station Ramps Maintain Richmond Terrace Traffic Movements through the Corridor Maintain Bus Turning / Movements

31

Questions