Chapter 1 Executive Summary_____________________________________________________________________________
_____________________________________________________________________________
Kkee and Waimea Canyon State Parks Master Plan 1-2
CHAPTER 1EXECUTIVE SUMMARY
1.1 MASTER PLAN PURPOSEKkee and Waimea Canyon State Parks were
the first parks established under the State ParkSystem. They were created in recognition of theunique environmental resources, abundantrecreational opportunities, and rich naturalheritage existing in the uplands of westernKauai.
Each year the parks are enjoyed by an estimated
300,000 people. Local residents and visitors alike
come to Kkee and Waimea Canyon State Parksfor sightseeing, recreational activities, cultural
and educational pursuits, and simply to getaway from daily routines and relax in the
beautiful mountain setting.
The tremendous popularity of the two parks istestament to the foresight of the territorialforesters who advocated their preservation inthe early 1900s, and a clear indicator of theparks continued value to the people of Hawaii.
This popularity also poses challenges to parkmanagers and caretakers who are working toensure that the parks resources can be enjoyed
by visitors today, and will be available for theexperience of future generations.
The master plan vision is to preserve andperpetuate the existing character of Kkee and
Waimea Canyon State Parks by protecting theareas unique native ecosystems, scenic views,historic and cultural landscape, and recreationalresources, and by guiding public uses and
developing park facilities in a manner that doesnot compromise the integrity of the mountainsnatural resources, wilderness values, andintrinsic qualities. Towards this end, the masterplan will guide the protection, preservation andmanagement of Kkee and Waimea CanyonState Parks for a twenty-year period extending
from 2005 to 2025.
1.2 SCOPE ANDMETHODOLOGYThe master plan project area includes Kkee
State Park (4,345 acres) and Waimea CanyonState Park (1837.4 acres), for a total area of6,182.4 acres. See Figure 1-1, Project Area Map.
The master plan study area includes the projectarea plus adjacent State-owned lands thatinclude Puu ka Pele and N Pali-Kona ForestReserves, Alakai Wilderness Preserve, Kuia
Natural Area Reserve, and the Mokihana Game
Management Area. State-owned lands alongWaimea Canyon Drive are included in the study
area as a possible location for expansion ofWaimea Canyon State Park.
The master plan was developed through a fourstep process:
BACKGROUND INVENTORYANDFACILITYASSESSMENTBackground information about park resources,
activities, operations, management, and issuesand opportunities was obtained throughresearch of existing documentation, fieldinvestigations, agency comments, and publicinput. The background studies prepared for theMaster Plan focus on the following subject areas:
Natural Resources Cultural and Historic Resources
Scenic Resources Outdoor Recreation Resources
Other issues identified by agencies and the
public.During the course of the project the followingsubject areas were added:
Recreation Residences Infrastructure
Organizational Development andManagement
Costs and Revenues
-
7/29/2019 State's Prefinal Chapter 1 (1)
2/14
Chapter 1 Executive Summary_____________________________________________________________________________
_____________________________________________________________________________
Kkee and Waimea Canyon State Parks Master Plan 1-2
-
7/29/2019 State's Prefinal Chapter 1 (1)
3/14
Chapter 1 Executive Summary_____________________________________________________________________________
_____________________________________________________________________________
Kkee and Waimea Canyon State Parks Master Plan 1-2
The findings of the background inventory andfacility assessment are presented in Chapters 3and 4 of this master plan report. ANALYSISA goal statement and list of resource values ispresented for each resource category to provideguidance for the analysis. Each resource isanalyzed in terms of its condition-fragility,resource limits (capacity), public use and user
limits (socially acceptable impacts), and issues,opportunities and constraints related toprotection, management, restoration,
development, enhancement, and interpretation.
For the parks developed resources, analysis
includes:
$ Evaluation of existing buildings todetermine if they are suitable for continuedshort-term and/or long-term use.
$ Evaluation of the historic integrity ofbuildings within the parks and assessmentof their value to Kkees cultural and
historic landscape.$ Evaluation of existing utilities, (water,
sewage, electrical-communication, and
roads) and identification of utilitydeficiencies and necessary repair work.
$ Estimation of budgetary costs for repairs topark buildings, infrastructure, and utilities,including cost estimates for demolition and
reconstruction of buildings determined to beunsuitable for continued use.
The Analysis chapter also includesrecommendations for a best managementapproach to meet the goals for each resourcecategory. Where available and applicable,financial information is presented to support
the recommendations. The results of theanalysis are presented in Chapter 5 of thisreport.
PLANALTERNATIVESDEVELOPMENT ANDEVALUATIONFour conceptual master plan alternatives arepresented for the Kkee and Waimea Canyon
State Parks. The alternatives are based onavailable information, issues, problems and
opportunities relating to the Kkee and Waimea
Canyon State Parks, the adjoining gamemanagement areas, the forest reserves, and the
Natural Area Reserve as identified bygovernment agencies and the public.
The development of the alternatives includedthe following tasks:
$ Establishment of development themes. Thealternatives express a range of developmentoptions from status quo and low-intensitydevelopment to expanded development ofpark facilities and recreational resources.
$ Identification of Recreation OpportunityZones (ROZ). ROZs are a means of geographically organizing the plan areaaccording to user expectations of wilderness and development. Five ROZsare identified for Kkee and Waimea
Canyon State Parks, including primitive,semi-primitive non-motorized, semi-
primitive motorized, rustic, andconcentrated. These designations establishlevels of access, facility development, and
environmental preservation.$ Identification of park activities, programs,
and use intensities that can beaccommodated in different planalternatives.
$ Development of a methodology forevaluating the alternatives based on costs,
public and agency comments, parkresources and recreation goals.
The four alternative plans are:
$ Alternative 1. No Action (Existing
Conditions Plan)$ Alternative 2. Remedial Improvement Plan
-
7/29/2019 State's Prefinal Chapter 1 (1)
4/14
Chapter 1 Executive Summary_____________________________________________________________________________
_____________________________________________________________________________
Kkee and Waimea Canyon State Parks Master Plan 1-2
$ Alternative 3. Limited Access /Conservation Plan.
$ Alternative 4. Enhanced Park FacilityDevelopment Plan
The planning process included a community-outreach program whereby communitymembers and interested parties/groups were
provided the opportunity to participate indeveloping plan elements, comment on plan
concepts, and vote for a preferred alternative.
The four conceptual master plan alternatives arepresented in Chapter 6 of this report. PLAN SELECTIONANDREFINEMENTBased on public input, Department of Land andNatural Resources staff and consultantrecommendations, and review by the Board ofLand and Natural Resources (BLNR) Alternative2: Remedial Improvement Plan was selected andrefined as the Preferred Alternative: ParkEnhancement Plan. The selection and refinementprocess and components of the preferredalternative are described in Chapter 6 of thisreport.
1.3 MASTER PLANSee Figure 1-2 Master Plan.The Master Plan is based on the Remedial
Improvement alternative. Improvements aregenerally limited to repairing and upgradingexisting facilities, infrastructure and utilities.
The objective is to meet regulatory standardsand to enhance the park users experience byimproving orientation, service, and safety and
by eliminating incompatible and obtrusiveelements within the parks.
Additionally, several primary destination siteswithin the parks are identified for more
intensive redevelopment to address the specialdemands placed on them. These sites includeKanaloahuluhulu Meadow and the four majorlookouts: Puu o Kila, Kalalau, Puu Hinahina,
and Waimea Canyon Lookouts.
DESIGN PRINCIPLES Planned improvements will be concentrated
within existing developed areas along theKkee Road corridor in order to minimizethe development footprint on the natural
landscape. Man-made elements are subordinate to the
natural landscape. Structures are to be
located away from primary view zones, setback from roadways and screened fromview where appropriate.
Natural materials are to be used to preservethe parks rustic character and blend into thewilderness landscape. Materials may befinished or unfinished depending onlocation and function of the structure.
LANDSCAPING ANDVEGETATIONOver time, the activities of the mountainresidents have produced a mosaic of severaldistinct landscape typologies. Though eachtypology expresses a different relationship with
the land, there is an apparent shared landscapecharacteristic of open lawn space defined and
accented with natural and introduced treeplantings. This landscape feature is emblematicof Kkee and evident throughout the public
spaces and lease lots within the two parks. It ismost prominently displayed in the openmeadow space and monumental trees ofKanaloahuluhulu.
-
7/29/2019 State's Prefinal Chapter 1 (1)
5/14
Chapter 1 Executive Summary_____________________________________________________________________________
_____________________________________________________________________________
Kkee and Waimea Canyon State Parks Master Plan 1-2
-
7/29/2019 State's Prefinal Chapter 1 (1)
6/14
Chapter 1 Executive Summary_____________________________________________________________________________
_____________________________________________________________________________
Kkee and Waimea Canyon State Parks Master Plan 1-2
Landscape design based on these typologies isappropriate for the settlement areas within thepark, such as at Kanaloahuluhulu Meadow andwithin the recreation residential areas wherepeople have asserted a human presence.
Outside of the settled areas, the naturallandscape should prevail.
Landscaping at facilities which are developed toshowcase the natural beauty of the parks, suchas the lookouts and trailheads, should be
designed to blend into the wilderness setting.Native plant materials and massing, local earthforms, and color and texture palettes drawnfrom the immediate vicinity should be used inthe design.
PARK ENTRY STATIONA new park entry station is planned for theentrance to Waimea Canyon State Park. Theentry is an essential component of the masterplan. It will serve to: Control access for park safety and resource
management. Orient and inform park visitors of services
and park features.
Establish park identity and ranger presence. Collect fees from non-resident visitors and
commercial operators.
ROADSRoads are categorized as Arterial (Kkee Road
and Waimea Canyon Drive), Collector (WainekeRoad, Mkaha Ridge Road), and Local(recreation residence access, Camp 10 Road).Improvements include:
Repair and resurface the entire length ofKkee Road. Stabilize shoulders and install
road-surface reflectors. Re-grade, gravel, and correct drainage on
unpaved collector roads. Re-grade, gravel, and correct drainage on
local roads serving recreation residences.
Repair Camp 10 Road for public access,including re-grading and graveling, andimproving stream crossings.
Improve identity and directional signage at
key intersections.
Limit bus traffic to Waimea CanyonLookout. School buses only are allowed up
to the meadow by special permits. Incorporate Kkee Road and Waimea
Canyon Drive under the managementauthority of the Division of State Parks,conditioned on funding support.
TRAILSRecommendations and planned improvements
for the trail system include: Improve identity and directional signage at
all trailheads and junctions.
Update trail guide materials and trailheadsigns to inform visitors of trail conditionsand features.
Update informational and interpretivematerials for Awaawapuhi Trail, Iliau
Nature Loop, and Nature Trail. Establish primary trailheads at Puu
Hinahina Lookout, Water Tank Trail, andKaluapuhi Trail.
Complete upgrading of Black Pipe Trail,
Ditch Trail, and Canyon Trail segments withconnection to Puu Hinahina.
Expand or improve parking at KukuiTrailhead, Nualolo Trailhead, and
Awaawapuhi Trailhead.
Develop new ADA accessible interpretive
trails to highlight four main forest typesfound in the parks.
Consider elevated canopy trails in the forest. Install boardwalk / steps along the valley
rim between Puu o Kila Lookout and Pihea
Overlook to control erosion.
KANALOAHULUHULUMEADOW / PARKHEADQUARTERSKanaloahuluhulu Meadow is the heart of Kkee
and a primary park visitor destination. Themeadow area serves several valuable park
functions: Park Identity / Landmark Ranger Presence / Visitor Service
-
7/29/2019 State's Prefinal Chapter 1 (1)
7/14
Chapter 1 Executive Summary_____________________________________________________________________________
_____________________________________________________________________________________________
Kkee and Waimea Canyon State Parks Master Plan 1-7
Park Community / Social Center
Research / Education Center Center for visitor amenities (refreshments)
Proposed improvements include: Reconstruct or replace the Kkee Lodge and
Natural History Museum buildings andintegrate a new Park Visitor Service Centerinto the new building design. The visitorcenter will be staffed by Division of StateParks (DSP) ranger or docent.
The service center will provide the
following services:- One-stop location for all park permits
(camping, gathering, fishing, hunting,commercial trail use, and school buspermits).
- Reservations and check-in/out forshort-term State rental cabins.- Visitor orientation and information.- Complaints, reports, and emergency
communications. Ensure that reconstructed buildings and
new structures meet Kkee vernacular
architectural design standards. Continue to lease Kkee Natural History
Museum operations to a nonprofit
organization, such as Hui o Laka. Restore, renovate and adapt the historic
Kanaloahuluhulu Ranger Station parkvolunteer housing and use by State Parksstaff for meeting space and storage.
Develop orchard landscape theme based onhistoric Civilian Conservation Corps (CCC)Camp plantings. Extend orchard plantingsalong the north edge of the meadow toprovide a unified landscape context for the
park buildings - Park Managers House,Kkee Lodge, Kkee Museum, and JuddPicnic Pavilion.
Continue use of CCC as an educationalcenter and field station for natural andhistoric resource research and management.
Maintain existing State cabins for short-termrental use. Outsource rental cabinoperations and maintenance through lease
to a private / nonprofit organization. Improve existing parking area. Designate
school bus parking area. Utilize permeable
materials for parking surface (e.g. grass
pavers, gravel). Landscape parking withnative plants.
Upgrade the electrical system and placeoverhead utilities underground.
Realign the road entrance at
Kanaloahuluhulu Meadow to direct vehiclesto the lodge and museum area. Create a T-intersection for continuation of Kkee Road
to the park. Develop a new DSP baseyard on Kkee
Road east of Water Tank Road. Renovate the
existing baseyard buldings at the CCCCamp.
Renovate the stone picnic pavilion and tentcampground restroom.
LOOKOUTSGeneral Replace all cesspools with septic systems,
aerobic systems or composting toilets asappropriate to the level of use.
Develop potable water system (except atPuu o Kila).
Improve informational and directionalsignage and interpretive materials.
Prohibit bus access past Waimea Canyon
Lookout. Keep lookouts free of concessions and retail
services, with the exception of WaimeaCanyon Lookout.
Waimea Canyon Lookout Re-develop visitor facilities, including
viewing platforms, bathrooms, concessionarea, new information center, andlandscaping, to achieve a cohesive design.
Re-develop the existing parking area as apedestrian drop-off and handicap parkingonly zone.
Develop a pedestrian view plaza betweenthe view platform and restrooms. Develop a new parking lot and bus staging
area below the existing parking lot.
Puu Hinahina Lookout Re-develop the lookout plaza and the
pathway to the Niihau viewing platform to
-
7/29/2019 State's Prefinal Chapter 1 (1)
8/14
Chapter 1 Executive Summary_____________________________________________________________________________
_____________________________________________________________________________________________
Kkee and Waimea Canyon State Parks Master Plan 1-7
comply with ADA accessibilityrequirements.
Construct a new ADA accessible restroom inthe lookout plaza between the parking lotand canyon viewing platform.
Develop primary trailhead facilities for the
Canyon-Ditch Trail system.
Kalalau Lookout Realign Kkee Road to create a stop-
controlled T-intersection at the entrance tothe Kalalau Lookout parking lot with right-hand turn towards Puu o Kila.
Improve pathway system to comply withADA accessibility requirements.
Expand and resurface the parking lot. Usepermeable paving materials or grass pavers.
Upgrade the walkways between the parkingarea and lookout and provide additionalpicnic tables to comply with ADAaccessibility standards.
Renovate the lookout platforms to take fulladvantage of the sweeping views along thecliff face.
Provide interpretive signage.
Puu o Kila Lookout Renovate viewing platform to provide direct
access to Pihea Trail along valley rim
alignment. Revegetate erosion scars along canyon rim
with native plants.
Reconstruct, restripe, and correct drainageproblem at parking lot.
Provide composting toilets in parking lotarea.
Improve walkway from parking lot to
viewing platform and Pihea Trailhead.
Lower Elevation TurnoutsThe Waimea Canyon State Parks lower
boundary would be extended to include new
lower elevation viewpoints. Typical amenitieswould include: safe turnout from the roadway,ADA accessible pathways, interpretive signageand other improvements to preserve the naturallandscapes and vistas along the roadwaysleading to and through the parks. Restroomswould also be considered where appropriate.
RECREATIONRESIDENCES Recreation residences located within Kkee
and Waimea Canyon State Parks are to
remain in recreational use under leases
issued by the Board of Land and NaturalResources (BLNR) pursuant to HRS, Section171-43 and Section 171-44, and Act 223.
Leaseholders will be responsible for thedevelopment and maintenance of recreationresidence buildings and infrastructure, inaccordance with lease terms and conditionsprescribed by the BLNR.
UTILITIESElectrical System Replace electrical system distribution lines.
Wastewater System Expand the Kanaloahuluhulu leach field to
handle periods of high rainfall. Replace all large capacity cesspools (20 or
more users) with wastewater collection andtreatment system.
Connect all recreation residences within the
wellhead protection zone to a wastewatercollection and treatment system.
Establish user fees to pay for operations and
maintenance costs.
Water System Replace existing water transmission and
distribution system. Extend watertransmission lines to Puu Hinahina and
Waimea Canyon Lookouts. Continue exploration for potable water
source development.
Develop a replacement and backup source ofpotable water, aprticularly at KalalauLookout. Construct a second water tank at
the main storage area. Install water meters for all major users. Develop non-potable water supply,
including dip tanks, for fighting wildlandfires in areas away from KanaloahuluhuluMeadow.
-
7/29/2019 State's Prefinal Chapter 1 (1)
9/14
Chapter 1 Executive Summary_____________________________________________________________________________
_____________________________________________________________________________________________
Kkee and Waimea Canyon State Parks Master Plan 1-7
Communication System Install solar powered emergency call boxes in
locations where historical records ofaccidents and rescue calls indicate there is aneed.
1.4 RECOMMENDATIONS/BESTMANAGEMENT APPROACHManagement recommendations represent arange of alternatives to address opportunities
and constraints identified in the backgroundresearch and through input from task forcemembers and the public.
PARKMANAGEMENT/OPERATIONS Create a Kkee Regional Authority under
DLNR that incorporates the functions of allof the divisions which operate in Kkee and
Waimea Canyon State Parks and the
surrounding forests and natural areas. Create a single DLNR interface in which the
public can obtain permits for camping,hunting, fishing, gathering, and commercialuses.
Review park services, including utility,maintenance, and visitor services, to
determine which services can be privatized.
Obtain positions and funding for thirty newpersonnel required to carry out the Master
Plan Recommendations. Coordinate park planning, management,
and operations with the Kkee State Parks
Advisory Council, in accordance withChapter 171-8.5 HRS.
NATURALRESOURCES PROTECTION Develop a monitoring program to record
changes to park conditions over time. Develop and implement recovery plans for
threatened and endangered species. Develop and implement restoration plans
for natural plant communities. Provide housing and other incentives to
support natural resource research and
volunteer work within the parks. Construct nurseries and develop native
plant outplanting program.
Develop a list of indicators to be used to
measure conditions of natural resources,facilities, infrastructure, and rates of use.
Work with conservation organizations,agencies, and volunteers to conduct naturalresource management activities, such asweed and ungulate control, fencing, and
endangered species preservation.
EDUCATIONAL/ INTERPRETIVEPROGRAMS Develop a coordinated information program
among the DLNR divisions to ensure that
visitor information and materials areconsistent.
Develop a park-wide Archaeological and
Historic Resources Management Plan to setpriorities, establish standards forinterpretive materials, and ensure
consistency of information. Use the CCC Camp facilities to conduct
educational programs on cultural activitiesin Kkee, including traditional Hawaiian
practices as well as cultural practices ofKauais other ethnic groups.
Develop and implement an educational
program to promote knowledge of theparks natural and historic resources, andthe important role the parklands continue to
play in the life of the island and state..
PUBLIC SERVICE Continue to provide State support for
annual cultural events, such as the EmalaniFestival and Banana Poka Roundup.
Establish a uniformed ranger / docentpresence in Kkee and Waimea Canyon
State Parks to reinforce the parks identityand to deter illegal activities.
1.5 COSTS AND REVENUE COSTSCapital Improvement CostsEstimated capital costs for master planimprovements total $28.3 million over the 20-year plan period. This amount does not includecosts to upgrade the recreation residences
buildings, but does include a fair share cost ofroad, water, sewer, and drainage improvementsto support the recreation residences.
-
7/29/2019 State's Prefinal Chapter 1 (1)
10/14
Chapter 1 Executive Summary_____________________________________________________________________________
_____________________________________________________________________________________________
Kkee and Waimea Canyon State Parks Master Plan 1-7
Recreation Residence Improvement CostsThe estimated cost of improvements torecreation residences is $4,325,000. This amountdoes not include infrastructure costs. It isassumed that capital improvement costs for
recreation residence structures will be borne byindividual leaseholders and will not be a Stateexpense.
Personnel CostsThe DSP will require thirty new positions to be
approved and filled in order to implementproposed Master Plan programs. Newpersonnel costs are listed in Table 1-1. In thefirst master plan phase, labor costs represent a230 percent increase over the current labor cost
of approximately $150,000.
Table 1-1Proposed Personnel Costs.Phase New Staff Cost
I 2007-2010 10 $404,100
II 2011-2015 10 $346,400
III 2016-2020 5 $182,800
IV 2021-2025 5 $175,200
Total 30 $1,108,500
Operational and Material CostsPersonnel costs are used as the basis forestimating future operational and material costs.Based on the current DSP budget, non-laboroperational and material costs comprise
approximately 50 percent of the total parkbudget. Based on this rate, operating expensesfor the first four years of the master plan areprojected in Table 1-2.
Table 1-2Estimated Operating Budget Master Plan Phase I (2007-2010)Expense 2007 2008 2009 2010
Previous years budget $300,000 $390,000 $490,000 $750,200Labor Increase $45,000 $50,000 $130,100 $129,000Non-Labor O and M Increase $45,000 $50,000 $130,100 $129,000
Total O and M Budget $390,000 $490,000 $750,200 $1,008,200% Increase over previous year 30% 26% 53% 34%
Source: DSP 2004
-
7/29/2019 State's Prefinal Chapter 1 (1)
11/14
Chapter 1 Executive Summary_____________________________________________________________________________
_____________________________________________________________________________________________
Kkee and Waimea Canyon State Parks Master Plan 1-7
REVENUEA summary of projected annual revenues to theState from proposed master plan programs andprojects is summarized in Table 1-3:
Table 1-3Projected Annual Park RevenueRevenue Source Amount
Entry Fee $725,000
Recreation Residence Lease $478,000Concession $226,101Maintenance and Service Fees $85,870Miscellaneous Permits $5,000
Total $1,519,971
Note: Projected revenue is net present value.
Entry FeeIn 2003, an estimated 430,700 people visitedWaimea Canyon State Park, according to theHawaii State Parks Survey (HTA 2004).
Establishing an entry fee for this populationoffers the single, most straight forward source ofrevenue for the parks. An entry fee may beassessed on a per person or per vehicle basis. Aper vehicle fee may encourage visitors to carpool, thus reducing the number of vehicleswithin the parks and correspondingly reduceroad andparking congestion and maintenance
requirements. Anyone holding proof ofresidency (Hawaii drivers license, Hawaii ID,
or other document) would be exempt frompaying any fees.
The HTA State Parks Survey estimates that 95%of out-of-state visitors and 99% of residentstravel to the park by private vehicle. Bus and
minivan transports account for the remainder.The average party size varies slightly for out-of-state visitors (2.5) vs. residents (2.9). Based on
these numbers, total vehicle trips to the parks
are estimated to be 172,563.
Estimated net annual income to the State fromentry fees, if implemented, is approximately$725,000. The estimate is based on a per vehiclefee of $5, and 172,500 annual vehicle trips toWaimea Canyon Lookout less 15% for personneland operating expenses. Number of vehicle
trips was derived from Hawaii Tourism
Authority data (HTA 2004). Refer to Table 7-5for more information.
The entry fee will be not be assessed to Hawaii
residents.
Recreation Residence Lease RentsFor fiscal year 2004, annual revenues to the Statefrom recreational residence lease rents wereapproximately $205,000.
A comparative analysis was conducted todemonstrate the feasibility or infeasibility andrelative merits of five management options forthe recreation residences, including privatemanagement under a master lease. Results of
the analysis include the following:
Under State management, the projected netpresent value (NPV) of revenues to the Stateover a 20-year period is $6.4 million. AnnualizedNPV revenue to the State is estimated to be$515,000.
Under a master lease, projected NPV revenuesover the same 20-year period are approximately$6.0 million to the State and $470,000 to the
master lessee. Annualized NPV revenue is
estimated to be $478,000 to the State and $44,350to the master lessee. In addition, the master
lease option meets a broad range of publicbenefit objectives, including (1) increasing thenumber of Hawaii residents using the cabins;
(2) increasing economic benefits (jobs andpayroll, net government revenues, and profits toHawaii businesses) (3) improving the quality of
the resources and facilities; and (4) assigning anequitable sharing of costs for operation andmanagement of the infrastructure and supportservices.
Concession FeesConcessions are leased by the State to a single
private operator under negotiated termsguaranteeing the State a minimum annualincome. The current lease with The Kkee
Lodge, LLC, provides to the State a minimumguaranteed annual rent of $226,101. Actual
-
7/29/2019 State's Prefinal Chapter 1 (1)
12/14
Chapter 1 Executive Summary_____________________________________________________________________________
_____________________________________________________________________________________________
Kkee and Waimea Canyon State Parks Master Plan 1-7
income to the State may be higher based on amonthly percentage of gross concession receipts.
Maintenance and Service FeesMaintenance and service fees should be charged
to park tenants, concessionaires, and lessees torecapture the true costs to operate and maintainwater, sewer, electrical and road systems.Currently, these fees amount to less than $5,000annually. Based on current expenses, potentialannual revenue from service and maintenance
fees are estimated at $85,870. This represents acost recovery and not a net gain to the State.
Miscellaneous Permits Management of park use permits, including
camping, fishing, hunting, hiking, and
commercial uses should be consolidatedwithin a single organizational entity. Permitrates should be adjusted to capturereasonable costs of maintaining theimpacted resource. No permit fees will beassessed for activities related to culturalpractices.
In practice, fees from hunting, hiking,fishing, and gathering permits do notcomprise a significant source of revenue for
the parks. They do serve a more important
function in regulating and monitoring use ofpark resources. Estimated annual revenue
from permit fees is approximately $5,000.
1.6 IMPLEMENTATIONSTRATEGIES RECREATIONRESIDENCESRecreation residence lots located within Kkee
and Waimea Canyon State Parks are to remainin recreational use.
The DSP is currently pursuing the followingactions as directed by the BLNR:
Enter into direct negotiations at a nominalrent for the lease of recreation residences tononprofit organizations holding current
leases or permits, in accordance with HRS,Section 171-43 or Section 171-43.1.
Enter into direct negotiations for one-time
only lease of recreation residences and lotsat market-based rents to existing lessees orpermittees of recreation use leases withinthe parks, pursuant to Act 223, and HRS,Section 171-44.
Issue the remaining recreation residenceleases by public auction with priority givenfirst to residents of the island of Kauai,second to residents of the state of Hawaii,
and lastly to other interested partiesregardless of residency.
Retain two (2) cabins for State use. Other terms and conditions as may be
prescribed by the Chairperson.
All disposition processes are subject toreview and approval of the Department ofthe Attorney General.
PHASING PLANThe phasing plan is used to establish prioritiesfor proposed master plan capital improvementprojects and park management programs. Thefollowing criteria will be used to prioritizeprojects:
State Parks Mission projects and programsthat are essential to fulfilling the State Parksmission to manage Hawaiis outdoor
resources for preservation, recreation, andeducation, e.g., maintenance of the areas
unique native ecosystems, vistas, trails, andhistoric-cultural landscape to ensure thatpublic use does not compromise the
integrity of the parks natural resources andintrinsic qualities.
Natural Resource Protection andManagement projects and programs thatfocus on protection of native flora, fauna,and their habitats in the parks andsurrounding natural areas, removal of
invasive flora and fauna species, protectionof significant historic and cultural sites andactivities within the parks.
Safety and Protection projects andprograms required to ensure the continuedsafety of park visitors, recreation residents,
and staff, and that are necessary to protectpark resources from imminent harm, e.g.
-
7/29/2019 State's Prefinal Chapter 1 (1)
13/14
Chapter 1 Executive Summary_____________________________________________________________________________
_____________________________________________________________________________________________
Kkee and Waimea Canyon State Parks Master Plan 1-7
fire breaks, emergency communication.
Revenue Generation projects andprograms which will immediately generaterevenue to support park operations andimprovements, e.g. park entry station.
Primary Visitor Attractions park facilitiesand programs which attract and receive thegreatest number of visitors, e.g., WaimeaCanyon Lookout, seasonal fishing and plum
picking.
Table 1-4 presents a summary of estimateddevelopment costs by phase for master planimprovements. Development costs are broken
down in Appendix A.
-
7/29/2019 State's Prefinal Chapter 1 (1)
14/14
Chapter 1 Executive Summary_____________________________________________________________________________
_____________________________________________________________________________________________
Kkee and Waimea Canyon State Parks Master Plan 1-7
Table 1-4Summary of Master Plan Costs and Phasing(2004 Dollars)PHASING RECPROGRAM 2007-2010 2011-2015 2016-2020 2021-2025 RES TOTALCIRCULATION
Entry Station $357,500 $0 $0 $0 $357,500
Arterial Roads $3,630,688 $625,000 $1,250,000 $625,000 $0 $6,130,688
Collector Roads $299,300 $333,333 $333,333 $333,333 $0 $1,299,299
Local Roads $183,840 $155,000 $150,000 $150,000 $630,000 $1,268,840
Service Roads $25,000 $106,500 $25,000 $25,000 $0 $181,500
Parking $416,000 $2,173,610 $507,000 $1,372,700 $0 $4,469,310
Trails $444,700 $301,808 $613,853 $560,973 $0 $1,921,334Subtotal Circulation $5,357,028 $3,695,251 $2,879,186 $3,067,006 $630,000 $15,628,471OPEN SPACE
NaturalResources
$45,000 $5,000 $0 $0 $0 $50,000
LANDUSERecreationResidences
$0 $0 $0 $0 $165,000 $165,000
KanaloahuluhuluMeadow /Park
HQ$71,800 $2,370,500 $1,725,300 $325,000 $0 $4,492,600
Lookouts $44,000 $2,191,000 $1,644,000 $1,183,500 $0 $5,062,500Picnic Facilities $0 $0 $367,000 $663,500 $0 $1,030,500
Utilities $589,900 $400,000 $450,000 $350,000 $110,000 $1,899,900
Subtotal Land Use $705,700 $4,961,500 $4,186,300 $2,522,000 $275,000 $12,650,500TOTAL $6,107,728 $8,661,751 $7,065,486 $5,589,007 $905,000 $28,328,971
Note: Expanded cost estimate table is presented in Appendix A.