MANDATORY SPARES(STATIC EQUIPMENT)
CCR REGENERATION PACKAGE GGSRP, HMEL
SECTION: A-4.1 6922-502-16-46-MD-101 Page 1 of 3
Format No. EIL-1641-1924 Rev.1 Copyright EIL – All rights reserved
SECTION: A-4: MANDATORY /RECOMENDED SPARES A-4.1: STATIC EQUIPMENT
CCR REGENERATION PACKAGE
PROJECT : GURU GOBIND SINGH REFINERY OWNER : HPCL-MITTAL ENERGY LIMITED PMC : ENGINEERS INDIA LTD. JOB NO. : 6922
A 20.05.2008 ISSUED FOR BIDS TG VB AKM
Rev. No Date Purpose Prepared
by Checked
by Approved
by
MANDATORY SPARES(STATIC EQUIPMENT)
CCR REGENERATION PACKAGE GGSRP, HMEL
SECTION: A-4.1 6922-502-16-46-MD-101 Page 2 of 3
Format No. EIL-1641-1924 Rev.1 Copyright EIL – All rights reserved
(A) MANDATORY SPARE PARTS 1. PRESSURE VESSELS, REGENERATION TOWER, REACTOR
Sl. No
Part Description Quantity Required
1 Bolting for each nozzle with blind/ companion flange and for each pad nozzle
10% (min. 2 nos.) for each nozzle
2 Gaskets for each nozzle with blind/ companion flange and for each pad nozzle
200 %
3 Bolting for internal flanges of each nozzle
One set for each nozzle
4 Gasket for internal flanges of each nozzle
200 %
5 Sight/light glasses assembly complete with bolting and gasket
4 sets for each installed glass.
6. Bolts, nuts, clamps, spares for demister of each size/ type
One set of each size / type
2. TUBULAR EXCHANGERS
SL. NO
PART DESCRIPTION QTY
1 Gaskets for girth joints, each nozzle with blind flange and interconnected nozzles
400%
2 Bolting (stud & nuts) 20% Bolting (Min. 4 studs and 8 nuts per joint)
3 Push Rods 100% 4 Lamiflex Sealing Strips 100%
3. ELECTRIC HEATER
SL. NO
PART DESCRIPTION QTY
1 Gaskets for girth joints, each nozzle with blind flange and interconnected nozzles
400%
2 Bolting (stud & nuts) 20% Bolting (Min. 4 studs and 8 nuts per joint)
3 Heating elements 10%(minimum 1) which shall be in-built and electrically not connected.
4. FILTERS, COALESCERS
SL.NO.
PART DESCRIPTION QTY
1 Filter Elements (Cartridges, Coalescing, separating elements)
100% for non reusable type of elements.
2 Bolting (stud & nuts) One set of each size of each nozzle 3 Gaskets 200% of each installed gasket
MANDATORY SPARES(STATIC EQUIPMENT)
CCR REGENERATION PACKAGE GGSRP, HMEL
SECTION: A-4.1 6922-502-16-46-MD-101 Page 3 of 3
Format No. EIL-1641-1924 Rev.1 Copyright EIL – All rights reserved
(B) COMMISSIONING SPARES : To be recommended and supplied by vendor. (C) TWO YEARS OPERATIONAL SPARES :
Any additional spares required over and above mandatory spares for 2 years operation including spares for electrical, instrumentation, control etc. and any special tools and tackles required for maintenance shall be quoted separately along with details.