static_events & go _ green _vinay mundada [compatibility mode]
TRANSCRIPT
-
8/7/2019 Static_events & Go _ Green _Vinay Mundada [Compatibility Mode]
1/29
STATIC EVENTS & GO GREEN !!!
By Vinay Mundada
-
8/7/2019 Static_events & Go _ Green _Vinay Mundada [Compatibility Mode]
2/29
BAJA SAEINDIA 2011 EVENT
BAJA WORKSHOP 23 JULY 2010 - MUMBAI
-
8/7/2019 Static_events & Go _ Green _Vinay Mundada [Compatibility Mode]
3/29
BAJA SAEINDIA 2011 EVENT
BAJA WORKSHOP 23 JULY 2010 - MUMBAI
-
8/7/2019 Static_events & Go _ Green _Vinay Mundada [Compatibility Mode]
4/29
EVENTS SCORING
BAJA WORKSHOP 23 JULY 2010 - MUMBAI
-
8/7/2019 Static_events & Go _ Green _Vinay Mundada [Compatibility Mode]
5/29
Zonal Level Technical Inspection
BAJA WORKSHOP 23 JULY 2010 - MUMBAI
-
8/7/2019 Static_events & Go _ Green _Vinay Mundada [Compatibility Mode]
6/29
Static Event - Scoring
Design report 100
Design evaluation 100
Cost report 50
Presentation 50
Total 300 points
BAJA WORKSHOP 23 JULY 2010 - MUMBAI
-
8/7/2019 Static_events & Go _ Green _Vinay Mundada [Compatibility Mode]
7/29
Engineering design
Points
Desi n Re ort 100
na es gn repor
Design Evaluation during main BAJA event
in Jan 2011:100 points
BAJA WORKSHOP 23 JULY 2010 - MUMBAI
-
8/7/2019 Static_events & Go _ Green _Vinay Mundada [Compatibility Mode]
8/29
Design Report
The design report should clearly explain the engineering & design
process.
The process for each sub-system could include:
1. Objectives
2. Customer requirements
3. Alternatives considered4. The result of design calculations
5. Stress Analysis
6. Testing / Validation
Design reports must follow the format for SAE Technical Papers
BAJA WORKSHOP 23 JULY 2010 - MUMBAI
-
8/7/2019 Static_events & Go _ Green _Vinay Mundada [Compatibility Mode]
9/29
Format & Deadline
The design report file must be named as:
Car #_college name
Page Limit:
, ,
of 10 pts everyday
BAJA WORKSHOP 23 JULY 2010 - MUMBAI
-
8/7/2019 Static_events & Go _ Green _Vinay Mundada [Compatibility Mode]
10/29
Design Evaluation
Design Evaluation will be conducted at the event site
on the first full day of the competition.
Design Category Points
Originality and innovation 25
Suspension and brake system 15
Power train 10
Structural design 10
Craftsmanship 10
O erator Comfort 10
Feasibility for mass production 10
Serviceability 10
BAJA WORKSHOP 23 JULY 2010 - MUMBAI
-
8/7/2019 Static_events & Go _ Green _Vinay Mundada [Compatibility Mode]
11/29
Expectations
During design evaluation team members are
expected to be able to fully explain and discuss all
aspects of their vehicles design and the rationale
r .
incompleteness will receive zero points for
Design Evaluation
BAJA WORKSHOP 23 JULY 2010 - MUMBAI
-
8/7/2019 Static_events & Go _ Green _Vinay Mundada [Compatibility Mode]
12/29
Recommendations
Focus on innovation and originality but only at
maximum 2 areas, Stick to basics otherwise.
eep n m n a s mp c y n ma n enance an
better functional ability will fetch you better
.
.
BAJA WORKSHOP 23 JULY 2010 - MUMBAI
-
8/7/2019 Static_events & Go _ Green _Vinay Mundada [Compatibility Mode]
13/29
Recommendations
While short listing the alternatives for a particular system
,
weight, driver safety, cost, serviceability and ride
u e same n e es gn repor an eep rea y a me o
Evaluation.
At the time of evaluation, make a note of specifications of each
system and display it at concerned locations
Carry a technical specification sheet for the vehicle
BAJA WORKSHOP 23 JULY 2010 - MUMBAI
-
8/7/2019 Static_events & Go _ Green _Vinay Mundada [Compatibility Mode]
14/29
Presentation: 50 points
Objective
The objective of the Presentation is for the team toconvince the executives of a hypothetical manufacturing
company o purc ase your eam s ve c e es gn
and put it into production at the rate of 4000 units per
year.
For the purposes of the presentation you may assume
executives who may have experience in marketing,
production, and finance as well as engineering.
BAJA WORKSHOP 23 JULY 2010 - MUMBAI
-
8/7/2019 Static_events & Go _ Green _Vinay Mundada [Compatibility Mode]
15/29
Scoring
organization of the presentation
effectiveness of the visual Aids
spea er s e very
BAJA WORKSHOP 23 JULY 2010 - MUMBAI
-
8/7/2019 Static_events & Go _ Green _Vinay Mundada [Compatibility Mode]
16/29
Time Limits
Presentation: 10 Min Max 2 team
members
Q/A Round: 5 Min, only judges can ask
answer
BAJA WORKSHOP 23 JULY 2010 - MUMBAI
-
8/7/2019 Static_events & Go _ Green _Vinay Mundada [Compatibility Mode]
17/29
Recommendations
Effective start that attracts attention
Ex lain demand of ATVs in other arts of world
Justify feasibility of manufacturing it in India
u orwar e a van ages an your s ra eg es oconsume the product
Conclude b a ro osal re uestin the h otheticalcompany to ix an appointment to ave urt erdiscussion
Kee in mind - I t is marketin resentation and
not technical Presentation, it must highlight allUSPs
BAJA WORKSHOP 23 JULY 2010 - MUMBAI
-
8/7/2019 Static_events & Go _ Green _Vinay Mundada [Compatibility Mode]
18/29
Cost report
Being dealt separately in the workshop
BAJA WORKSHOP 23 JULY 2010 - MUMBAI
-
8/7/2019 Static_events & Go _ Green _Vinay Mundada [Compatibility Mode]
19/29
Added advantage
The team with max oints from the first
two days gets the pole position on therd ,
events gives you an opportunity to
cap a ze on e n urance even w c
carries heavy 400 points.
BAJA WORKSHOP 23 JULY 2010 - MUMBAI
-
8/7/2019 Static_events & Go _ Green _Vinay Mundada [Compatibility Mode]
20/29
Additional added advantages
Competing for the static events brings out ones abilityto work in the team and reflects efforts put in bycaptain
It is the only competition where a team has to performand not an individual
You will be at comfort level in a cross functional
organisation
Will learn to accept and share and convince
n- u nnova ve approac as you w ave oexplore creative alternates before coming to anyconclusion.
BAJA WORKSHOP 23 JULY 2010 - MUMBAI
-
8/7/2019 Static_events & Go _ Green _Vinay Mundada [Compatibility Mode]
21/29
Professional learning
Project Management
- - -
Economical impact analysis
Value engineering
Manufacturing sequencing
Time management
BAJA WORKSHOP 23 JULY 2010 - MUMBAI
-
8/7/2019 Static_events & Go _ Green _Vinay Mundada [Compatibility Mode]
22/29
To save our mother Earth & Environment
We need to consume least possible energy since
energy generation consumes scarce natural
resources & also enerates emissions.
We need to produce least emissions from the usage
life.
We should use all recyclable and bio-degradablematerials to keep our environment clean.
BAJA WORKSHOP 23 JULY 2010 - MUMBAI
-
8/7/2019 Static_events & Go _ Green _Vinay Mundada [Compatibility Mode]
23/29
What can we do in the BAJA vehicle?
Reduce total energy consumption:
In the manufacturing if each & every part of the.
In assembling / end of line testing of the vehicle.
In regular usage / running of the vehicle:
Min. fuel & oil consumption
Min. maintenance & requirement of spare parts.
friendly & green
O timum life of the vehicle
BAJA WORKSHOP 23 JULY 2010 - MUMBAI
-
8/7/2019 Static_events & Go _ Green _Vinay Mundada [Compatibility Mode]
24/29
What can we do in the BAJA vehicle?
Reduce total energy consumption:
Recycle ability consideration at the end of life of vehicle
recyclable glass plastic & rubber parts
Non-recyclable material used in the vehicle
BAJA WORKSHOP 23 JULY 2010 - MUMBAI
-
8/7/2019 Static_events & Go _ Green _Vinay Mundada [Compatibility Mode]
25/29
Summary
Desirable characteristics for Go Green!!!
Min. kerb wt and optimum life of the vehicle
Min. fuel & oil consumption during life span of vehicle
.
Min. evaporative emissions
Components to be designed for min. material & energy
BAJA WORKSHOP 23 JULY 2010 - MUMBAI
-
8/7/2019 Static_events & Go _ Green _Vinay Mundada [Compatibility Mode]
26/29
Summary
Desirable characteristics for Go Green!!!
Min. maintenance costs to reduce consumables & spareparts thereby reducing energy consumption.
Use of recyclable material for all parts of the vehicle
Innovative schemes for extending the life of vehicle by
refurbishing / renovating parts
Innovation schemes for recycling of the complete vehicle
BAJA WORKSHOP 23 JULY 2010 - MUMBAI
.
-
8/7/2019 Static_events & Go _ Green _Vinay Mundada [Compatibility Mode]
27/29
Go Green !! Evaluation sheet
1. Kerb Weight
. ,
kms of running
3. Kerb Weight analysis:
Metal content
Glass content
Plastic content
Rubber content
Non recyclable parts content
BAJA WORKSHOP 23 JULY 2010 - MUMBAI
-
8/7/2019 Static_events & Go _ Green _Vinay Mundada [Compatibility Mode]
28/29
-
8/7/2019 Static_events & Go _ Green _Vinay Mundada [Compatibility Mode]
29/29
an ou
BAJA WORKSHOP 23 JULY 2010 - MUMBAI