status of equipment, machinery,
TRANSCRIPT
-
7/30/2019 Status of Equipment, Machinery,
1/12
V.S.B. ENGINEERING COLLEGE, KARUR
Department of Mechanical Engineering
Status of working / non-working / repair / service of equipment / items
Date: 16.05.2013Name of the Laboratory / Place: HOD Cabin
Name of
Equipment / Item
Status
(working /
not working)
Date of
Installation
Warranty
validity
Date of
service /
repair /
calibration
Date of
next
service /
repair /
calibration
OHP
(1 No)Working 11.10.07 1 Year - -
OHP
(1 No) Working 02.12.08 1 Year - -
OHP
(4 No)Working 19.06.10 1 Year - -
Wipro System
(2 No)Working 15.05.09 3 Year - -
DVD Writer(1
Nos)Working 04.06.09 NA - -
DVD Writer(1
Nos)Working 28.08.09 NA - -
Air Conditioner Working 19.08.10 1 Year - -
Name of the Laboratory / Place: Fluid Mechanics and Machinery Lab
Name of
Equipment / Item
Status
(working /
not working)
Date of
Installation
Warranty
validity
Date of
service /
repair /
calibration
Date of
next
service /
repair /
calibration
Orifice meter Working 14/6/03 12 Months - -
Venturimeter Working 14/6/03 12 Months - -
Pipe Friction Working 14/6/03 12 Months - -
Pitot tube Working 26/7/06 12 Months - -
-
7/30/2019 Status of Equipment, Machinery,
2/12
Rota meter Working 14/6/03 12 Months - -
Centrifugal Pump Working 14/6/03 12 Months - -
Reciprocating
PumpWorking 14/6/03 12 Months - -
Submersible Pump Working 14/6/03 12 Months - -
Jet Pump Working 26/7/06 12 Months - -
Gear Oil Pump Working 14/6/03 12 Months 10/11/06 -
BernoullisApparatus
Working 26/8/06 12 Months - -
Hele-Shaw
ApparatusWorking 26/7/06 12 Months - -
Flow Cup
ViscometerWorking 26/7/06 12 Months - -
Impulse Turbine
(Pelton Wheel)Working 8/5/04 1 Years - -
Reaction Turbine(Francis Turbine)
Working 8/5/04 1 Years 25/10/07 -
Kaplan TurbineWorking 5/7/05 12 Months - -
Name of the Laboratory / Place: Mechatronics Laboratory
Name of
Equipment / Item
Status
(working /
not working)
Date of
Installation
Warranty
validity
Date of
service /
repair /
calibratio
n
Date of
next
service /
repair /
calibration
Digital PID controller Working 18/07/2007 12 months - -
PLC real time
application DC
speed control
Working 18/07/2007 12 months - -
Servo controller
using closed / open
loop system
Working 18/07/2007 12 months 20/07/09 -
ELGI make
reciprocation aircompressor
Working 27/11/07 12 months - -
-
7/30/2019 Status of Equipment, Machinery,
3/12
Basic Pneumatic
Trainer kitWorking 02/08/2007
Warranty card
not received- -
Electro Pneumatic
trainer kitWorking 02/08/2007
Warranty card
not received- -
Electro Pneumatic
trainer kit with PLCWorking 02/08/2007
Warranty cardnot received
- -
230V AC to 240V
DC adapter (2 Nos.)Working 02/08/2007
Warranty card
not received- -
Ni Software solutions
Lab View PDSWorking 20/06/2007
Warranty cardnot received
- -
Ni compact DAQ
instrumentation
bundle
Working 12/07/2007 1 year - -
HCL Ezeebee
Computers (10 Nos.)Working 31/03/05 12 months -
3 KVA UPS Working 26/06/07Warranty cardnot received
05/08/09
12V/40AH AMS
tubular batteryWorking 05/08/09 3 Years - -
Name of the Laboratory / Place: Kinematics & Dynamics of machinery
Name of
Equipment / Item
Status
(working /
not working)
Date of
Installation
Warranty
validity
Date of
service /
repair /
calibration
Date of
next service
/ repair /
calibration
Turn Table
ApparatusWorking 24.6.04 1 year
Serviced on
22.6.09NA
Governor
ApparatusWorking 24.6.04 1 year NA NA
Cam Analysis Working 24.6.04 1 year NA NA
Whirling Shaft Working 24.6.04 1 year NA NA
Vibration Table
1,2Working 24.6.04 1 year NA NA
Vibration Table 3 Working 8.8.06 1 year NA NA
-
7/30/2019 Status of Equipment, Machinery,
4/12
Vibration
Frequency MeterWorking 24.6.04 1 year
Calibrated
on 23.2.0923.2.10
Gyroscope With
Digital TachometerWorking 8.8.06 1 year
Calibrated
on 23.2.0923.2.10
Multi Degree
Freedom
Suspension
Working 8.8.06 1 year NA NA
Torsional
FrequencyWorking 8.8.06 1 year
Serviced on
23.6.09
Vernier Caliper Working 29.7.05 1 year Calibrated
on 23.2.0923.2.10
Dial Gauge Working 8.8.06 1 year Calibrated
on 23.2.09
23.2.10
Stop Watch Working 8.8.06 1 year Calibrated
on 23.2.0923.2.10
Digital
StroboscopeWorking 24.6.04 1 year
Calibrated
on 23.2.0923.2.10
Rpm Indicator Working 8.8.06 1 year Calibrated
on 23.2.0923.2.10
Rpm Sensor working 8.8.06 1 year Calibrated
on 23.2.09
23.2.10
Name of the Laboratory / Place: Work Shop
Name of Equipment /
Item
Status
(working /
not working)
Date of
Installation
Warranty
validity
Date of
service /
repair /
calibration
Date of
next
service /
repair /
calibration
6" Vernier Caliper Working 29/12/2001 29/12/2002
Calibrated
on
23/2/2009
Next
Calibration
23/2/2010
Angle Grinder Mini Working 29/9/2009 29/9/2010 - -
Arc Welding
TransformerWorking 29/10/2004 29/10/2005 - -
Circular Saw Working 29/9/2009 29/9/2010 - -
-
7/30/2019 Status of Equipment, Machinery,
5/12
Demolition Hammer Working 29/9/2009 29/9/2010 - -
Digital Live Wire
DetectorWorking 29/9/2009 29/9/2010 - -
Jig Saw Working 29/9/2009 29/9/2010
Serviced
on
18/03/2010
-
Planner Working 29/9/2009 29/9/2010 - -
Range Finder Working 29/9/2009 29/9/2010 - -
Rotary Hammer Working 29/9/2009 29/9/2010 - -
Rotary Drilling
MachineWorking 29/9/2009 29/9/2010 - -
Name of the Laboratory / Place: Thermal Engineering Lab
Name of Equipment /
Item
Status
(working /not working)
Date of
Installation
Warranty
validity
Date of
service /
repair /calibration
Date of
next
service /repair /
calibration
4 Stroke Single
Cylinder Diesel
Engine With Electrical
Loading
Working 24.05.04 1 year 15.12.09 ----
4 Stroke Two
Cylinder Diesel
Engine With Hydraulic
Loading
Working 24.05.04 1 year 18.06.10 ----
4 Stroke SingleCylinder Diesel
Engine With
Mechanical Loading
Working 24.05.04 1 year 18.06.10 ----
Redwood Viscometer Working 24.05.04 1 year ---- ----
Flash And Fire Point
ApparatusWorking 24.05.04 1 year ---- ----
Energy Balance Test
Facility Of Steam
Generator
Working 13.09.04 1 year 22.10.09 ----
Single Cylinder 4- Working 01.09.06 1 year ---- ----
-
7/30/2019 Status of Equipment, Machinery,
6/12
Stroke Petrol Engine
With Data Acquisition
3 Cylinder 4- Stroke
Petrol Engine with
Morse Test
Working 01.09.06 1 year 26.04.10 ----
Refrigeration CycleTest Rig
Working 27.11.04 1 year -
A.C Test Rig Working 27.11.04 1 year 01.03.06 ----
Twin Cylinder Air
CompressorWorking 27.11.04 1 year ---- ----
LPG Refrigeration
Test RigWorking 27.11.04 1 year ---- ----
Pin Fin Apparatus Working 10.12.04 1 year ---- ----
Parallel & Counter
Flow Heat ExchangerWorking 10.12.04 1 year ---- ----
Stephen BoltsmanApparatus Working 10.12.04 1 year ---- ----
Thermal Conductivity
of InsulatingpowderWorking 11.08.06 1 year 04.09.08 ----
Conductive heat
transfer
(Guarded hot plate)
Working 11.08.06 1 year 20.6.09 ----
Lageed Pipe Apparatus Working 25.08.06 1 year ---- ----
Natural Convection
ApparatusWorking 25.08.06 1 year ---- ----
Forced Convection
ApparatusWorking 25.08.06 1 year ---- ----
Emmisivity
Measurement
Apparatus
Working 25.08.06 1 year ---- ----
Name of the Laboratory / Place: Metrology LAB
Name of Equipment
/ Item
Status
(working /
not working)
Date of
Installation
Warranty
validity
Date of
service /
repair /
calibration
Date of
next
service /
repair /
calibration
Auto collimeter Working 10/7/04 12 Months 23.02.2009 -
Sine bar with 38
piece slip gaugeWorking 10/7/04 12 Months 23.02.2009 -
Bevel protractor Working 10/7/04 12 Months - -
Vernier height gauge Working 10/7/04 12 Months 23.02.2009 -
Vernier caliper Working 10/7/04 12 Months 23.02.2009 -Surface plate W/O Working 10/7/04 12 Months 23.02.2009 -
-
7/30/2019 Status of Equipment, Machinery,
7/12
stand
Tool maker
microscopeWorking 10/7/04 12 Months -
Screw micrometer Working 10/7/04 12 Months 23.02.2009 -
Electrical comparator Working 22/9/04 12 Months - -
Gear tester Working 5/10/04 12 Months - -Optical comparator Working 29/11/04 12 Months - -
Profile projectors Working 12/8/08 12 Months 23.02.2009 -
Vernier depth gauges Working 12/8/06 12 Months - -
Temperature
measuring setupWorking 12/8/06 12 Months - -
Displacement
measuring setupWorking 12/8/06 12 Months - -
Force measuring
setupWorking 12/8/06 12 Months - -
Vibration measuring
setupWorking 12/8/06 12 Months
- -
Torque measuring
setupWorking 12/8/06 12 Months
- -
Floating carriage
micrometerWorking 12/8/06 12 Months
- -
Fire extinguisher
(ABC 2 kg)
Working
12/8/06 5 Year
- -
Air Conditioner
(2 Nos)Working 15/06.04 1 Year 19-07-2011 -
Name of the Laboratory / Place: Strength of Materials lab
Name of Equipment /
Item
Status
(working /
not working)
Date of
Installation
Warranty
validity
Date of
service /
repair /
calibration
Date of
next
service /
repair /
calibration
REE Brand Universal
Testing MachineWorking 12.2.2004
1 year from
date of
installation
Calibrated
on
26.3.2009
Repair
serviced on
12.7.10
-
REE Brand Rockwell
Hardness Testing
Machine
Working 12.2.2004
1 year from
date of
installation
Calibrated
on 26.3.09 -
REE Brand BrinellHardness Testing
Working 12.2.2004 1 year fromdate of - -
-
7/30/2019 Status of Equipment, Machinery,
8/12
Machne installation
REE Brand Izod/
Charpy Impact Testing
Machine
Working 12.2.2004
1 year from
date of
installation
Calibrated
on 26.3.09 -
REE Brand Springtesting machine with
Tension and
compression
attachment
Working 12.2.2004
1 year fromdate of
installation
Calibratedon 26.3.09
-
Torsion Testing
MachineWorking 8.3.2004
1 year from
date of
installation
- -
BV- 120 Vickers
Hardness testing
Machine
Working 17.8.2006
1 year from
date of
installation
Repair
Serviced on
27.3.2009
-
FTG 8CD FTM
Make fatigue Testing
machine
Working 5.09.2006
1 year from
date of
installation
- -
Share A Hardness
tester Working 8.9.2006
1 year from
date ofinstallation
-
-
Metavision Inclined
Binocular
metallurgical
microscope
Working 8.9.2006
1 year from
date of
installation
- -
Muffle furnace Working 8.9.2006
1 year from
date of
installation
Calibrated
on 26.3.09 -
Name of the Laboratory / Place: CAD / CAM
Sl.No
Name of Equipment /
Item
Status
(working /
not
working)
Date of
Installation
Warranty
validity
Date of
service /
repair /
calibration
Date of
next
service /
repair /
calibration
1. Wipro systems ( 60 nos) working 22.08.09
3 years
onsite
warranty
----- -----
2. HCL Server (1 no) working 19.08.09 19.08.10 ----- -----
-
7/30/2019 Status of Equipment, Machinery,
9/12
3.Laser canon printer (1
no)working 20.10.09
2 years
onsite
warranty
----- -----
4.HP Design jet 110 plus
plotter (1 no)
working 1.12.09
1 year
onsite
warranty
----- -----
5.
ANSYS software ( 25
users)
version 12.0
working 29.06.09
1 year
onsite
warranty
----- -----
6.AutoCAD (15 nos )
Version - 2009working 30.03.09
1 year
onsite
warranty
----- -----
7.CNC Simulation
software (1 no)working 29.11.04
1 year
onsite
warranty
----- -----
8. UPS ( 1 no ) working 28.1.08
1 year
onsite
warranty
----- -----
9. Batteries ( 20 nos ) working 28.1.082 yearsonsite
warranty
----- -----
10.CNC Lathe( XL TURN )
(1 no)working 03.12.04
1 year
onsite
warranty
22.06.09 &
24.06.09-----
11.CNC milling ( XL MILL)
(1 no)working 03.12.04
1 year
onsite
warranty
22.06.09 &
24.06.09-----
12.WIPRO EX 330+
Dot matrix Printer
- (1 no)
working 04.08.05
1 year
onsite
warranty
----- -----
13.WIPRO 330+ DOT
MATRIX PRINTER---- (1 no)
working 08.07.06
1 year
onsite
warranty
----- -----
14.Fire extinguisher (Co2)
-- (1 no)
working 04.03.09 ------- ----- -----
The PCB of Hitachi Air conditioner 16.5 ton capacity was dismantled by the supplier and
sent for repairing and will be returned after 10days from 21-07-2011
Name of the Laboratory / Place: Manufacturing Technology Lab
Sl.No
Name of Equipment
/
Item
Status
(working
/
not
working)
Date of
Installation
Warranty
validity
Date of service
/ repair /
calibration
Date of
next
service /
repair /
calibration
-
7/30/2019 Status of Equipment, Machinery,
10/12
1. HEAVY DUTY
LATHEworking 05/07/2003 NA -
-
2. LIGHT DUTY
LATHE
working 05/07/2003 NA 9/10/2007-
3. LIGHT DUTY
LATHEworking 05/07/2003 NA 9/10/2007
-
4. LIGHT DUTY
LATHEworking 05/07/2003 NA 9/10/2007
-
5.
UNIVERSAL
MILLING
MACHINE
working 05/07/2003 NA NA
-
6. 3 HP MOTOR (HVYDTY)
working 05/07/2003 NA NA
-
7. 1.5 HP MOTOR
(FITTED)working 05/07/2003 NA NA
-
8. 1 HP MOTOR
(FITTED)working 05/07/2003 NA NA
-
9. 8" CHUCK
FLANGESworking 05/07/2003 NA NA
-
10. REVERSE FF
SWITCHworking 05/07/2003 NA NA
-
11.4 JAW CHUCK 12"
working 05/07/2003 NA NA-
123 JAW CHUCK 10"
working 05/07/2003 NA NA-
13
3 JAW CHUCK 6.5"
working 05/07/2003 NA NA-
14 FLAT BELT
NYLONworking 05/07/2003 NA NA
-
15 1 HP MOTOR
(FITTED)working 10/07/2003 NA NA
-
16
DOL BUSH
STARTER
(FITTED)
working 10/07/2003 NA NA
-
17 V BELT working 10/07/2003 NA NA -
-
7/30/2019 Status of Equipment, Machinery,
11/12
184 JAW CHUCK
working 10/07/2003 NA NA-
19ANTI VIBRATION
MOUNTworking 10/07/2003 NA NA -
20 ROPE GADI working 10/07/2003 NA NA-
21THREAD PITCH
GUAGEworking 29/07/2003 NA NA
-
22SHAPING
MACHINEworking 29/07/2003 NA 09/07/2007
-
23
THREAD MASTER
GUAGE working 19/08/2003 NA NA
-
24REVOLVING
CENTERworking 19/08/2003 NA NA
-
25VERNIER
CALIPER 12"working 19/08/2003 NA 23/02/2009
-
26MICROMETER
OUTSIDEworking 19/08/2003 NA 23/02/2009
-
27 5/16 ALLEN KEY working 23/09/2003 NA NA-
28
PILLER TYPE
DRILLING
MACHINE
working 24/09/2002 NA NA
-
29LIGHT DUTY
LATHE (STAR)working 19/08/2003 NA NA
-
30LIGHT DUTY
LATHE (JD)working 19/08/2003 NA 9/10/2007
-
31LIGHT DUTY
LATHE (GANG)working 19/08/2003 NA 9/10/2007
-
32 LIGHT DUTY
LATHE (HIND)working 19/08/2003 NA 9/10/2007
-
33 SHAPPING
MACHINE (MAL)working 19/08/2003 NA NA
-
34TURRET LATHE
working 19/08/2003 NA NA
-
-
7/30/2019 Status of Equipment, Machinery,
12/12
35
LIGHT DUTY
LATHE
(SOMNATH)
working 19/08/2003 NA 9/10/2007
-
36
LIGHT DUTY
LATHE
(KIRLOSKAR)
working 19/08/2003 NA 9/10/2007
-
37 LIGHT DUTY
LATHE (CBE)working 19/08/2003 NA NA
-
38
RADIAL
DRILLING
MACHINE
working 19/08/2003 NA 9/10/2007
-
39 SLOTTING
MACHINEworking 12/02/2005 12/02/2006 NA
-
40 MILLINGMACHINE VICE working 23/07/2003 NA NA -
41
SURFACE
GRINDING
MACHINE
working 27/07/2005 27/07/2006 1.9/10/2007 &
422.12/08/2010
-
42MAGNETIC
CHUCKworking 27/07/2005 NA NA -
43DIMOUND
DRESSERworking 27/07/2005 NA NA
-
44 BENCH GRINDER working 05/12/2005 NA NA-
45GEAR HOBBING
MACHINEworking 27/07/2005 27/07/2006 NA
-
46 CAPSTAN LATHE working 24/08/2005 24/08/2006
23/09/2009
(MOTOR
COIL
REWINDED)
-
47 ACCESSORIES OFCAPSTAN
working 01/10/2005 NA NA-