status of precaststatus of precast … concrete bim standards meeting p t w kfl i iti l d t...
TRANSCRIPT
Precast Concrete BIM Standards Meeting
P t W kfl I iti l D t tiPrecast Workflow Initial Demonstration
STATUS of PRECASTSTATUS of PRECAST PROJECT BIM EFFORTS in
the US
Chuck Eastman
As presented by the following at the 2011 PCI convention – Salt Lake City, UT
Chuck Eastman
Shiva Aram
Manu Venugopal
Rafael Sacks
Salt Lake City, October, 2011PCI Convention
Rafael Sacks
Ivan Panushev
Precast Concrete BIM Standards Meeting
P t W kfl I iti l D t tiPrecast Workflow Initial Demonstration
ParticipatingParticipating Companies:
• Tekla
• Structureworks
• Vectorworks
Chuck Eastman
• Vectorworks
• Nemetschek – Scia
Chuck Eastman
Shiva Aram
Manu Venugopal
Rafael Sacks
• Solibri IFC Viewer• Nemetschek IFC Viewer
Salt Lake City, October, 2011PCI Convention
October 25, 2011Rafael Sacks
Ivan Panushev
The Interoperability ChallengeThe Interoperability Challenge
Review of the Precast BIM Standard and its History
Background
Why interoperability is important
Why is it hard?Why is it hard?
The National BIM Standard approach- implementation- procedures- testing and certification
The agenda todayThe agenda today
Salt Lake City, October, 2011PCI Convention
CPF Projects in InteroperabilityCPF Projects in Interoperability
Major funding
Precast National BIM
Structural Design to Structural Detailing (ATC-75) – 2007 -2008
Georgia Tech Technical Team
Ch k E
Precast National BIM Standard – 2008 --
Precast National BIM Chuck Eastman
Shiva Aram
Manu Venugopal
Precast National BIM Standard – 2011 --
CIS/2 h Manu Venugopal
Rafael Sacks
Ivan Panushev
CIS/2 exchange certification – 2004 --
Salt Lake City, October, 2011PCI Convention
Ivan PanushevGSA Model Views GSA-002, GSA-006 - 2010
ModelModel‐‐based Data Sharingbased Data Sharing
StructureWorks
Bentley® ProConcrete™ V8iBentley ProConcrete V8i
AllplanStr ct re orksStructureworksPiece Tracker
Salt Lake City, October, 2011PCI Convention
Importance of InteroperabilityImportance of Interoperability
Salt Lake City, October, 2011PCI Convention
Building model data is rich and complexBuilding model data is rich and complex
A precast Piece has multiple shapes:A precast Piece has multiple shapes:
Intent
Sh M d lBatter Camber
A bl M d lBatter Shop Model Assembly ModelBatter
Length before tensioning, batter ends, non-cambered
Length after tensioning, batter ends, cambered
Salt Lake City, October, 2011PCI Convention
Building model data is rich and complexBuilding model data is rich and complex
Shape method – B-rep, CSG solid, extrusion or other sweep
directionpositive_length_measure
clash detection and spatial
subtraction
& length
Boundary representation Polygon faced extrusion
face_surface
and spatial layout
& length
editing and refinement
Different kinds of geometry needed for different purposes
Salt Lake City, October, 2011PCI Convention
Need for model viewsNeed for model views
Why is there a need Model Views?
precast engineering scheduling precast fabricationExampleUse Cases
IFC, CIS/2 or others Model SchemaSchema
IFC is a rich set of structures covering most information
Highly redundant
Salt Lake City, October, 2011PCI ConventionGeorgia Tech
IFC is a rich set of structures covering most information needed for design, analysis, procurement, fabrication planning and fabrication automation – an ISO standard
Precast Concrete NBIMS ProcessPrecast Concrete NBIMS Process
What is the National BIM Standard?
We are following and validating the national BIM standard process, defined in:
National BIM Standard Version 1 - Part 1: Overview, Principles, and Methodologies
National Institute of Building Science
Draft: January 14, 2008
National Institute of Building ScienceBuildingSMART
Federal Facility CouncilNational Institute of Standards and Technology
Available in:
htt // f ilit i f ti il /bi / bli ti h
Salt Lake City, October, 2011PCI Convention
http:// www.facilityinformationcouncil.org/bim/publications.php
Overview of NBIMS processOverview of NBIMS process
Scope of Process Phases
Program: What is the requirement?organi e domain e perts in target area- organize domain experts in target area
- determine scope of coverage - define process model of exchanges - specification of exchange requirements by d i t 6 10 M thdomain experts 6-10 Months
Design: How to solve the requirements?- definition of model views as Concepts - mapping required semantics to schema structures - define IFC bindings 6-12 months
Construct: How to build it?Construct: How to build it?- thorough unit testing- verify software implementation - develop test model views for each exchange
6-14 months
Salt Lake City, October, 2011PCI Convention
6 14 months
Deployment: Use in Industry- field testing ongoing
Time: 18-36 months
Requirements definition – IDM workflows
PCI team identified 28 exchanges
Salt Lake City, October, 2011PCI ConventionDefine relevant exchanges
IDM Exchange Requirements
Exchange Requirements- the information content of exchanges, defined functionally
General Information Attribute sets Attributes/relations Required? Exchange ExchangeGeneral Information categories
Information items within category :
Attribute sets relevant for category
Attributes/relations Required?
Type?
Features?
geometry
relationsattributes
Exchange model 1
Exchange model 2
pieceGrade Beam, Pier g y
Structural
relationsattributes
Placement relations
piece families, reinforcing. analysis model
,Cap, Spread footing, Slab on Grade Structural
loads
Material
model, loads, connections, finishes
Grade, Stem Wall, Retaining wall, Drilled Pier,
PCI Committee specified exchange contents
Connections
Status
Cassion, Pile, Pile Cap
Salt Lake City, October, 2011PCI Convention
GOAL: to define information requirements in adequate detail to drive implementation
Information Delivery Manual
IDM Exchange Specification
y
1. Process model with exchangewith exchange definitions
2. Exchange requirements
3. Narrative interpretation
Salt Lake City, October, 2011PCI Convention
Identify IFC equivalent of requirements
IDM Requirements
1 2
IFC information
model
Native information
model
Model View Definition(MVD)
1. Identify the IFC entities that represent the IDM requirements
2. For each application, find the native data entities that
Salt Lake City, October, 2011PCI Convention
correspond to the IDM requirements and IFC entities3. Implement mappings in one or both directions
Model View Implementation Tools
Salt Lake City, October, 2011PCI Convention
IFC Concept Specification
Salt Lake City, October, 2011PCI Convention
IFC Concept Specification
133 Concepts for precast,31 of them are re-used from other MVDsother MVDs
Salt Lake City, October, 2011PCI Convention
MVD Binding Documents: Assessment
Status of Precast BIM Standard:
Revise implementation to be initiated using IFC 2x3
Model View specification completed in December 2010
Develop test cases, for both import and export, detailing exchange contentsDecember 2010
Was specified in 2x4, to address weak or missing information in
Engage software companies in translator implementation processmissing information in
2x3
2x4 has been delayed multiple times not
p p
Beginning implementation, to get the process started; not a multiple times, not
expected now until 2013
In early 2011
pcomplete project
Constrained by software companies
Salt Lake City, October, 2011PCI Convention
In early 2011, developed test models, supporting debugging
pimplementation schedules
Precast Concrete BIM Standards Meeting
Workflow Across Multiple Applications forPCI Convention
VectorworksTekla SCIA Part
ARCHITECTURE DETAILINGMANAGEMENT
Tekla Manager
Structureworks
P tStructureworksSCIA
engineerENGINEER
Part Manager
NOTE: Fully editable models cannot be transferred from one diti li ti t th th l d l i i
Salt Lake City, October, 2011PCI Convention
editing application to another; the rules and logic are unique.
Precast Concrete BIM Standards Meeting
Workflow Across Multiple Applications forPCI Convention
VectorworksTekla SCIA Part
ARCHITECTURE DETAILINGMANAGEMENT
Tekla Manager
Structureworks
P tStructureworksSCIA
engineerENGINEER
Part Manager
Good exchanges have complex content
Of 133 Concepts the demo has shown about 50 of them
Salt Lake City, October, 2011PCI Convention
Of 133 Concepts, the demo has shown about 50 of them
Expand the base of ParticipantsExpand the base of Participants
StructureWorks
Bentley® ProConcrete™ V8iYou have the most
Bentley ProConcrete V8i influence in the rate of implementation
AllplanS k
p
StructureworksPiece Tracker
Salt Lake City, October, 2011PCI Convention
Complete the Precast StandardComplete the Precast Standard
Systems (slabs stairs raker beams P-cells tube – what else?)Systems (slabs, stairs, raker beams, P cells, tube what else?)
camber and twist parameters; precast piece properties
connection shape modifications to precast pieces also blockouts – external -connection shape modifications to precast pieces, also blockouts external , Internal connections reveals and other features
metadata and status information, tracking GUIDs
material and mix properties
structural analysis model and its relations to physical pieces
Embeds, lifting hardware and joints
reinforcing and tendons and their properties
architectural pieces with finishes, surface profiles
external library references
Salt Lake City, October, 2011PCI Convention
joint information
Summary
Technical and Committee Tasks:
Broaden software company participation
Extend set of test models for testing
Work with software companies in their implementation
Develop test suite for certification
Need for a review with committee on technical aspects: P-sets plant managementaspects: P sets, plant management,
Complete work – end of 2012
Salt Lake City, October, 2011PCI Convention
MVD Binding Documents: Assessment
Status of Precast BIM Standard:
Assessment of Model View BIM Standards:
Model View specification completed in December 2010
Standards:
Time consuming to develop – 18-36 mos.
December 2010
Was specified in 2x4, to address weak or missing information in
Very rigid: good for contractual pass-offs, poor for collaboration
missing information in 2x3
2x4 has been delayed multiple times not
Very much a black-box, content not easily understood by casual usersmultiple times, not
expected now until 2013
In early 2011
users
Testing is onerous; SW companies will be reluctant to support many
Salt Lake City, October, 2011PCI Convention
In early 2011, developed test models, supporting debugging
reluctant to support many MVDs
Precast Concrete BIM Standards Meeting
Salt Lake City, October, 2011PCI Convention