CALICE meetingKyushu Universty

07/03/2016

Status of the SiW-ECAL prototype

Vincent BoudryÉcole polytechnique, Palaiseau

TNA support + WP14

Page 2: Status of the SiW-ECAL prototypepolyboudry/SiW-ECAL/2016-03-07_Status_ILD_SiW_EC… · Vincent.Boudry@in2p3.fr Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 7/28 Analyses

[email protected] Title | Meeting, Place | Date 2/28

Analyses from 2015 BT

Preparation of 2016 BT– Long Term Plans

ILD Studies– Thermal studies

– SK2A

– Long SLAB tests

Page 3: Status of the SiW-ECAL prototypepolyboudry/SiW-ECAL/2016-03-07_Status_ILD_SiW_EC… · Vincent.Boudry@in2p3.fr Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 7/28 Analyses

[email protected] Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 3/28

Beam test at CERN nov 20152–16th of november

Page 4: Status of the SiW-ECAL prototypepolyboudry/SiW-ECAL/2016-03-07_Status_ILD_SiW_EC… · Vincent.Boudry@in2p3.fr Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 7/28 Analyses

[email protected] Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 4/28

Side running

Paolo Meridiani (Milano):

test of prototype MicroChannel Plateswith MgO coating in a small vacuum chamber

Since 11th November

HI muon beam

Taikan Suehara(Kyushu U., CALICE)

Test of alternativeGuard Ring designon babywafers(3×3cm²)

Noise pbms

HI muons beam

Page 5: Status of the SiW-ECAL prototypepolyboudry/SiW-ECAL/2016-03-07_Status_ILD_SiW_EC… · Vincent.Boudry@in2p3.fr Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 7/28 Analyses

[email protected] Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 5/28

Running conditions

4 layers ready for TB on test plates and put in the setup, the last layer was not operational (faulty HV) and wasnot used.

– Position of layers: beam → DIF1, DIF2, DIF0

– Each layer had 4 x 256 pixels / channels.

– All layers were always power pulsed.

Spills: Several settings tried,

– mainly long spills (eg. 200 + 50 msec = data taking + readout/dead time) to increase statistics with SPS spills of afew seconds, so, effectively corresponding to quasi-continuous mode.

– Also, some special runs with short spills 2.5 + 247.5 msec (no BX clock cycling)

DAQ: No problems with configuration of the setup.

High Gain: All data have been taken with feedback C=1.2 pF (nominal value is 6 pF)

– 5 times higher gain and better S/N (unexpected), but lower dynamic range

Selected trigger threshold = 230 after suppression of noisy cells

– much better than in cosmic runs one year ago (~290) but ≥ 220 (used for 2013 cosmic runs PCB (FEV8) ).

– Special runs with a few triggering cells in showers

Page 6: Status of the SiW-ECAL prototypepolyboudry/SiW-ECAL/2016-03-07_Status_ILD_SiW_EC… · Vincent.Boudry@in2p3.fr Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 7/28 Analyses

[email protected] Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 6/28

Very smooth running

DAQ: single crash (due to unchecked scripting)

Many many data taken (but “only” ~85 GB)

– Beam structure + ACQ for ILC (burstsof 50ms × 4Hz)

Muons runs

– Calibation first @ high threshold

– variation of threshold, and angles (49°, 90°)

Electrons of 15, 30, 50, 100, 150 GeV

– with 8.5 X0

– with mini-cal option this WE

Pions of 50 and 150 GeV with 1.75 λ

– Check non un-conventionnal events

Masking : 2.2% of all channels

Muon beam spots (X-Y distribution ofN triggers, requiring ADC-pedestal>10)from typical muon run 361 as example

Page 7: Status of the SiW-ECAL prototypepolyboudry/SiW-ECAL/2016-03-07_Status_ILD_SiW_EC… · Vincent.Boudry@in2p3.fr Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 7/28 Analyses

[email protected] Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 7/28

Analyses

1st : verification of behaviour with simple events

– SK2 response ⇐ was a priority for SK2A prod

– Filtering Noise and establishing clean events

2nd : check of collective response

– Correlation between plates

– Modelling of shower response

• G4 MC being written by A. Psallidas (National Taiwan University, CMS)

Examples given hereanalyses fromV. Balagura, K. Shpak

Page 8: Status of the SiW-ECAL prototypepolyboudry/SiW-ECAL/2016-03-07_Status_ILD_SiW_EC… · Vincent.Boudry@in2p3.fr Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 7/28 Analyses

[email protected] Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 8/28

Triggered Noiseby Vladislav Balagura

Distribution of Number of successive BX by classes (of10) of Max(ADC-pedestal) for All Chips or Single Chips

– ≠ red and blue ⇒ retrigger in common.

• This is the case for peak at zero

Not seen in DIF0 ⇒ thr. lowering limit due to re-triggering.

– even in “clean” DIF0&1: 25% of events have RTfor 50% of SK2 memory

(ADC – pedestal) in DIF 2 and DIF 0 for comparison (DIF 1 is even better), all channels combined,

Page 9: Status of the SiW-ECAL prototypepolyboudry/SiW-ECAL/2016-03-07_Status_ILD_SiW_EC… · Vincent.Boudry@in2p3.fr Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 7/28 Analyses

[email protected] Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 9/28

Threshold level scansby Vladislav Balagura

Page 10: Status of the SiW-ECAL prototypepolyboudry/SiW-ECAL/2016-03-07_Status_ILD_SiW_EC… · Vincent.Boudry@in2p3.fr Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 7/28 Analyses

[email protected] Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 10/28

Threshold level scansby Vladislav Balagura

⇒ efficiency at MPV=60: eff ~ 96%, eff=50% at about 30 ADC counts.

Page 11: Status of the SiW-ECAL prototypepolyboudry/SiW-ECAL/2016-03-07_Status_ILD_SiW_EC… · Vincent.Boudry@in2p3.fr Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 7/28 Analyses

[email protected] Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 11/28

Features of SK2by Vladislav BalaguraRetrigger pattern:

– Chain of re-triggers until Nch=64

• due to global ped. shift resetted ch by ch.until all have triggered (best expl.)

– pedestals shift seen in ADC

Pedestal splitting is channeland layer dependant

Shift doesn’t affect physics signal (mip here)

Page 12: Status of the SiW-ECAL prototypepolyboudry/SiW-ECAL/2016-03-07_Status_ILD_SiW_EC… · Vincent.Boudry@in2p3.fr Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 7/28 Analyses

[email protected] Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 12/28

Square eventsby Kostya ShpakNormal event Shoot @ 90°

4 Sq in 1 event

5 squaresin 4 events

Tools ready for statistical caracterisation

Page 13: Status of the SiW-ECAL prototypepolyboudry/SiW-ECAL/2016-03-07_Status_ILD_SiW_EC… · Vincent.Boudry@in2p3.fr Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 7/28 Analyses

[email protected] Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 13/28

Others (not devoppeled here)

Masking verification: some issues

Data corruption

– in case readout time wasn’t sufficient

• corrected by DAQ settings

Negative signal (ADC=4)

– located near the DIF connectors

Pedestal stability

– Slow drift after power one on longperiod

Splitted and delayed triggers

Chip full events

Un-operationnal chips if SCA=15 in ACQ-1

Pedestal width:

– S(MIP) / RMS(pedestal) =17..18.

• Good even for short spills with “real”power pulsing and drift effects

Page 14: Status of the SiW-ECAL prototypepolyboudry/SiW-ECAL/2016-03-07_Status_ILD_SiW_EC… · Vincent.Boudry@in2p3.fr Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 7/28 Analyses

[email protected] Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 14/28

BT in 2016 and beyond

Page 15: Status of the SiW-ECAL prototypepolyboudry/SiW-ECAL/2016-03-07_Status_ILD_SiW_EC… · Vincent.Boudry@in2p3.fr Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 7/28 Analyses

[email protected] Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 15/28

Beam test in 2016

Real calorimetric tests with 7–12 SLAB’s in coordination with SDHCAL

– 7 ASU ready; production should resume in april

– real SLAB’s (no more test plates) prod (will) start(ed) this month: see Roman’s talk

• improved S/N ratio, robustness

– dependant on beam period (still under discussion)

• eventually could re-use some the CMS time in sept/oct.

Flexible structure to accommodate

– variable number of SLAB’s

– be in “real conditions” for PFA tests:

• 24 X0 of W + 3 cm hgap before SDHCAL

Page 16: Status of the SiW-ECAL prototypepolyboudry/SiW-ECAL/2016-03-07_Status_ILD_SiW_EC… · Vincent.Boudry@in2p3.fr Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 7/28 Analyses

[email protected] Title | Meeting, Place | Date 16/28

Test of HW: long slab

– Long slabs: what can’t be done with a small RA source ?

– perf in strong B field, with PP.

Page 17: Status of the SiW-ECAL prototypepolyboudry/SiW-ECAL/2016-03-07_Status_ILD_SiW_EC… · Vincent.Boudry@in2p3.fr Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 7/28 Analyses

[email protected]

Test of PFA’s

ECAL standalone

– separation of showers studies (γ’s, e’s) ⇒ tracking in front ?

• e+γ beam (thick target with a magnet in front ~10 m)

ECAL + HCAL

– SW superposition of showers γ/e + h

– Physical superposition of showers (h+γ ?)

Test of PFA in B field

– Tracking, B effect in RPC’s (?)

on mechanics with PP,

– ⇒ Reduction in size of the SHDCAL (last 10 layers) to fit in the M1 magnet in H2B ?

• (~30 cm missing) ?

Page 18: Status of the SiW-ECAL prototypepolyboudry/SiW-ECAL/2016-03-07_Status_ILD_SiW_EC… · Vincent.Boudry@in2p3.fr Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 7/28 Analyses

[email protected]

ILD related studies

Page 19: Status of the SiW-ECAL prototypepolyboudry/SiW-ECAL/2016-03-07_Status_ILD_SiW_EC… · Vincent.Boudry@in2p3.fr Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 7/28 Analyses

[email protected] Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 19/28

Integration in ILD: thermal studiesby Denis GRONDIN / Julien GIRAUD (LPSC)

Page 20: Status of the SiW-ECAL prototypepolyboudry/SiW-ECAL/2016-03-07_Status_ILD_SiW_EC… · Vincent.Boudry@in2p3.fr Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 7/28 Analyses

[email protected] Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 20/28

Integration in ILD: thermal studiesby Denis GRONDIN / Julien GIRAUD (LPSC)

Heat exchanger assembly15 -SLAB’s in EUDETmodule

Insulation

Page 21: Status of the SiW-ECAL prototypepolyboudry/SiW-ECAL/2016-03-07_Status_ILD_SiW_EC… · Vincent.Boudry@in2p3.fr Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 7/28 Analyses

[email protected] Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 21/28

Integration in ILD: thermal studiesby Denis GRONDIN / Julien GIRAUD (LPSC)

8 day period

Conclusion:

– Efficiency of ex. isolation ✔

– Thermal test takes time…

Ready for cooling tests...

3 day period

Power without cooling

– P= 15.476 W

Peaks in external temp due to directsunlight

Page 22: Status of the SiW-ECAL prototypepolyboudry/SiW-ECAL/2016-03-07_Status_ILD_SiW_EC… · Vincent.Boudry@in2p3.fr Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 7/28 Analyses

[email protected] ILD SiW-ECAL optiminsation | ILD SW & Optim WS | 25/02/2016 22/28

Simulation modificationsSlide from Sept 2014

Cleaning & adapatation of ECAL Mokka drivers:[D. Jeans + J. Marshall + E. Becheva + V. Boudry + Dan Yu]

– Many cleaning made by D. Jeans ⇒ SECal05

• Bugs, improved GEAR output, handling of pre-shower

– Documentation being reviewed

– TBD: Implementation of SEcal05 in DDHEP (based on S. Lu implementation of SEcal04 + tests)

• Done for CLICdp by D. Protopopescu & M. PetricNeeds to be review / adapted for ILD vs SECal04

New ECAL Driver (SEcal06) to correct defects (mostly in Endcaps).

– Missing dead materials, “corners”

– Consistant treatment of Barrel/Endcaps

– Better handling of Layers, optionnal pre-shower

Status of Sept 2014

Page 23: Status of the SiW-ECAL prototypepolyboudry/SiW-ECAL/2016-03-07_Status_ILD_SiW_EC… · Vincent.Boudry@in2p3.fr Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 7/28 Analyses

[email protected] Title | Meeting, Place | Date 23/28

Extras

Page 24: Status of the SiW-ECAL prototypepolyboudry/SiW-ECAL/2016-03-07_Status_ILD_SiW_EC… · Vincent.Boudry@in2p3.fr Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 7/28 Analyses

[email protected] Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 24/28

“Final” prototype test (2016+)

Tower of 18×18 cm² (2×2 wafers)14 Short SLABs 1 Long SLAB

2×2.1mm/lay 2×4.2mm/lay

Page 25: Status of the SiW-ECAL prototypepolyboudry/SiW-ECAL/2016-03-07_Status_ILD_SiW_EC… · Vincent.Boudry@in2p3.fr Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 7/28 Analyses

Frotin – CALICE meeting – 17/09/2009

25

The goal:

7.3 – Testing the response of the short SLAB with 4 wafers!

- TB position to be tested- DAC Testing……- and surprises!!!

7-Slab for Test beam 2015

1 Aluminium plate

4 short SLAB

Cover shielding

Windows of 15 mm forW

Cable panel

Led panel position

Page 26: Status of the SiW-ECAL prototypepolyboudry/SiW-ECAL/2016-03-07_Status_ILD_SiW_EC… · Vincent.Boudry@in2p3.fr Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 7/28 Analyses

A word about names

«ILD SiW-ECAL technological prototype»

more of less recently :

– EUDET prototype

– CALICE SiW-ECAL technological prototype

– ILD SiW-ECAL (in conferences)

– SiLC in recent project call in Paris-Saclay

The prototoype is clearly being designed for the ILC, and ILD.

– ≠ from requirements for CLIC-SiW-ECAL, CMS-HGCAL, ATLAS-HGTD, FCC/CEPC

– CALICE is the structure to make this : e.g. recognised for this by CMS (and others)

“A high granularity calorimeter system optimised for the particle flow measurement of multi-jetfinal states at the ILC running, with centre-of-mass energy between 90 GeV and ~1 TeV”

⇒ open it up for other applications ?

Page 27: Status of the SiW-ECAL prototypepolyboudry/SiW-ECAL/2016-03-07_Status_ILD_SiW_EC… · Vincent.Boudry@in2p3.fr Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 7/28 Analyses

[email protected]

Physics program

Physics commissioning:

– Check proper running with high intensity μ’s (X-check of cosmics)

– Thr. adjustment vs noise environment. (Maybe require shielding).

EM-Core Set-up: All slabs after 5 X0 of W → Strong correlation between SLAB’s

– Response at the core of a EM shower:

• Explore the full dynamic range (1–2500 mips) using shower profile (for all mem depth).

– e– runs of all energies, beam rates → linearity

• Check the responses at the wafers edges with ≠ types of wafers (square events)

– Scan in positions

HAD-Core set-up: same as EM-core or with 1λ of W / SS

– Response to HE hadrons: look for SEU

Mini-ECAL set-up: Sampling with 3-4 × 2.5 X0 and 2-3× 5 X0

– Study of theoretical resolution & simulation tuning.

• Scan in energy, position (and angle).

In parasitic mode:test of Babywafers (Kyushu, LLR)

Page 28: Status of the SiW-ECAL prototypepolyboudry/SiW-ECAL/2016-03-07_Status_ILD_SiW_EC… · Vincent.Boudry@in2p3.fr Joint CALICE-HGCal TB | HGC testbeam meeting | 22/07/2015 7/28 Analyses

[email protected]

Chip initialissation pbm