1M. Lewitowicz 12/2/2009
Status of the SPIRAL2 Project
Marek LewitowiczGANIL, France
on behalf of the SPIRAL 2 Project Groupand
Physics Collaborations
Third SPIRAL 2 Week January 25 – 29, 2010http://spiral2ws.ganil.fr/2010/week/registration
M. Lewitowicz 02/12/2009
A/q=6 Injector option
DESIR Facility low energy RIB
HRS+RFQ Cooler
RIB Production CaveUp to 1014 fiss./sec.
A/q=3 HI sourceUp to 1mA
A/q=2 sourcep, d, 3,4He 5mA
LINAC: 33MeV p, 40 MeV d, 14.5 A MeV HI
SP2 Beam time: 44 weeks/yGANIL Beam time: 35 weeks/yISOL RIB Beams: 28-33 weeks/yGANIL+SP 2 Users: 700-800/y
Cost: 200M€
GANIL/SPIRAL1/SPIRAL2 facility
GANIL/SPIRAL 1 today
CIME cyclotron RIB at 1-20 AMeV (up to 9 AMeV for fiss. fragments)
S3 separator-spectrometer
Neutrons For Science
SPIRAL2 is one of the ESFRI list projects (40 most important EU research infrastructure projects)
3M. Lewitowicz 12/2/2009
Today
A
Kr
Yiel
d, p
ps
1nb
1µb
1mb
Fusi
on-e
vap.
, DIC
Cou
lex,
dire
ct re
actio
ns
Hea
vyN
ucle
iEx.: At 1nb 1 nucl./day via fusion-evaporation
SPIRAL 2: Experiments with RIB at low cross sections and very exotic nuclei at few MeV/nucleon
SPIRAL2
EURISOL
SPIRAL 2: Advanced ISOL RIB facility
Exploring isospin degrees of freedom with SPIRAL1 & SPIRAL2 beams
Z=36
N=70N=40
54NiZ=28
N=28
74Kr96Kr
73Ni
N=Z
Examples of post-accelerated RIB with intensity ≥ 105 pps
Z=54121Xe
146Xe
Energy: 1.5 - 9 A MeV for Fission-Fragment RIB
Beam 54Ni 73NiN/Z 0,92 1,61
Max. Energy AMeV 15 9Beam 121Xe 146XeN/Z 1,24 1,70
Max. Energy AMeV 12 8
5M. Lewitowicz 12/2/2009
Fission products (with converter)Fission products (without converter)
High Intensity Light RIB
N=Z Isol+In-flight
SHE
Fusion reaction with n-rich beams
Transfermiums
Deep Inelastic Reactions with RIB/stable beams
Regions of the Chart of Nuclei Accessible with SPIRAL 2 Beams : LINAC & RIB
Production of radioactive beams/targets: (n,⟨), (p,n) etc.
[light-ion stable beams[heavy-ion stable beams[RIB induced reactions
Energy range of SPIRAL2 RIB : ≤ 60keV and 1-20 MeV
+ SPIRAL1 !
6M. Lewitowicz 12/2/2009
SPIRAL 2 timeline
2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
Safetyauthorisations
Constructionof LINAC
RIB
Construction of new detectorsExp. with S3
Stable ion beams from LINAC
Exp. with NFS
Com
mis
-si
onin
gPh
ase
1
Com
mis
-sio
ning
Phas
e 2
Constructionof
buildings
FP7 SPIRAL 2 PPR&D, MoU, 3,9 M€
First LINACBeam
Feb. 2012
First RIB
Oct. 2013Today
CPER Instrumentation SPIRAL2 S3, DESIR, RFQ Cooler 3M€
9M. Lewitowicz 12/2/2009
Civil construction: 2010 - 2012
Phase 1Accelerator & S3, NFS
Construction in 2 PhasesPhase 2
RIB production Building & DESIR
10M. Lewitowicz 12/2/2009
Civil construction Phase 1
If everything goes well ground breaking by Summer 2010
INGEROP Company
üCost estimate at +/-10%
11M. Lewitowicz 12/2/2009
SPIRAL2 Superconducting Linac
IrfuLPSC GrenobleIPHC StrasbourgGanilGSI/FAIR
Irfu LPSC GrenobleIPN Orsay GanilLAL Orsay LPNHE ParisNIPNE Bucarest
IPN Orsay LPSC GrenobleLAL Orsay GanilLPNHE ParisBARC India ? NIPNE Bucarest
GanilIPN Lyon Ciemat SpainIPN Orsay IRNE Bulgaria
12M. Lewitowicz 12/2/2009
Construction of SPIRAL 2
Heavy-Ion injector constructed at Grenoble, first mass separated beam May 20th, 2009
LPSC, IRFUGANIL, IPNL
14M. Lewitowicz 12/2/2009
Choice of the civil construction companyJury meeting on October 2, 2009 : 4 companies will participate in the final round.☞Further cost & design optimisation is necessary in the coming few months
Civil Construction Phase 2
One of the 4 proposals
M. Lewitowicz 02/12/2009
Particle ArrayGamma Array
AGATA
PARISGASPARD FAZIA
EXOGAM 2
ACTAR
NFS
S3DESIR
New detectors to be used at SPIRAL 2
2006 - 2007: 19 Letters of Intent, 600 physicists FP7 SPIRAL2 Preparatory Phase
NEDA
M. Lewitowicz 02/12/2009
FP7 SPIRAL2 Preparatory Phas
25 Partners - 13 Countries - 1 Coordinator
ESFRI process and EU FP7 SPIRAL 2 Preparatory Phase contract (EC grant: 3,9 M€, 2008-2011, 25 partners) aims in the organisation and signature of the International Consortium for the construction of SPIRAL2 and the associated detectors -> future intern. status of GANIL
http://www.spiral2pp.eu > 1M€ for SPIRAL2 detectors
M. Lewitowicz 02/12/2009
SPIRAL 2 timeline
2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
Safetyauthorisations
Constructionof LINAC
RIB
Construction of new detectorsExp. with S3
Stable ion beams from LINAC
Exp. with NFS
Com
mis
-si
onin
gPh
ase
1
Com
mis
-sio
ning
Phas
e 2
Constructionof
buildings
FP7 SPIRAL 2 PPR&D, MoU, 3,9 M€
First LINACBeam
Feb. 2012
First RIB
Oct. 2013Today
CPER Instrumentation SPIRAL2 S3, DESIR, RFQ Cooler 3M€
M. Lewitowicz 02/12/2009
Letter Title Spokesperson(s)LoI_Day1_1 Fast ion-slow ion collisions –FISIC project E. LAMOUR
LoI_Day1_2 Production and spectroscopy of heavy and superheavy elements using S3 and LINAG P. GREENLEES
LoI_Day1_3 In-source resonant laser ion spectroscopy of 94Ag I. G. DARBY
LoI_Day1_4 In-source resonant laser ion spectroscopy of the light Sn isotopes A = 101-107 I. G. DARBY
LoI_Day1_5 In source resonant laser ion spectroscopy of Z >=92 I. G. DARBY
LoI_Day1_6 Single proton states and proton-neutron interaction in 100Sn L. CACERES, F. Azaiez
LoI_Day1_7In-beam gamma spectroscopy of neutron-rich nuclei studied with PARIS at the intermediate focal plane of S3
I. STEFAN, B. Fornal
LoI_Day1_8
Shell structure, Isospin symmetry and shape changes in N=Z nuclei:Coulomb excitation of 104Sn: probing large scale shell model calculationCoulomb excitations of the T=1 bands of the odd-odd 62Ga, 66As and 70Br nuclei
G. DE ANGELIS, B. Wadsworth
LoI_Day1_9Quadrupole Moments of isomeric states using the Tilted-foils Technique at S3
G. GEORGIEV, M. Hass
LoI_Day1_10Precision study of the superallowed beta decay of heavy odd-odd N=Z nuclei
B. BLANK
LoI_Day1_11 100Sn factory – studies of the structure of nuclei in the 100Sn region D. SEWERYNIAK
LoI_Day1_12Fragment angular distributions in neutron-induced fission of actinides
L. TASSAN-GOT, L. Audouin
LoI_Day1_13 Study of the pre-equilibrium process in the (n,xn) reaction X. LEDOUX
LoI_Day1_14Comparison between activation and prompt spectroscopy as means of (n,xn) cross section measurements M. KERVENO
LoI_Day1_15 Fission fragment distributions and neutron multiplicities M. Aïche, D. DORE, F. Rejmund
LoI_Day1_16 Proton and deuteron induced activation reactionsP. BÉM, M. Avrigeanu, U. Fischer, S..P. Simakov
LoI SPIRAL2 Phase 1 Day 1 experiments (Sept. 2009)
M. Lewitowicz 02/12/2009
LINAC beams for the Day 1 SPIRAL2 Phase 1 experiments*)
Based on the recommendations of SPIRAL2 SAC for the LoI
*) The parameters indicated in this table are the first and the best approximations that can be done today.**) Based on the order of magnitude of the expected best currents extracted from a high performance, fully operational, 28 GHz ECR Ion source.***) These dates assume that: installation of equipment in the NFS and S3 areas can start in July 2011.
M. Lewitowicz
üLEA COLLIGA signed in 2007 (first discussions by 2001…)
üMoU signed in April 2009“MOU defines areas and forms of cooperation and joint actions by the two Parties, and is based on the reciprocity principle.”
Annexes to MoU under discussion:
• Neutron converter (technical agreement ready)• RIB production targets• RIB 1+ ion sources• Safety and radioprotection• RFQ cooler• Charge breeder (CB)
§Italian laboratories in the 7FP SPIRAL 2 Preparatory Phase:§ Detector developments: AGATA, FAZIA, NEDA, PARIS?,…
SPES - SPIRAL 2 collaboration
Third SPIRAL 2 Week January 25 – 29, 2010http://spiral2ws.ganil.fr/2010/week/registration
GANIL - SPIRAL2 HIE-ISOLDESPES
EURISOL
2015
2020
2025
ALTO-SPIRAL-ISOLDE-REX-ISOLDE
Discussed possibilities:
•Post acceleration of fission fragments to 150 AMeV•Upgrade of the SPIRAL2 LINAC to ≥100 AMeV
•Any other possibilities?
What about the existing CSSs?
NuPECC Long Range Plan 2010-2020 at GANIL
M. Lewitowicz 02/12/2009
GANIL facility beyond 2015: optionsGANIL/SPIRAL 1 today
Post-acceleration of RIB (fission-fragments) to 150 AMeV
S3
DESIR1
2
3
EURISOL at GANILSPIRAL 2 LINAC as a first part of the EURISOL driver?
•SPIRAL 2 LINAC is high-power machine (5mA)•Possible and cost effective upgrade to H- beam•GANIL/SPIRAL2 operation possible during construction
GANILToday
SPIRAL2
EURISOL
OPTION 3
26M. Lewitowicz 12/2/2009
100Sn20+
72Kr20+
RNB post acceleration - Beam Energies from CIME
Energy range of SPIRAL2 RIB : < 30keV and 1-20 M
Lower Energies
F. Chautard
Beam Energy Intensity
(MeV/u) (pps)132Sn20+ 6.0 2x109132Sn21+ 6.7 2x109132Sn22+ 7.3 1.7x109132Sn23+ 8.0 1.2x108132Sn24+ 8.7 4x108132Sn25+ 9.4 1x108
M. Lewitowicz 02/12/2009
Scientific case of GANIL/SPIRAL 2
Spins&Shapes
Position ofdrip-linep, 2p, αdecay
N=Z
rp-process
Heavy and Super Heavy Elements
r-process path
Haloes & Structures in the Continuum
Equation of State
Role of Isospin
Spins & Shapes
Shell structure very far from stability
Atomic & solid state physiRadiobiology & Isotope pro
ISOSPIN DEGREES OF FREEDOM IN NUCLEAR FORCES
www.ganil.fr/research/developments/spiral2/
Neutrons for scie
and also…
M. Lewitowicz 02/12/2009
International Collaborations
LNL, Legnaro RIKEN, Tokyo
GSI, Darmstadt
HRIBF, Oak Ridge
COPIGAL
FLNR, DubnaISOLDE
NIPNE, Bucharest SARAF
MoU signed
MoU under preparation
ANL, Argonne
BARC,TiFR Bombay
NSCL, MSU
IRNE, Bulgaria
TRIUMF
SPAIN
IMP, Lanzhou
EU FP7 3,9 M€ Preparatory Phase Contract
*LEA = Laboratoire Européen Associé**LIA = Laboratoire International Associé***MoU= Memorandum of Understanding
14 signed (LEA*, LIA**, MoU***) agreements2 agreements under preparation
RIKEN à I day1 given on the web / checked with LISE++à I "nominal" for 1pµA
FAIR à I given on the web SPIRAL2_PA à I at the exit of the production bulding for 5.1013 fissions/sec
à ε1+àN+=6.5% ; εPost_Acc=20% ; EPA=100MeV/uà LISE3 separator à "optimized" : x2 for I_FF (1014 fissions)
x3 for ε1+àN+ (20%) x5 for the separator
SPIRAL2 postaccelerated FF vs. FAIR and Riken (S. Grevy)
Challenges for Nuclear Structure
70
40
Z=40
N=70
110Zr
N=40
68Ni 78Ni56Ni48NiZ=28
78Co77Fe
80Ni 82Ni
N=28
OPTION 2
Post-acceleration of RIB (fission-fragments) to 150 AMeV and secondary fragmentation
M. Lewitowicz 02/12/2009
3 meetings: Giens, June 2008; Caen, March 2009, Paris, August 2009.
SPIRAL2 PP Task 5.9
SPIRAL2 ICC
ICC tasks:• Organisation of the electronics and DAQ Working Group• Organisation of the High-Intensity-RIB Working group• Starting to coordinate synergies between SPIRAL2 detectors• Request to all detector projects to nominate technical liaisons• Request to all detector projects to prepare the financial tables for detector
construction phase• Starting discussions among collaborations for MoU preparations
M. Lewitowicz 02/12/2009
• Call for Letters of Intent for Day 1 SPIRAL2 Phase 1 Experiments (with S3 and NFS) in May 2009
• NFS & S3 Workshops in May/June 2009
• Dead-line July 20th, 2009
• Evaluation of the LoI at the SAC meeting on September 11th, 2009 at Colloque GANIL in Giens
• Evaluation of status reports of all new SPIRAL2 detectors (ACTAR, DESIR, EXOGAM2, FAZIA, NFS, PARIS, S3) at the SAC meeting on September 11th, 2009
Day 1 SPIRAL2 Phase 1 Experiments
34M. Lewitowicz 12/2/2009
RIB production buildingDefinition of beam lines
Beam lines at – 1,75 m
Beam lines at - 8 m
M. Lewitowicz 02/12/2009
T1 T2 T3 T4 T1 T2 T3 T4 T1 T2 T3 T4 T1 T2 T3 T4 T1 T2 T3 T4 T1 T2 T3 T4 T1 T2 T3 T4 T1 T2 T3 T4
Accelerator buildings & associated experimental HallElaboration of programmTenders buildings - Jury meetings February 2008 June 2008Conceptual study of buildings (APS +)Request for Permit of Construction July 2009Enquête PubliquePermit of Construction grantedConstruction of buildingsHand-over of buildings May 2011 July 2011Installation of equipementFirst beams February 201Operation
Production building & associated experimental Hall (DESIR)Elaboration of programmTenders buildings - Jury meetings March 2009 November 2009Conceptual study of buildings (APS +)Request for Permit of Construction November 2010Permit of Construction granted July 2011Construction of buildingsHand-over of the buildings December 2012Installation équipementsTestsOperation
Phase A - Feasibility Phase C/D - Detailled def.; RéalisationPhase B - Prel. Definition Operation
2006 2007 2008 2009 2010 2011 2012 2013
C
Schedule of SPIRAL 2
Public enquiry