1 Savannah River Site Savannah River Site Waste Disposition Project Waste Disposition Project Status of Waste Status of Waste Determination and Tank Determination and Tank Closure Closure March 24, 2009 March 24, 2009 Sherri Ross Sherri Ross Waste Removal and Tank Closure Waste Removal and Tank Closure Program Manager Program Manager Waste Disposition Programs Division Waste Disposition Programs Division Savannah River Operations Office

Upload: others

Post on 20-Jan-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

1

Savannah River SiteSavannah River SiteWaste Disposition ProjectWaste Disposition Project

Status of Waste Status of Waste Determination and Tank Determination and Tank

ClosureClosure

March 24, 2009March 24, 2009

Sherri RossSherri RossWaste Removal and Tank Closure Waste Removal and Tank Closure

Program ManagerProgram ManagerWaste Disposition Programs DivisionWaste Disposition Programs Division

Savannah River Operations Office

2

Purpose & Presentation Overview

Purpose: Describe the status of the SRS Tank Closure Program.

Presentation Overview:– Waste Removal– Closure Process – F Tank Farm Performance Assessment

Comments– Path Forward

3

Tank Closure Program

• Mechanical cleaning with Sand Mantis crawler– Tanks 18 and 19 underway– Challenging but effective– Two back tilt wheel failures– Anticipate ~75% residual heel

removals at completion• Chemical cleaning with oxalic

acid – Tanks 5 and 6 primary

• Remote crawler for annulus cleaning of Tanks 5 and 6

Tank 18 start 1/30/09

Tank 18 on 2/17/09

4

TMR Sand Mantis® Tilt Wheel

Tank 18 Sand Mantis Retaining Screw

Original Design

5

TMR Sand Mantis® Tilt Wheel Improved Design

Tank 18 Sand Mantis Retaining Cover

6

Tank 18 Crawler Footer

7

Tank 19 Tilt Arm Modification

8

Tank 6 Annulus Crawler

9

Regulatory Documentation Path to Closure in the SRS F-Tank Farm

10

F Tank Farm Performance Assessment Comments

• Comments received from– South Carolina Department of Health and Environmental

Control– Environmental Protection Agency– Nuclear Regulatory Commission– Citizen’s Advisory Board Waste Management Committee

• Excellent comments that will improve overall readability and quality of the document– No new modeling anticipated at this time

• Path Forward – revise the F Tank Farm performance Assessment to incorporate comments

11

Path Forward

• Complete mechanical and chemical cleaning of Tanks 19, 18, 5 & 6 by Fall 2009

• Issue Draft F Tank Farm Closure Plan to SCDHEC and EPA by Fall 2009

• Draft FTF WD Basis issued Summer 2010• On schedule to close Tanks 18 and 19 by

Federal Facility Agreement commitment of December 2012