status report

5
Engineering Strategies and Practice Date of Report / Tutorial: April 1 st , 2013 Tut0103______ Report Prepared by* Kasra Modares____________________________ Project #24 Client: Heather Ervin________________________ Project Title: Tarragon Theatre Lobby Improvement Plan_______ Project Manager: Hoi Kwong Lo________________________________ Team Leader: Madhushan Perera________________________________ Team Members: Adam De Biasi (999512273), Christine Nassif (999851334), Enyu Zhou (999087018), Kasra Modares (999507083), Madhushan Perera (999717025), Yida Wang (999485926)____________________ _____________________________________________________________ * This report may be written by one team member (as delegated by the team), but all members of the team take full responsibility for the accuracy of the final version. Activities since the last report, i.e. progress to date: Specific Task Person Assigned Date Due Date Completed 1 Prepare status report Kasra Modares 1/4/2013 31/3/2013 2 Complete first draft of FDS sections 2.7 (Social Impact) & 2.8 (Economics) Kasra Modares 1/4/2013 31/3/2013 3 Complete first draft of FDS Adam De 1/4/2013 31/3/2013 1

Upload: kasramz15938426033

Post on 29-Jan-2016

214 views

Category:

Documents


0 download

DESCRIPTION

report of APS team progress

TRANSCRIPT

Page 1: Status Report

Engineering Strategies and Practice

Date of Report / Tutorial: April 1st, 2013 Tut0103______________________________

Report Prepared by* Kasra Modares___________________________________________

Project #24 Client: Heather Ervin_____________________________________

Project Title: Tarragon Theatre Lobby Improvement Plan___________________________

Project Manager: Hoi Kwong Lo______________________________________________

Team Leader: Madhushan Perera______________________________________________

Team Members:

Adam De Biasi (999512273), Christine Nassif (999851334), Enyu Zhou (999087018),

Kasra Modares (999507083), Madhushan Perera (999717025), Yida Wang (999485926)__

_________________________________________________________________________

* This report may be written by one team member (as delegated by the team), but all members of

the team take full responsibility for the accuracy of the final version.

Activities since the last report, i.e. progress to date:

Specific Task Person Assigned Date Due Date Completed

1 Prepare status report Kasra Modares 1/4/2013 31/3/2013

2 Complete first draft of FDS sections 2.7 (Social Impact) & 2.8 (Economics)

Kasra Modares 1/4/2013 31/3/2013

3 Complete first draft of FDS section 2.1 (Regulations)

Adam De Biasi 1/4/2013 31/3/2013

4 Complete first draft of FDS sections 2.2 (Testing)

Enyu Zhou 1/4/2013 31/3/2013

5 Complete first draft of FDS sections 2.4 (Implementation Requirements) & 3.0 (Project Plan)

Yida Wang 1/4/2013 31/3/2013

1

Page 2: Status Report

Engineering Strategies and Practice

6 Complete first draft of FDS sections 2.4 (Life Cycle) & 2.5 (Human Factors)

Christine Nassif 1/4/2013 31/3/2013

7 Third Client Meeting (Discussed the CDS)

All six group members

29/3/2013 27/3/2013

8 Revised the CDS All six group members

29/3/2013 25/3/2013

9 7 Minute Presentation (Gave a summary of PR and CDS, and talked about the main lesson learned while working on the project)

All six group members

18/3/2013 18/3/2013

10

Problems Encountered:

We could not start working on the Final Design Specifications until we had met with the client,

as the client might not have agreed with our proposed design, which is what really happened in

the client meeting and the client decided to pick two of our alternative designs and asked us to

combine them._____________________________________________________________

_________________________________________________________________________

_________________________________________________________________________

_________________________________________________________________________

_________________________________________________________________________

Lessons Learned & Strategies to address Problems:

We learned that a process type solution like ours might not have many obvious social and

external costs, and that we have to do more research and discuss the matter with our instructors

so as to come up with proper social impacts for our design._________________________

2

Page 3: Status Report

Engineering Strategies and Practice

_________________________________________________________________________

_________________________________________________________________________

_________________________________________________________________________

_________________________________________________________________________

Team Decisions____________________________________________________________

We assigned specific sections of the FDS to each group member, and decided a due date for the

first draft._________________________________________________________________

_________________________________________________________________________

_________________________________________________________________________

_________________________________________________________________________

ADDITIONAL COMMENTS (items to discuss during tutorial: documents, client meetings, up-

coming due dates and activities, etc.):

_________________________________________________________________________

We need to go over the completed first draft of the FDS and begin to revise it. We must also

clarify a few topics such as the external and social costs of our design with the TA.______

_________________________________________________________________________

_________________________________________________________________________

_________________________________________________________________________

_________________________________________________________________________

_________________________________________________________________________

_________________________________________________________________________

_________________________________________________________________________

ATTACH GANTT CHART (one week past, two weeks forward only)

ATTACHED “COMPLETE IN TUTORIAL” SECTION FROM PREVIOUS REPORT

3

Page 4: Status Report

Engineering Strategies and Practice

COMPLETE IN TUTORIAL

This page is to be completed in tutorial and approved by your Project Manager before leaving

tutorial.

PM Initials: _____________________

Plans for the next work period (1-2 weeks)

Task Person Assigned Date Due Comment

1 Prepare Status Report

2

3

4

5

6

7

8

9

10

4