General

• Moving at slower pace till after drupa

• 1 monthly meetings, small subgroups

• Digital Printing

• MIS interaction

Page 3: Status Summary of the O&P Working Group Spa Koen Van de Poel

Change management

• Work in progress

Page 4: Status Summary of the O&P Working Group Spa Koen Van de Poel

ICS Status

• JDF 1.3: LayCrImp 1.3 and MISPRE 1.3

– Published

– Certification

• LayCrImp: OK

• MISPRE: in progress, target Drupa

• JDF 1.4:

– Update samples (needed?) after schema 1.4 (after

drupa)

– Just ‘refresh’ ICS or make changes?

Page 5: Status Summary of the O&P Working Group Spa Koen Van de Poel

JDF 1.4 status

• Done

• Need to review the spec PDF

• Discuss minor updates

• Next steps: samples / ICS

Page 6: Status Summary of the O&P Working Group Spa Koen Van de Poel

Potential Interactions

• DigitalPrinting

• Finishing

• LayoutCreation

Page 7: Status Summary of the O&P Working Group Spa Koen Van de Poel

Open Action/Work Items at Risk

• Change management still not well defined

Page 8: Status Summary of the O&P Working Group Spa Koen Van de Poel

Summary

• 1.3 ICS done, moving to certification

– Stripping Application note

• 1.4 spec work finished

– Samples and ICS next steps