Status Summary of theO&P Working Group Spa
Koen Van de Poel
General
• Moving at slower pace till after drupa
• 1 monthly meetings, small subgroups
• Digital Printing
• MIS interaction
Change management
• Work in progress
ICS Status
• JDF 1.3: LayCrImp 1.3 and MISPRE 1.3
– Published
– Certification
• LayCrImp: OK
• MISPRE: in progress, target Drupa
• JDF 1.4:
– Update samples (needed?) after schema 1.4 (after
drupa)
– Just ‘refresh’ ICS or make changes?
JDF 1.4 status
• Done
• Need to review the spec PDF
• Discuss minor updates
• Next steps: samples / ICS
Potential Interactions
• DigitalPrinting
• Finishing
• LayoutCreation
Open Action/Work Items at Risk
• Change management still not well defined
Summary
• 1.3 ICS done, moving to certification
– Stripping Application note
• 1.4 spec work finished
– Samples and ICS next steps