Steel Erection - OSHA’s First Negotiated Rule

Upload: buithu

Post on 18-Dec-2016

222 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Steel Erection - OSHA's First Negotiated Rule Subpart R

Steel Erection - OSHA’s First Negotiated Rule

Page 2: Steel Erection - OSHA's First Negotiated Rule Subpart R

Subpart R - Steel Erection• Issued January 18, 2001• Long overdue updating of the existing standard• Addresses hazards associated with: double

connections, column stability, falls, hoisting & rigging, joist installation, engineered metal buildings, decking, multiple lifts, structural stability…

• Effective Date: January 18, 2002…• + Phase-in of “Component” requirements, e.g.,

bolt holes for joist connections, etc. (permit obtained before, 1/18/01) or steel erection began before 9/16/01

Page 3: Steel Erection - OSHA's First Negotiated Rule Subpart R

Layout of Subpart R• .750 - Scope• .751 - Definitions• .752 - Site Layout,

Site-specific Erection Plan & Construction Sequencing

• .753 - Hoisting & Rigging

• .754 - Structural Steel Assembly

• .755 - Column Anchorage

• .756 - Beams & Columns

• .757 - Open Web Steel Joists

• .758 - Systems-engineered Metal Buildings

• .759 - Falling Object Protection

• .760 - Fall Protection• .761 - Training• Appendices A - H

Page 4: Steel Erection - OSHA's First Negotiated Rule Subpart R

Scope of Subpart R

• Subpart R applies to steel erection activities such as, connecting, bolting, plumbing & guying, joist installation, decking, and related work (e.g., hoisting & rigging) that occurs in tiered and non-tiered buildings, bridges, stadiums, and special structures BUT NOT communication and broadcast towers or tanks (e.g., water or fuel tanks)

Page 5: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 6: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 7: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 8: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 9: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 10: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 11: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 12: Steel Erection - OSHA's First Negotiated Rule Subpart R

1926.751 - Definitions• Connector - means an employee who, working

with hoisting equipment, is placing &• connecting structural members • and/or components.

• Hoisting Equipment means a • crane or a derrick NOT a come-along!

Page 13: Steel Erection - OSHA's First Negotiated Rule Subpart R

A “come-a-long”• Mechanical device

usually consisting of a chain or cable attached at each end, that is used to facilitate movement of materials through leverage.

• This is not considered “hoisting equipment.”

Page 14: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 15: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 16: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 17: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 18: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 19: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 20: Steel Erection - OSHA's First Negotiated Rule Subpart R

“Topping Out”

Page 21: Steel Erection - OSHA's First Negotiated Rule Subpart R

Derrick floor: An elevated floor of a building or structure that has been designated to receive hoisted pieces of steel prior to final placement

Page 22: Steel Erection - OSHA's First Negotiated Rule Subpart R

Opening• A gap or void 12

inches or more in its least dimension in a floor, roof or other walking/working surface.

• Skylights and smoke domes shall be regarded as openings.

Page 23: Steel Erection - OSHA's First Negotiated Rule Subpart R

Project structural engineer of record

• Registered, licensed professional engineer responsible for the design of structural steel framing and whose seal appears on the structural contract documents.

Page 24: Steel Erection - OSHA's First Negotiated Rule Subpart R

Shear connector• Steel bars, steel

lugs, headed steel studs, and similar devices which are attached to a structural member for the purpose of achieving composite action with concrete.

Page 25: Steel Erection - OSHA's First Negotiated Rule Subpart R

Steel joist• An open web,

secondary load-carrying member of 144 feet or less, designed by the manufacturer, used for the support of floors and roofs.

• This does not include structural steel trusses or cold-formed joists.

Page 26: Steel Erection - OSHA's First Negotiated Rule Subpart R

Steel joist girder• An open web,

primary load-carrying member, designed by a manufacturer, used for the support of floors and roofs.

Page 27: Steel Erection - OSHA's First Negotiated Rule Subpart R

Systems-engineered metal building

• Field-assembled building system consisting of framing, roof and wall coverings.

Page 28: Steel Erection - OSHA's First Negotiated Rule Subpart R

1926.752 1926.752 Site layout, site-specific Site layout, site-specific erection plan and erection plan and construction sequenceconstruction sequence

Page 29: Steel Erection - OSHA's First Negotiated Rule Subpart R

(a) Approval to begin steel erection

• ASTM standard test method (concrete must be 75% of the minimum compressive design strength): footings, piers, walls

• Repairs, replacements and modifications to anchor bolts made in accordance with 1926.755(b)

• (b) Commencement of Steel Erection– Steel Erector shall not erect steel unless it

has received written notification of the requirements of (a) have been met

Page 30: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 31: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 32: Steel Erection - OSHA's First Negotiated Rule Subpart R

(c) Site layout (controlling contractor shall provide):

• Adequate access• A firm, properly graded, drained

area, readily accessible for the safe storage of materials and the safe operation of equipment

Page 33: Steel Erection - OSHA's First Negotiated Rule Subpart R

Adequate space for storage of materials

Page 34: Steel Erection - OSHA's First Negotiated Rule Subpart R

1926.753 - Hoisting & Rigging

• Crane inspections as per ANSI B30.5-1994

• Qualified operator is in charge of lifts and has final call

• Qualified rigger• OK to use man baskets (1926.550(g)(2)

does not apply, rest of .550 does apply)• Preplan routes to minimize employee

exposure to suspended loads• Multiple lift rigging procedures….

Page 35: Steel Erection - OSHA's First Negotiated Rule Subpart R

Critical lift

• A lift that (1) exceeds 75 percent of the rated capacity of the crane or derrick, or (2) requires the use of more than one crane or derrick.

Page 36: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 37: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 38: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 39: Steel Erection - OSHA's First Negotiated Rule Subpart R

Can You Christmas Tree Steel?

Page 40: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 41: Steel Erection - OSHA's First Negotiated Rule Subpart R

Multiple lift rigging

Page 42: Steel Erection - OSHA's First Negotiated Rule Subpart R

(1) Multiple lift shall only be performed if the following are met:multiple lift rigging assembly is used;maximum members is hoisted of five

per lift;only structural members are lifted;

andemployees engaged in the lift have

been trained in the procedures in 1926.761 (c)(1)

Construction Safety Council

Page 43: Steel Erection - OSHA's First Negotiated Rule Subpart R

(4)The multiple lift rigging assembly shall be rigged with the members:

rigged at least 7 feet apartrigged from the top down

attached at their center of gravity and maintained level

Construction Safety Council

Page 44: Steel Erection - OSHA's First Negotiated Rule Subpart R

(2) Components of the multiple lift rigging assembly shall be specifically designed and assembled with a maximum capacity for total assembly and for each individual attachment point.

Capacity must be certified by the manufacturer or a qualified rigger and have a 5 to 1 safety factor

Construction Safety Council

Page 45: Steel Erection - OSHA's First Negotiated Rule Subpart R

1926.753(e)(3) The total load shall not

exceed:• The rated capacity of the

hoisting equipment• The rigging capacity

(4) The multiple lift rigging assembly shall be rigged with the members:– attached at their

center of gravity and maintained level;

– rigged from the top down; and

– rigged at least 7 feet apart

(5) The members on the multiple lift rigging assembly shall be set from the bottom up.

(6) Controlled load lowering shall be used whenever the load is over the connectors.

Page 46: Steel Erection - OSHA's First Negotiated Rule Subpart R

A

B

C

D

E (shackle)F (hook)

H (shackle)

I (hook)

G

Typical Multiple Lift Rigging Assembly

What do you need to know?•How much does each piece weigh?

•What size slings?

•What size and type of hooks?

•What size of shackles?

Page 47: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 48: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 49: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 50: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 51: Steel Erection - OSHA's First Negotiated Rule Subpart R

Another variation of a manufactured multiple lift rigging assembly

Page 52: Steel Erection - OSHA's First Negotiated Rule Subpart R

1926.754 - Structural Steel Assembly

Page 53: Steel Erection - OSHA's First Negotiated Rule Subpart R

1926.754(a) - Structural stability SHALL be maintained at ALL times during the erection process!

Page 54: Steel Erection - OSHA's First Negotiated Rule Subpart R

1926.754 Structural Steel Assembly

• (b)(3) - maintain fully planked or decked floor or net 2 stories or 30 ft. below any erection work

• (c) Walking/working surfaces - trip hazards and slip resistance (SR effective 7/18/06)

• (d) Plumbing-up - as per competent person

• (e) Metal decking - (2)(iii) - metal decking holes/openings SHALL not be cut until immediately prior to being filled/used

Page 55: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 56: Steel Erection - OSHA's First Negotiated Rule Subpart R

Plumbing Up!

Page 57: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 58: Steel Erection - OSHA's First Negotiated Rule Subpart R

Metal decking• Commercially

manufactured, structural grade, cold rolled metal panel formed into a series of parallel ribs; this includes metal floor, and roof decks, standing seam metal roofs, other metal roof systems and other products such as bar gratings, checker plate, expanded metal panels.

Page 59: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 60: Steel Erection - OSHA's First Negotiated Rule Subpart R

Decking hole• A gap or void more

than 2 inches in its least dimension and less than 12 inches in its greatest dimension in a floor, roof or other walking/working surface.

Page 61: Steel Erection - OSHA's First Negotiated Rule Subpart R

Framed metal deck openings

• Must be turned down to allow continuous deck installation except where not allowed by structural design.

Page 62: Steel Erection - OSHA's First Negotiated Rule Subpart R

•Skylights and smoke domes shall be regarded as openings.

Page 63: Steel Erection - OSHA's First Negotiated Rule Subpart R

1926.755 - Column Anchorage• (a) General

requirements for erection stability– Columns anchored

by a min. of 4 rods (bolts)

– Each anchor rod, assembly including base plate and foundation, designed to resist a 300# eccentric load at 18” from the column face

Page 64: Steel Erection - OSHA's First Negotiated Rule Subpart R

1926.755 - Column Anchorage• (a) (continued)

– Columns set on level finished floors, pre-grouted leveling plates, leveling nuts, or shim packs

– All columns shall be evaluated by a competent person to determine whether guying or bracing is needed

Page 65: Steel Erection - OSHA's First Negotiated Rule Subpart R

(1) Need approval of the project structural engineer.(2) Prior to column erection, the controlling contractor shall provide written notification to the steel erector if there has been any repair, etc., to the anchor rods (bolts).

(b) Repair, Replacement Or Field Modification

Construction Safety Council

Page 66: Steel Erection - OSHA's First Negotiated Rule Subpart R

Field modification of anchor rods

Page 67: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 68: Steel Erection - OSHA's First Negotiated Rule Subpart R

Shim Packs

How many can you use?

Page 69: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 70: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 71: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 72: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 73: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 74: Steel Erection - OSHA's First Negotiated Rule Subpart R

Prevent Steel Collapse!

• 4 bolts minimum per column! [.755(a)]

• Repair, replacement or field modification of anchor bolts must be approved by the structural engineer of record! [.755(b)]

New bolt not made!= 2 anchor bolts

New bolt not tested!

Page 75: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 76: Steel Erection - OSHA's First Negotiated Rule Subpart R

(a)General. Secured with at least two bolts per connection. Competent person to evaluate.(b)Diagonal bracing. With bracing, secured by at least one bolt per connection.(c)Double connections at columns and/or at beam webs over a column. At least one bolt or similar connection device is present.

Construction Safety Council

1926.756 - Beams & Columns

Page 77: Steel Erection - OSHA's First Negotiated Rule Subpart R

Two bolts per connection

Page 78: Steel Erection - OSHA's First Negotiated Rule Subpart R

Double connection• Attachment

method where the connection point is intended for two pieces of steel which share common bolts on either side of a central piece.

Page 79: Steel Erection - OSHA's First Negotiated Rule Subpart R

In order to make the “double connection”:

• the connector has to back out the bolts

• hold the beam in place with a spud wrench (fig. 1)

• When second beam arrives, align and hold it with a spud wrench

• push bolts back through first beam into second beam and secure in place.

(old way – no beam seat, flanged or clipped connection used)

Page 80: Steel Erection - OSHA's First Negotiated Rule Subpart R

1926.756 - Beams & Columns - (c) Double connections at columns and/or at beam webs over a column: At least one bolt or similar connection device must be present (e.g., a beam seat, etc.)

Staggered connection

Clipped connection

Page 81: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 82: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 83: Steel Erection - OSHA's First Negotiated Rule Subpart R

Double connection seat

• Structural attachment that, during the installation of a double connection, supports the first member while the second member is connected.

Page 84: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 85: Steel Erection - OSHA's First Negotiated Rule Subpart R

(d)Column splices. Designed to resist a 300# eccentric load located at 18” from column face.(e)Perimeter columns. Must extend a min. of 48” above the finished floor for safety cables. Holes or other attachment device attached to perimeter columns

Construction Safety Council

Page 86: Steel Erection - OSHA's First Negotiated Rule Subpart R

Column splice

Page 87: Steel Erection - OSHA's First Negotiated Rule Subpart R

Vertical stabilizer plate

Page 88: Steel Erection - OSHA's First Negotiated Rule Subpart R

Post

Page 89: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 90: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 91: Steel Erection - OSHA's First Negotiated Rule Subpart R

Diagonal bracing • Solid web structural

members used as diagonal bracing must be secured by at least one bolt per connection drawn up wrench tight or the equivalent as specified by the project structural engineer of record.

Page 92: Steel Erection - OSHA's First Negotiated Rule Subpart R

1926.757 - Open Web Steel Joists

• Addresses proper joist end attachment, erection procedures– erection bridging requirements according to

Tables A & B (similar to SJI Tables)– Holes in joists/bolting required for joists in

40’+ bays• Requirements for landing and placing loads on

joists• Some requirements may be modified through a

site-specific erection plan (tandem setting of some 60’+ joists and requirements for landing decking bundles)

Page 93: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 94: Steel Erection - OSHA's First Negotiated Rule Subpart R

Anchored bridging

• Steel joist bridging is connected to a bridging terminus point.

Page 95: Steel Erection - OSHA's First Negotiated Rule Subpart R

Bolted diagonal bridging

• Diagonal bridging that is bolted to a steel joist or joists.

Page 96: Steel Erection - OSHA's First Negotiated Rule Subpart R

Bridging clip• A device that is

attached to the steel joist to allow the bolting of the bridging to the steel joist.

Page 97: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 98: Steel Erection - OSHA's First Negotiated Rule Subpart R

Bridging terminus point • Means a wall,

beam,tandem joists (with all bridging installed and horizontal truss in the plane of the top cord) or other element at an end or intermediate point of a line of bridging that provides an anchor point for the steel joist bridging.

• (Bridging is secured to the wall or beam)

Page 99: Steel Erection - OSHA's First Negotiated Rule Subpart R

An employee was assigned to connect the X-braces at the end of 40-foot long bar joists. Only one end of the bar joist he was working on had been welded. The employee was sitting on the unwelded end of the bar joist trying to connect the X-braces. He lost his balance, dislodging the bar joist from its end support, and fell approximately 24 feet to his death.

Steel Erection Operation

Page 100: Steel Erection - OSHA's First Negotiated Rule Subpart R

Five iron workers were distributing 90-foot-long open web bar joists on a building under construction. The bar joists were supported by vertical columns spaced 30 feet apart. The steel columns were not framed in at least two directions and the bar joists were not field bolted to the vertical columns to prevent collapse. The bar joists shifted, causing the vertical columns to lean. This caused entire section of columns and pen web bar joists to collapse. Two employees rode the iron down. One was fatally injured and one received serious injuries.

Steel Erection Operation

Page 101: Steel Erection - OSHA's First Negotiated Rule Subpart R

1926.757 - Open Web Steel Joists

• When columns not framed in 2 directions by beams, Steel joists shall be field-bolted at the column

• Hoist cables not released until joists are field-bolted and the bottom chord is restrained by stabilizer plate

Page 102: Steel Erection - OSHA's First Negotiated Rule Subpart R

1926.757 - Open Web Steel Joists

• (b) Attachment of steel joists and steel girders: “K”, “LH” & “DLH” series joists to be attached by specific welds or equivalent bolts– except for panels, each

joist shall be attached to the support structure at least on one end of both sides of the seat immediately upon placement

Page 103: Steel Erection - OSHA's First Negotiated Rule Subpart R

1926.757 - Open Web Steel Joists

• (c) Erection of steel joists: as per incorporated SJI tables

• (d) Erection bridging

• (e) Landing & placing loads

Page 104: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 105: Steel Erection - OSHA's First Negotiated Rule Subpart R

Bolted joists

Page 106: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 107: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 108: Steel Erection - OSHA's First Negotiated Rule Subpart R

Construction load

Page 109: Steel Erection - OSHA's First Negotiated Rule Subpart R

1926.758 - Systems-Engineered Metal Buildings

• Specific requirements for metal buildings (e.g., Butler buildings, etc.) including:– 4 anchor rods/column– rigid frames to have 50% of bolts or mfg spec.– girt connections– joists and purlins

Page 110: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 111: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 112: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 113: Steel Erection - OSHA's First Negotiated Rule Subpart R

System-Engineered Metal Buildings

• Rigid frames will have 50 percent of their bolts or the number of bolts specified by the manufacturer (which ever is greater) installed and tightened before the hoisting equipment is released.

Page 114: Steel Erection - OSHA's First Negotiated Rule Subpart R

System-Engineered Metal Buildings

• Minimum of four (4) anchor rods (anchor bolts) per structural columns

Page 115: Steel Erection - OSHA's First Negotiated Rule Subpart R

Girt• Is the “Z” or “C”

shaped member formed from sheet steel spanning between primary framing and supporting wall materials.

• (Engineered metal buildings)

Page 116: Steel Erection - OSHA's First Negotiated Rule Subpart R

“Z” shaped girt

Page 117: Steel Erection - OSHA's First Negotiated Rule Subpart R

Purlin• In systems-

engineered metal buildings, a “Z” or “C” shaped member formed from sheet steel spanning between primary framing and supporting roof material.

Page 118: Steel Erection - OSHA's First Negotiated Rule Subpart R

Girt and eave strut - to – frame connections

Page 119: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 120: Steel Erection - OSHA's First Negotiated Rule Subpart R

§1926.759 Falling Object Protection (does not apply to materials being

hoisted)

• Secure loose items aloft• Controlling contractor to bar

operations below steel erection unless falling object protection provided (from objects other than hoisted materials)

Page 121: Steel Erection - OSHA's First Negotiated Rule Subpart R

Falling Object Protection

• Secure all loose items aloft

Page 122: Steel Erection - OSHA's First Negotiated Rule Subpart R

§1926.760 Fall Protection• All must be protected at heights greater than 2

stories or 30 feet, including connectors and deckers

• Between 15 and 30 feet: Fall protection required for all with exceptions for:

– Deckers in controlled decking zone (CDZ) and

– Connectors• Connectors must be provided and wear equipment

necessary to be able to be tied-off, or be provided with other means of fall protection

Page 123: Steel Erection - OSHA's First Negotiated Rule Subpart R

Personal fall arrest system

• Means a system used to arrest an employee in a fall from a working level.

• System consists of an anchorage, connectors, a body harness and may include a lanyard, deceleration device, lifeline or suitable combination of these.

Page 124: Steel Erection - OSHA's First Negotiated Rule Subpart R

Positioning device• Means a body belt or body

harness rigged to allow an employee to be supported on an elevated, vertical surface, such as a wall or column and work with both hands free while leaning.

Fall Restraint…?

= NO ( I mean ZERO!) Free Fall

Page 125: Steel Erection - OSHA's First Negotiated Rule Subpart R

1926.760 - Fall protection

1926.760(d)(1)- Fall Protection systems shall meet the requirements of 1926.502!

Page 126: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 127: Steel Erection - OSHA's First Negotiated Rule Subpart R

Safety Nets

Page 128: Steel Erection - OSHA's First Negotiated Rule Subpart R

Connecting

Page 129: Steel Erection - OSHA's First Negotiated Rule Subpart R

Beamer

Page 130: Steel Erection - OSHA's First Negotiated Rule Subpart R

BEAMER IN USEBEAMER IN USE

Page 131: Steel Erection - OSHA's First Negotiated Rule Subpart R

Beamer, Glyder, Girder Grip

Page 132: Steel Erection - OSHA's First Negotiated Rule Subpart R

RETRACTABLE LANYARDSRETRACTABLE LANYARDS

Page 133: Steel Erection - OSHA's First Negotiated Rule Subpart R

Roof Eye

Page 134: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 135: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 136: Steel Erection - OSHA's First Negotiated Rule Subpart R

Working Fast - Safely

Page 137: Steel Erection - OSHA's First Negotiated Rule Subpart R

2 Lanyards Minimum for 100% FP

Page 138: Steel Erection - OSHA's First Negotiated Rule Subpart R

Uni Strut in Use

Page 139: Steel Erection - OSHA's First Negotiated Rule Subpart R

Scissors lifts and Man baskets

Page 140: Steel Erection - OSHA's First Negotiated Rule Subpart R

Horizontal LifelinesHorizontal Lifelines

Page 141: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 142: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 143: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 144: Steel Erection - OSHA's First Negotiated Rule Subpart R
Page 145: Steel Erection - OSHA's First Negotiated Rule Subpart R

§1926.760 Fall Protection (cont.)

• Controlled decking zone:– For leading edge decking work

• limited access • designated boundaries by control

lines• Work practices for attaching deck:

– install safety attachments from leading edge back

–no final attachments allowed in CDZ–up to 3000 SF of unsecured decking

• specific training requirements

Page 146: Steel Erection - OSHA's First Negotiated Rule Subpart R

Controlled Deck Zone (CDZ)

?

Page 147: Steel Erection - OSHA's First Negotiated Rule Subpart R

Safety deck attachment• An initial attachment

that is used to secure an initially placed sheet of decking to keep proper alignment and bearing with structural support members.

Page 148: Steel Erection - OSHA's First Negotiated Rule Subpart R

Warning Line System

CDZs

Controlled Decking Zones

Page 149: Steel Erection - OSHA's First Negotiated Rule Subpart R

§1926.760 Fall Protection (cont.)• Perimeter cables required

– Must be installed “as soon as the metal decking has been installed”

• Custody of Fall Protection Equipment:– Controlling contractor must choose to

either:• accept responsibility for maintaining fall

protection equipment left by erector,• OR ensure that it is removed (.760(e))

Page 150: Steel Erection - OSHA's First Negotiated Rule Subpart R

Column attachments for safety cable:

Page 151: Steel Erection - OSHA's First Negotiated Rule Subpart R

1926.761 - 1926.761 - TrainingTraining

Page 152: Steel Erection - OSHA's First Negotiated Rule Subpart R

§1926.761 Training• Qualified person to train workers

in use & operation of fall protection equipment

• Qualified person to train workers engaged in specific activities:– “christmas-treeing”– connecting – CDZ procedures

Page 153: Steel Erection - OSHA's First Negotiated Rule Subpart R