    Steel lattice towers

    for 10, 20 and 35 kV transmission lines

    INSTRUCTIONS FOR DEPLOYMENT OF TOWERS

    PROJEKT

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    2/44

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    3/44

    STEEL LATTICE TOWERS FOR 10, 20 AND 35 kV TRANSMISSION LINES

    1

    1. INTRODUCTION 3

    2. BASIC INFORMATION ON PURPOSE AND STRUCTURE OF TOWERS 3

    3. CONDUCTOR ARRANGEMENT ON THE TOWER 5

    3.1. TOWER HEAD TYPES 5

    3.2. OPTIONS FOR MODELLING TOWER HEADS 7

    4. TOWER TYPES AND STRENGTH CAPACITY 8

    4.1. TOWER TYPES 8

    4.2. TABLE WITH DRAFTS AND DATA ON ADMISSIBLE TOWER LOADS 9

    NAH2 10

    NAL2 11

    NAP2 12

    ZAE2 13ZAH2 14

    ZAJ2 15

    ZAL2 16

    ZAM2 17

    4.3. EXAMPLE OF SELECTING AND MONITORING TOWERS

    FOR CERTAIN LOAD CONDITIONS 18

    5. RECOMMENDED SELECTION OF TOWERS (APPLICATION TABLES) 21

    5.1. MOST COMMON STRUCTURE AND CROSS SECTIONSFOR NON INSULATED CONDUCTORS IN DIFFERENT CLIMATE CONDITIONS 21

    5.2. CONDUCTOR SUSPENSION SETS 23

    5.3. CONDUCTOR TENSION SETS 32

    6. ORDERING INFORMATION AND STRUCTURE TAKEOVER 34

    7. ASSEMBLING THE STRUCTURE 36

    8. TOWER FOUNDATION 38

    TABLE OF CONTENTS

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    4/44

    DALEKOVOD - PROJEKT

    2

    In order to comprise all requirements of distributors, and at the same time use the simplest possible storage solutions

    and to reduce maintenance costs i.e. to unify the construction, a suitable group of steel lattice towers was designed for

    assembling 20 (10 and 35) kV distribution lines. Towers were designed between 1980 and 1983 for the requirements of

    the Elektroprivreda company, as part of the medium voltage tower standardisation program for ZEOH at that time, and

    are now part of the DALEKOVOD d.d. Zagreb manufacturing assortment.

    By using extensive experience in design, production and construction of transmission line towers and data on their use,3 suspension (N NAH, NAL and NAP) and 5 tension (Z ZAE, ZAH, ZAJ, ZAL and ZAM) towers were designed, in line

    with the Regulation on Technical Standards for Construction of Overhead Power Lines of Nominal Voltage Between 1

    and 400 kV Offi cial Gazette 65/88 (O.G.RH 55/96), where each of them can be used in different conditions present on

    the transmission line route.

    For each tower type a structure prototype was made and it was tested under test load. Based on the examination of the

    project documentation (calculations and manufacturing blueprints), examination of the prototype structure, testing

    results and by participation in tests, IGH as the authorised organisation issued attests on testing.

    Over 25 years of experience in using towers indicated all structural advantages, precisely because of the possibilityof their differentiated use, their suitability to most common situations and deployment requirements. Accordingly,

    new types of accessorises and new manufacturing technology improvements were made to: the structure itself,

    presentation of acceptable loads and methods for control and selection of the structure model for the relevant load of

    each single tower design type group. To the names of towers the additional mark 2 was added, (N NAH2, NAL2 and

    NAP2) and (Z ZAE2, ZAH2, ZAJ2, ZAL2 and ZAM2).

    For each single tower type a project documentation was prepared according to the currently valid technical regulations

    and professional HEP standards (Steel Lattice Tower Standardisation for 20(10) kV Network, mark N.022.03, class no.

    4.08/92).

    These instructions are intended for designers, builders and contractors of medium voltage transmission

    lines, as also to employees in charge of their maintenance, and are to insure quick and simple reference in

    selecting and deploying structures, i.e. in reaching the optimum solution.

    1. INTRODUCTION

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    5/44

    STEEL LATTICE TOWERS FOR 10, 20 AND 35 kV TRANSMISSION LINES

    3

    2. 1. THE PURPOSE OF THE STRUCTUREWith difference from towers designed for very specific cross sections and structures of conductors, these towers

    represent typified structure solutions where each type can be used in different geographical conditions for more

    different types of conductors, with different cross sections and structures.

    For the required conductor cross-section and specific locations, by correct selection of the maximum working stressand corresponding arrangement of suspensions, i.e. points of connecting the earth wire to the structure, each tower

    can be used:in all climate conditions:

    nominal wind load 500 1100 (1300) N/m2

    additional load coeffi cient 1 to 4 x 0.18.d daN/m

    on all terrains, without regard of the configuration

    for earth wires with different cross-sections:

    AL/ between 35/6 mm2 and 150/25 mm2

    other types of insulated and non insulated conductors, that put weight on the tower

    with the corresponding resulting tension force and wind facing surface

    for connecting post type, long rod, string insulators (directly to the cross-arm, over hinges, shackles, extension

    links and spacers)

    for one, and for two systems

    with, or without earth wire

    for use of additional equipment without requiring customisation of the structure:

    overhead and underground cable tap-offs, overhead-underground transition

    line disconnectors (with or without remote control), malfunction detection, etc.

    as gantries

    2. BASIC INFORMATION ON PURPOSE AND

    STRUCTURE OF TOWERS

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    6/44

    DALEKOVOD - PROJEKT

    4

    2. 2. BASIC STRUCTURE INFORMATION

    Towers are four sided pyramids of steel - lattice grid. Made of standard hot rolled profiles connected with bolts, with

    single diagonal filling in the total length of the tower. Two sides of suspension towers that are designed for light and

    medium loads shall be made of horizontal steel plate welded to tower main legs instead of diagonals fixed with bolts.

    Corrosion protection of all tower parts is made by hot dip galvanizing, in quality that satisfies renown world standards.

    All towers are designed with parallel sides of the upper section (tower head without incremental adjustments). In this

    way it is possible to use same cross-arms for different disposition of earth wires numerous different symmetrical and

    asymmetrical heads, and makes possible to connect same accessories on different tower heights as also on different

    types of towers.

    Tower sections with incremental adjustment are selected on purpose to use one or at most two different profile

    dimensions for tower main legs at all heights. Each tower section diagonal has the same length, profile dimension and

    corresponding bolts.

    Type, material, dimensions and manufacturing of tower structures enable:

    simple storage and transport (for different dimensions and transportation means)

    quick installation and removal (by elements, sections, as a whole) with or without mechanisation

    changing the function of a tower on the already constructed transmission lines

    simple maintenance and interventions during exploitation:

    open profiles suitable for monitoring and maintenance simple replacement of damaged elements and reparation of corrosion protection

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    7/44

    STEEL LATTICE TOWERS FOR 10, 20 AND 35 kV TRANSMISSION LINES

    5

    3. 1. TOWER HEAD TYPES

    On towers it is possible to have virtually any arrangement of conductors i.e. any tower head type.

    Types used for non insulated conductors are:

    Symmetrical heads formed by two sided cross-arms G gama

    D delta

    T trapez [trapezium]

    B, BU bava [barrel] (B without, and BU with the earth wire)

    Asymmetrical heads formed by one sided cross-arms

    J, JU jela [fir] (J without, and JU with the earth wire)

    Cross-arms are mounted on the upper section of the tower with the possibility of connection on every 0.85 m of the

    section, where necessary. For the central conductor of the head D and for the earth wire on heads BU and JU, the top

    frame structure is mounted at the top of the tower, hereinafter named only as top.

    Besides cross-arms for types of tower heads, it is also possible to attach on towers suspension equipment and structures

    (frames, cross-arms, etc.) customised for suspending insulated conductors, cables, devices, etc.

    3. CONDUCTOR ARRANGEMENT

    ON THE TOWER

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    8/44

    DALEKOVOD - PROJEKT

    6

    TOWER HEAD TYPESSYMMETRICAL HEADS

    G - GAMA

    D - DELTA

    B, BU - BAVA [BARREL] T - TRAPEZ [TRAPEZIUM]

    ASYMMETRICALHEADS

    J, JU - JELA [FIR]

    HEAD CONSTRUCTION

    CROSS-ARM LENGTH a, b, c = 0.95 1.20. 1.45. 1.60 (1.80)mSPACING BETWEEN CROSS-ARMS x, y, z = nx0.85mHEAD HEIGHT s=x+y+zUSEFUL TOWER HEIGHT h=H-SDESIGNATION OF THE HEAD SHAPEG, D, B, T, J = towers without earth wire x = 0BU, JU = towers with earth wire x = n x 0.85

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    9/44

    STEEL LATTICE TOWERS FOR 10, 20 AND 35 kV TRANSMISSION LINES

    7

    3. 2. OPTIONS FOR MODELLING TOWER HEADS

    SYMMETRICALHEAD CROSS-ARMS

    ASYMMETRICALHEAD CROSS-ARMS

    TOP

    DOUBLE SIDED CONSOL ONE SIDED CONSOL

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    10/44

    DALEKOVOD - PROJEKT

    8

    4. 1. TOWER TYPES

    Basic purpose:

    suspension line towers in the transmission line route: NAH2, NAL2, NAP2

    tension: ZAE2, ZAH2, ZAJ2, ZAL2, ZAM2

    The order of towers corresponds to the tower weight order and their implementation from lighter conditions towards

    the heavier load on the transmission line route.

    Tension towers for transmission lines, besides their main purpose to decrease the load, angle-tension, end-tower and

    towers with tap-offs, can also be used as suspension ones (in case larger medium spans and/or higher towers are

    required).

    Nominal height: 9 m, 11 m, 13 m, 15 m all towers (tower NAH2 up to 13 m for standard use)

    17 m, 19 m and 21 m additional height for tension towers

    Nominal heights are specific for all tower types, and they should be used when placing orders. The actual height from

    bottom to top, according to the manufacturing documentation is equal to nominal height with tolerance between -

    0.5 m and + 0.25 m, depending on the tower type and height. It is indicated on the sketch of each tower, above the

    nominal height indicated in brackets. Tower height from the connection point on the tower top to the ground is equal

    to the real height of the structure, according to the sketch of the tower + height of the foundation. Overall standard

    increase of height from the foundations amounts to 30 cm and can be increased for certain tower locations if necessary.

    To reduce the costs of solving property issues when constructing transmission lines, additional tower heights were

    designed. They make possible to use towers with longer spans and to reduce the number of towers in the transmission

    line route.

    TOWER STRENGTH CAPACITY - NOMINAL TOWER LOAD

    The strength capacity of each single tower is conditioned by the basic implementation i.e. load conditions for which

    the tower is designed for, and are defined by the nominal load and allowed torque with the resulting sum of horizontal

    forces. Nominal load corresponds to the maximum force on the top of the tower, that tower main legs can support for

    certain load according to the mentioned Regulation for Overhead Power-lines. Values stated for loads caused by wind

    relate to payload.

    The strength capacity of each tower is controlled by testing the structure prototype used for its basic purpose, and thisis certified by the adequate attest.

    4. TOWER TYPES AND STRENGTH CAPACITY

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    11/44

    STEEL LATTICE TOWERS FOR 10, 20 AND 35 kV TRANSMISSION LINES

    9

    4. 2. TOWER TABLES

    According to the table of allowed tower loads it is possible to select, i.e. to monitor the tower for different types of the

    head and for different load combinations (standard use, additional tap-offs, during reconstruction, repairs, etc.).

    Tables also state the recommended dimensions of the foundation for specific tower heights in relation to the

    characteristic soil bearing capacity, and approximate weight of the tower structure without cross-arms.

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    12/44

    DALEKOVOD - PROJEKT

    10

    SUSPENSION TOWER NAH2

    Nominaltowerheight

    Towerweight

    Foundationpart

    L

    Soil

    dop

    Foundationdimensions

    A T

    m kg cm kN/m2 cm

    9 290 139

    120 + PV 80 190

    150 60 180

    200 + PV 80 170

    250 60 160

    500 60 150

    11 360 141

    120 + PV 80 200

    150 60 190

    200 + PV 80 180

    250 60 170

    500 60 150

    13 420 146

    120 + PV 80 200

    150 60 190

    200 + PV 80 180

    250 60 170

    500 60 150

    Tower type mark NAH2Nominal voltage 20 (35) kVNominal tower height(s) 9, 11, 13 mNominal load Rx, Ry(allowed horizontal load Hx and Hy reduced to thetower top - over the tower height)Basic load safety factor 1.5

    Exceptional load safety factor 1.1Wind force on the structure 2.6xW

    Cross-armlengtha, b, c

    Admissible load on the cross-arm top:

    Hyart. 69.1

    Vzart. 68.1a, 69.1.

    m kN

    0.95 3.25 7.00

    1.20 2.70 5.00

    1.45 2.30 3.40

    1.60 1.90 2.80

    art. 69.1exceptional

    load

    2.

    Basic windload - W

    Nominaltower height

    Nominal load for Vz

    = 8kN

    Rx (Ry=0)art. load 68.1b

    Ry (Rx=0)art. load 68.1c

    N/m2 m kN

    500

    9 5.5 3.3

    11 4.8 2.5

    13 4.6 2.1

    (15) 3.7 1.4

    600

    9 5.4 3.1

    11 4.6 2.2

    13 4.4 1.7(15) 3.5 1.0

    750

    9 5.2 2.7

    11 4.3 1.9

    13 4.1 1.3

    (15) 2.4 0.6

    900

    9 5.0 2.5

    11 4.0 1.5

    13 3.7 0.9

    1100

    9 4.7 2.0

    11 3.6 0.9

    13 1.8 0.4

    1.

    SIDE X SIDE Y

    TOWER FOUNDATION

    EXCAVATIONPERIM

    ETEREXCAVATIONPERIMETER

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    13/44

    STEEL LATTICE TOWERS FOR 10, 20 AND 35 kV TRANSMISSION LINES

    11

    Nominaltowerheight

    Towerweight

    Foundationpart

    L

    Soil

    dop

    FoundationdimensionsA T

    m kg cm kN/m2 cm

    9 320 138

    120 + PV 80 210150 80 180

    200 + PV 80 190

    250 80 160500 80 150

    11 425 144

    120 + PV 80 220150 80 190

    200 + PV 80 200250 80 170500 80 150

    13 490 111

    120 + PV 100 220150 100 190

    200 + PV 100 200250 100 170500 100 150

    15 620 144

    120 + PV 100 230150 100 200

    200 + PV 100 210250 100 180500 100 150

    Tower type mark NAL2Nominal voltage 20 (35) kVNominal tower height(s) 9, 11, 13, 15 mNominal load Rx, Ry(allowed horizontal load Hx and Hy reducedto the tower top - over the tower height or 10.3 m)Basic load safety factor 1.5Exceptional load safety factor 1.1Wind force on the structure 2.6xW

    Cross-armlengtha, b, c

    Admissible load on the tower peak:

    Hyart. 69.1 Vzart. 68.1a, 69.1.m kN

    0.95 5.2 11.01.20 4.4 8.91.45 3.8 6.31.60 2.7 5.2

    art. 69.1exceptional

    load

    2.

    Basic windload - W

    Nominaltower height

    Nominal load for Vz

    = 10.6kNRx (Ry=0)

    art. load 68.1bRy (Rx=0)

    art. load 68.1cN/m2 m kN

    500

    9 6.8 3.711

    6.5 2.91315

    600

    9 6.7 3.411

    6.3 2.61315

    7509 6.4 3.011

    5.9 2.21315

    900

    9 6.1 2.611

    5.5 1.61315

    1100

    9 5.7 2.011

    5.0 1.31315

    1.

    SUSPENSION TOWER NAL2

    SIDE X SIDE Y

    TOWER FOUNDATION

    EXCAVATIONPERIM

    ETER

    EXCAVATIONPERIMETER

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    14/44

    DALEKOVOD - PROJEKT

    12

    Basic windload - W

    Nominaltower height

    Nominal load for Vz

    = 8kNRx (Ry=0)

    art. load 68.1bRy (Rx=0)

    art. load 68.1cN/m2 m kN

    500

    9

    10.7

    8.211 7.013 6.915 5.5

    600

    9

    10.5

    7.911 6.813 6.515 5.1

    7509

    10.37.511 6.2

    13 5.815 4.3

    900

    9

    10.1

    7.011 5.513 5.015 3.4

    1100

    9

    9.8

    6.111 4.713 4.115 2.5

    Nominaltowerheight

    Towerweight

    Foundationpart

    L

    Soil

    dop

    FoundationdimensionsA T

    m kg cm kN/m2 cm

    9 390 124

    120 + PV 100 220150 100 190

    200 + PV 100 200

    250 100 170500 100 160

    11 575 177

    120 + PV 120 220150 120 190

    200 + PV 120 200250 120 170500 120 160

    13 650 101

    120 + PV 120 230150 120 200

    200 + PV 120 210250 120 170500 120 160

    15 785 185

    120 + PV 120 240150 120 200

    200 + PV 120 220250 120 180500 120 160

    Tower type mark NAP2Nominal voltage 20 (35) kVNominal tower height(s) 9, 11, 13, 15 mNominal load Rx, Ry(allowed horizontal load Hx and Hy reduced tothe tower top - over the 8.5 m section)Basic load safety factor 1.5Exceptional load safety factor 1.1Wind force on the structure 2.6xW

    Cross-armlengtha, b, c

    Admissible load on the cross-arm top:

    Hyart. 69.1 Vzart. 68.1a, 69.1.m kN

    0.95 8.3 11.01.20 7.8 8.01.45 6.9 6.01.60 6.4 5.2

    art. 69.1exceptional

    load

    2.

    1.

    SUSPENSION TOWER NAP2

    SIDE X SIDE Y

    TOWER FOUNDATION

    EXCAVATIONPE

    RIMETER

    EXCAVATIONPERIMETER

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    15/44

    STEEL LATTICE TOWERS FOR 10, 20 AND 35 kV TRANSMISSION LINES

    13

    Loadsituation

    Allowed load1. Reduced tothe tower top

    2. At the point of action on the structure

    R=Rx+RyVertical load

    Vz

    Horizontal load for torque(kNm) Basic wind

    load - WMt=0 Mt=5.2

    Hx Hy Hx HyArt. kN kN kN kN N/m2

    68.1

    a 11.3 20 19.5 19.5 11.5 11.5 -

    b

    10.2

    8

    15.0 19.5 8.0 11.5

    Wx

    1100

    11.0 17.5 19.5 9.0 11.5 600

    c9.0

    819.5 14.0 11.5 7.5

    Wy1100

    10.3 19.5 17.0 11.5 8.5 60068.2 11.9 8 19.5 19.5 11.5 11.5 -

    69.2Exceptional

    Mt=8.6 Mt=10.715.5 20.0 9.0 9.0 7.6 7.6 -

    Cross-armlengtha, b, c

    3. Allowed vertical load Vz on the cross-arm for:

    Hy=0 kN Hy=5.3 kN Hy=7.7 kN Hy=10.42 kN

    m kN kN kN kN0.95 11.8 11.3 11.0 10.71.20 8.9 8.3 8.0 7.7

    1.45 6.3 6.1 6.0 5.71.60 5.2 5.2 5.2 4.7

    Nominaltowerheight

    Towerweight

    Foundationpart

    L

    Soil

    dop

    Foundationdimensions

    A Tm kg cm kN/m2 cm

    9 390 112

    120 + PV 140 200150 120 180

    200 + PV 140 180250 120 160500 120 160

    11 500 168

    120 + PV 140 220150 140 180200 + PV 140 200

    250 140 160500 140 160

    13 585 106

    120 + PV 160 220150 140 190

    200 + PV 140 210250 140 170500 140 160

    15 715 183

    120 + PV 160 230150 160 190

    200 + PV 160 200250 160 170

    500 160 160

    Tower type mark ZAE2Nominal voltage 20 (35) kVNominal tower height(s) 9, 11, 13, 15 m

    (17, 19, 21 m)Nominal load R=Rx + Ry(allowed horizontal load Hx and Hy reduced tothe tower top - over the 8.8 m section)Basic load safety factor 1.5Exceptional load safety factor 1.1Wind force on the structure 2.6xW

    The tower can be used only if all three conditions for allowed load (1, 2 and 3) aresatisfied

    TENSION TOWER ZAE2

    SIDE X

    TOWER PEAKPLAN VIEW

    TOWER FOUNDATION

    EXCAVATIONPERIM

    ETER

    EXCAVATIONPERIMETER

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    16/44

    DALEKOVOD - PROJEKT

    14

    Loadsituation

    Allowed load1. Reduced tothe tower top

    2. At the point of action on the structure

    R=Rx+RyVertical load

    Vz

    Horizontal load for torque(kNm) Basic wind

    load - WMt=0 Mt=7.5

    Hx Hy Hx HyArt. kN kN kN kN N/m2

    68.1

    a 17.6 34.0 28.0 28.0 16.0 16.0 -

    b

    17.0

    10.0

    26.0 28.0 14.0 16.0

    Wx

    1100

    17.8 27.0 28.0 15.0 16.0 600

    c16.2

    10.028.0 25.0 16.0 13.0

    Wy1100

    17.3 28.0 26.0 16.0 14.0 60068.2 18.9 10.0 28.0 28.0 16.0 16.0 -

    69.2exceptional

    Mt=12.5 Mt=15.024.2 34.0 19.0 19.0 14.0 14.0 -

    Cross-armlengtha, b, c

    3. Allowed vertical load Vz on the cross-arm for:

    Hy=0 kN Hy=5.3 kN Hy=7.7 kN Hy=10.42 kN

    m kN kN kN kN0.95 11.8 11.2 11.0 10.71.20 8.9 8.3 8.0 7.7

    1.45 6.3 6.1 6.0 5.71.60 5.2 5.2 5.2 4.7

    Nominaltowerheight

    Towerweight

    Foundationpart

    L

    Soil

    dop

    Foundationdimensions

    A Tm kg cm kN/m2 cm

    9 570 112

    120 + PV 140 230150 120 200

    200 + PV 140 210250 120 180500 120 180

    11 730 168

    120 + PV 140 240150 140 200200 + PV 140 220

    250 140 180500 140 160

    13 860 106

    120 + PV 160 240150 160 200

    200 + PV 160 220250 160 180500 140 160

    15 1045 183

    120 + PV 160 250150 160 210

    200 + PV 160 230250 160 190

    500 160 160

    Tower type mark ZAH2Nominal voltage 20 (35) kVNominal tower height(s) 9, 11, 13, 15 m

    (17, 19, 21 m)Nominal load R=Rx + Ry(allowed horizontal load Hx and Hy reduced tothe tower top - over the 8.8 m section)Basic load safety factor 1.5Exceptional load safety factor 1.1Wind force on the structure 2.6xW

    The tower can be used only if all three conditions for allowed load (1, 2 and 3) aresatisfied

    TENSION TOWER ZAH2

    SIDE X

    TOWER PEAKPLAN VIEW

    TOWER FOUNDATION

    EXCAVATIONPERIM

    ETER

    EXCAVATIONPERIMETER

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    17/44

    STEEL LATTICE TOWERS FOR 10, 20 AND 35 kV TRANSMISSION LINES

    15

    Loadsituation

    Allowed load1. Reduced tothe tower top

    2. At the point of action on the structure

    R=Rx+RyVertical load

    Vz

    Horizontal load for torque(kNm) Basic wind

    load - WMt=0 Mt=7.5

    Hx Hy Hx HyArt. kN kN kN kN N/m2

    68.1

    a 26.0 36.0 39.0 39.0 23.5 23.5 -

    b

    23.5

    12.0

    36.0 39.0 19.0 23.5

    Wx

    1100

    25.2 37.0 39.0 20.0 23.5 600

    c22.8

    12.039.0 35.0 23.5 18.0

    Wy1100

    24.3 39.0 36.0 23.5 19.0 60068.2 27.3 12.0 39.0 39.0 23.5 23.5 -

    69.2Exceptional

    Mt=17 Mt=21.535.8 36.0 26.0 26.0 18.0 18.0 -

    Cross-armlengtha, b, c

    3. Allowed vertical load Vz on the cross-arm for:

    Hy=0 kN Hy=5.3 kN Hy=7.7 kN Hy=10.42 kN

    m kN kN kN kN0.95 11.8 11.2 11.0 10.71.20 8.9 8.3 8.0 7.7

    1.45 6.3 6.1 6.0 5.71.60 5.2 5.2 5.2 4.7

    Nominaltowerheight

    Towerweight

    Foundationpart

    L

    Soil

    dop

    Foundationdimensions

    A Tm kg cm kN/m2 cm

    9 730 114

    120 + PV 160 240150 120 220

    200 + PV 160 210250 120 200500 120 170

    11 935 170

    120 + PV 160 250150 140 220200 + PV 160 230

    250 140 200500 140 170

    13 1140 106

    120 + PV 160 260150 160 220

    200 + PV 160 240250 160 200500 160 170

    15 1390 183

    120 + PV 160 280150 160 230

    200 + PV 160 250250 160 210

    500 160 170

    Tower type mark ZAJ2Nominal voltage 20 (35) kVNominal tower height(s) 9, 11, 13, 15 m

    (17, 19, 21 m)Nominal load R=Rx + Ry(allowed horizontal load Hx and Hy reduced tothe tower top - over the 8.8 m section)Basic load safety factor 1.5Exceptional load safety factor 1.1Wind force on the structure 2.6xW

    The tower can be used only if all three conditions for allowed load (1, 2 and 3) aresatisfied

    TENSION TOWER ZAJ2

    SIDE X

    TOWER PEAKPLAN VIEW

    TOWER FOUNDATION

    EXCAVATIONPERIM

    ETER

    EXCAVATIONPERIMETER

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    18/44

    DALEKOVOD - PROJEKT

    16

    TENSION TOWER ZAL2

    Loadsituation

    Allowed load1. Reduced tothe tower top

    2. At the point of action on the structure

    R=Rx+RyVertical load

    Vz

    Horizontal load for torque(kNm) Basic wind

    load - WMt=0 Mt=7.5

    Hx Hy Hx HyArt. kN kN kN kN N/m2

    68.1

    a 34.5 46.0 55.0 55.0 35.0 35.0 -

    b

    33.6

    14.8

    50.0 55.0 30.0 35.0

    Wx

    1100

    34.9 52.0 55.0 31.0 35.0 600

    c33.0

    14.855.0 49.0 35.0 29.0

    Wy1100

    34.5 55.0 51.0 35.0 30.0 60068.2 36.2 14.8 55.0 55.0 35.0 35.0 -

    69.2Exceptional

    Mt=22 Mt=2947.5 46.0 41.0 41.0 26.0 26.0 -

    Cross-armlengtha, b, c

    3. Allowed vertical load Vz on the cross-arm for:

    Hy=0 kN Hy=5.3 kN Hy=7.7 kN Hy=10.42 kN

    m kN kN kN kN0.95 11.8 11.2 11.0 10.71.20 8.9 8.3 8.0 7.7

    1.45 6.3 6.1 6.0 5.71.60 5.2 5.2 5.2 4.7

    Nominaltowerheight

    Towerweight

    Foundationpart

    L

    Soil

    dop

    FoundationDimensions

    A Tm kg cm kN/m2 cm

    9 1035 130

    120 + PV 180 240150 140 230

    200 + PV 180 220250 140 200500 120 180

    11 1305 183

    120 + PV 180 260150 140 240200 + PV 180 230

    250 140 210500 140 180

    13 1485 189

    120 + PV 180 270150 160 240

    200 + PV 180 240250 160 210500 160 180

    15 1825 183

    120 + PV 180 280150 160 250

    200 + PV 180 260250 160 220

    500 160 190

    Tower type mark ZAL2Nominal voltage 20 (35) kVNominal tower height(s) 9, 11, 13, 15 m

    (17, 19, 21 m)Nominal load R=Rx + Ry(allowed horizontal load Hx and Hy reduced tothe tower top - over the 10.45 m section)Basic load safety factor 1.5Exceptional load safety factor 1.1Wind force on the structure 2.6xW

    The tower can be used only if all three conditions for allowed load (1, 2 and 3) aresatisfied

    SIDE X

    TOWER PEAKPLAN VIEW

    TOWER FOUNDATION

    EXCAVATIONPERIM

    ETER

    EXCAVATIONPERIMETER

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    19/44

    STEEL LATTICE TOWERS FOR 10, 20 AND 35 kV TRANSMISSION LINES

    17

    Loadsituation

    Allowed load1. Reduced tothe tower top

    2. At the point of action on the structure

    R=Rx+RyVertical load

    Vz

    Horizontal load for torque(kNm) Basic wind

    load - WMt=0 Mt=7.5

    Hx Hy Hx HyArt. kN kN kN kN N/m2

    68.1

    a 45.0 58.0 68.0 68.0 40.5 40.5 -

    b

    41.8

    16.0

    65.0 68.0 35.0 40.5

    Wx

    1100

    44.8 66.0 68.0 36.0 40.5 600

    c41.1

    16.068.0 64.0 40.5 34.5

    Wy1100

    44.4 68.0 65.0 40.5 35.5 60068.2 47.2 16.0 68.0 68.0 40.5 40.5 -

    69.2Exceptional

    Mt=27 Mt=3862.0 58.0 50.0 50.0 31.0 31.0 -

    Cross-armlengtha, b, c

    3. Allowed vertical load Vz on the cross-arm for:

    Hy=0 kN Hy=5.3 kN Hy=7.7 kN Hy=10.42 kN

    m kN kN kN kN0.95 11.8 11.2 11.0 10.71.20 8.9 8.3 8.0 7.7

    1.45 6.3 6.1 6.0 5.71.60 5.2 5.2 5.2 4.7

    Nominaltowerheight

    Towerweight

    Foundationpart

    L

    Soil

    dop

    Foundationdimensions

    A Tm kg cm kN/m2 cm

    9 1260 130

    120 + PV 200 250150 160 230

    200 + PV 200 220250 140 210500 120 180

    11 1600 183

    120 + PV 200 260150 160 240200 + PV 200 240

    250 140 230500 140 200

    13 1850 189

    120 + PV 200 280150 160 260

    200 + PV 200 250250 160 230500 160 190

    15 2260 183

    120 + PV 200 290150 160 270

    200 + PV 200 260250 160 240

    500 160 200

    Tower type mark ZAM2Nominal voltage 20 (35) kVNominal tower height(s) 9, 11, 13, 15 m

    (17, 19, 21 m)Nominal load R=Rx + Ry(allowed horizontal load Hx and Hy reduced tothe tower top - over the 12.5 m section)Basic load safety factor 1.5Exceptional load safety factor 1.1Wind force on the structure 2.6xW

    The tower can be used only if all three conditions for allowed load (1, 2 and 3) aresatisfied

    TENSION TOWER ZAM2

    SIDE X

    TOWER PEAKPLAN VIEW

    TOWER FOUNDATION

    EXCAVATIONPERIM

    ETER

    EXCAVATIONPERIMETER

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    20/44

    DALEKOVOD - PROJEKT

    18

    4. 3. EXAMPLE OF SELECTING AND MONITORING TOWERS FOR CERTAIN LOAD CONDITIONS

    The resulting force reduced to the top of the tower for a specific load must be less or equal to the nominal load. Also, it

    is necessary to fulfil the combined conditions including the allowed torque, sum of horizontal forces and the allowed

    load on the cross-arms, depending on the length of the cross-arm. In case of higher then permitted vertical load on the

    cross-arm, the cross-arm should be reinforced by stays or props.

    Rx, Ry, load reduced to the tower top

    Hx, Hy, Vz, load at the point of action on the structure

    Rx = (Hx1 h

    1+Hx

    2 h

    2+Hx

    3 h

    3+Vz

    2Vz

    3 .a) /h

    R

    Ry = (Hy1 h

    1+Hy

    2 .h

    2+Hy

    3 h

    3) / h

    R

    Rx + Ry dopR

    MT

    = Hy2

    - Hy3 a

    Hx = Hx1

    + Hx2

    + Hx3

    dopHx

    Hy = Hy1

    + Hy2

    + Hy3

    dopHy

    Vz = Vz1

    + Vz2

    + Vz3

    dopVz

    hR

    =sec

    tiono

    floa

    dre

    duc

    tion

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    21/44

    STEEL LATTICE TOWERS FOR 10, 20 AND 35 kV TRANSMISSION LINES

    19

    Load in line with the Regulation on Overhead Power Lines of Nominal Voltage Between 1 and 400 kV (Offi cial Gazette

    no. 65/88, OG no. 55/96).

    Load

    situation art.

    Vx Vy Vz Zx Zy Zz Sx Sy

    kN kN kN kN kN kN kN/m2 kN/m2

    68.1

    a 5.4 - 6.8 4.3 - 4.2 - -

    b 6.1 - 2.5 4.3 - 1.12.6 x0.9

    -

    c 3.6 0.7 2.5 2.9 0.4 1.1 -2.6 x0.9

    68.2 1.8 6.7 2.5 1.4 5.3 1.1 - -

    69.2

    P.V. 2.7 10.1 6.8 - - -- -

    N.V. 5.4 - 6.8 4.3 - 4.2

    Pzu - - - 2.1 8.0 4.2

    - -

    Nzu 5.4 - 6.8 - - -

    EXAMPLE

    conductors: 3 x Al/ 95/15 mm2, = 95 N/mm2

    earth wire: III 35 mm2 , = 240 N/mm2

    semi-sum of adjacent spans: aW

    = 200 m

    weight span: agr

    = 400 m

    wind pressure (load): w = 900 N/m2

    additional load: dt= 1.6 x 0.18 d daN/m

    purpose of the tower on the route: angle-tension

    line route deviation angle: = 150

    selected head type: JU22 Hypo

    the

    tica

    ltower

    ZAJ

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    22/44

    DALEKOVOD - PROJEKT

    20

    Reduced to the top of the tower and sum of forces:

    Load situation art. 68.1.b.

    Rx =[4.3x8.8+6.1x(7.1+5.4+4.55)+2.5x1.45]/8.8 = 16.6 kN

    Ry = 0

    R = 16.6 kN

    Vz =1.1+3x2.5 = 8.6 kNHy = 0Hx = 4.3+3x6.1 = 22.6 kNM

    T= 0

    Load situation art. 68.2.

    Rx = (1.4x8.8+1.8x17.05+2.5x1.45)/8.8 = 5.30 kNRy = (5.3x8.8+6.7x17.05)/8.8= 18.30 kN

    R = 23.6 kN

    Vz = 8.6 kN

    Selected:

    tower ZAJ2 dop R = 27.3 kN > 23.6 kN

    dopVz = 12 kN > 8.6 kN

    MT

    = 6.7 x 1.45 = 9.7 kNm < 10.5 kNm

    Hy = 5.3+3x6.7 = 25.4 kN < dop Hy = 28.5 kN za MT

    = 10.5 kNm

    Hx = 1.4+3x1.8 = 6.8 kN < dop Hx = 28.5 kN za MT

    = 10.5 kNm

    control for load situation art. 68.1.b.

    Hx = 22.6 kN < dop Hx = 36 kN za MT

    = 0

    Load situation art. 69.2.

    MT

    = 10.1x1.45 = 14.7 kNm < 17 kNm

    Hx = 4.3+2.7+2x5.4 = 17.8 kN < 26 kN za MT

    = 17 kNm

    Hy = 10.1 kN < 26 kN za MT

    = 17 kNm

    control of the vertical load on the cross-arm

    Vz = 6.8 kN, Hy = 10.1 kN 10.42 kN

    za a= b= 1.20 m dop Vz = 7.7 kN > 6.8 kNmza c= 1.45 m dop Vz = 5.7 kN < 6.8 kNm

    THE LOWER CROSS-ARM IS TO BE REINFORCED BY STAYS (OR PROPS)

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    23/44

    STEEL LATTICE TOWERS FOR 10, 20 AND 35 kV TRANSMISSION LINES

    21

    5. RECOMMENDED SELECTION OF TOWERS

    5. 1.MOST COMMON STRUCTURES AND CROSS SECTIONS FOR NON-INSULATED CONDUCTORSIN DIFFERENT CLIMATE CONDITIONS

    The application tables define the recommended types of towers and appropriate purpose of the tower in the route, for

    certain conductor cross sections and specific max. working stress, conventional shapes of tower head type and when

    used in different climate conditions,. For suspension towers the allowed wind span is stated (semi-sum of the adjacent

    spans), as also for the tension towers the allowed route deviation angle is present. Towers are selected based on themost appropriate wind span relevant for the construction of the tower, and the allowed electric span.

    Electric spans defined in tables refer to use of post type isolators (string 0.00m), on the adjacent towers with equal spans

    of conductor suspension i.e. equal tower head type. Actual electric spans should be precisely defined and controlled

    depending on the suspension equipment and head forms of adjacent towers.

    The working stress of conductors does not influence the admissible wind spans for suspension tower structures. Still

    it conditions the required tower height (influence on the conductor sag) and the possibility of using the tower in case

    of exceptional load (influence on the breaking strength). The allowed wind spans stated for conductor suspension sets

    are equal for a specific tower head type, conductor cross section and basic wind load without regard to the quantity of

    the conductor working stress.

    The allowed sum of vertical forces relates to vertical load of conductors and suspension equipment and electrical

    devices (disconnectors, etc.) placed on the tower.

    ELEMENTS DEFINED BY THE TOWER HEAD TYPE MARK

    head type: G, D, J, B, TJU, BU - with earth wire

    upper cross-arm length: 1 - 95 cm

    2 - 120 cm

    3 - 145 cm

    4 - 160 cm

    distance between upper cross-arms, i.e.

    between the top and the upper cross-arm: 1 - 85 cm2 - 170 cm

    3 - 255 cm

    4 - 340 cm

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    24/44

    DALEKOVOD - PROJEKT

    22

    TOWER HEAD TYPE

    - all measures are in centimetres

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    25/44

    STEEL LATTICE TOWERS FOR 10, 20 AND 35 kV TRANSMISSION LINES

    23

    5. 2. CONDUCTOR SUSPENSION SETS

    CONDUCTORS Al/ 50/8 mm2

    BASIC WIND LOAD

    W = 500 N/m2

    Maximum conductor working stress, = 95 N/mm2Conductor suspension sets

    ELECTRIC SPANS (m)

    HEAD TYPE

    ADDITIONAL LOADG2 G4 D11 D21 D12 D22

    J11

    J21J22 B21 B22 B23

    1,0 107 152 115 137 185 206 165 260 72 165 260

    1,6 89 126 96 114 154 171 137 216 60 137 216

    2,5 73 104 79 94 128 142 114 179 50 114 179

    dopV

    z

    (kN) tower type

    ALLOWED SEMI-SUM OF ADJACENT SPANS (m)

    (wind span)

    8,09

    NAH2* 1113

    315 330 350 320 330 170235195180

    265215200

    10,6 NAL2 9 15 satisfies all stated electric spans

    CONDUCTORS Al/ 50/8 mm2

    BASIC WIND LOAD

    W = 600 N/m2

    Maximum conductor working stress, = 95 N/mm2Conductor suspension sets

    ELECTRIC SPANS (m)

    HEAD TYPE

    ADDITIONAL LOAD

    G2 G4 D11 D21 D12 D22J11

    J21J22 B21 B22 B23

    1,0 105 149 113 134 182 201 162 254 70 162 254

    1,6 87 124 94 112 154 168 134 212 59 134 212

    2,5 72 102 78 93 125 139 111 175 49 111 175

    dopV

    z

    (kN)

    tower typeALLOWED SEMI-SUM OF ADJACENT SPANS (m)

    (wind span)

    8,09

    NAH2* 1113

    250 260 270 250 260 130190157145

    220170155

    10,6 NAL2 9 15 satisfies all stated electric spans 185 200 225

    13,6 NAP2 9 15 satisfies all stated electric spans 430

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    26/44

    DALEKOVOD - PROJEKT

    24

    CONDUCTORS Al/ 50/8 mm2

    BASIC WIND LOAD

    W = 750 N/m2

    Maximum conductor working stress, = 95 N/mm2Conductor suspension sets

    ELECTRIC SPANS (m)

    HEAD TYPE

    ADDITIONAL LOAD

    G2 G4 D11 D21 D12 D22J11

    J21J22 B21 B22 B23

    1,0 102 146 111 131 178 197 158 249 69 158 249

    1,6 85 121 92 110 148 164 132 207 57 132 207

    2,5 71 100 76 91 122 136 109 172 48 109 172

    dopV

    z

    (kN) tower type

    ALLOWED SEMI-SUM OF ADJACENT SPANS (m)

    (wind span)

    8,09

    NAH2* 1113

    185 195 205 185 195130205100

    145115105

    165130115

    10,6 NAL2 9 15 satisfies all stated electric spans 160 180

    13,6 NAP2 9 15 satisfies all stated electric spans 335

    CONDUCTORS Al/ 50/8 mm2

    BASIC WIND LOADW = 900 N/m2

    Maximum conductor working stress, = 95 N/mm2Conductor suspension sets

    ELECTRIC SPANS (m)

    HEAD TYPE

    ADDITIONAL LOADG2 G4 D11 D21 D12 D22

    J11

    J21J22 B21 B22 B23

    1,0 101 144 109 130 175 195 156 246 68 156 246

    1,6 84 120 91 108 146 162 130 205 57 130 205

    2,5 70 99 75 89 121 134 107 169 47 107 169

    DopV

    z

    (kN)tower type

    ALLOWED SEMI-SUM OF ADJACENT SPANS (m)(wind span)

    8,09

    NAH2* 1113

    190154140

    145

    220170155

    190150120

    205160130

    1058060

    1159065

    13510070

    10,6NAL2 9

    11 15210 225 235 210

    265225

    115145125

    165140

    13,6NAP2 9

    11 15satisfies all stated electric spans 240 275

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    27/44

    STEEL LATTICE TOWERS FOR 10, 20 AND 35 kV TRANSMISSION LINES

    25

    CONDUCTORS Al/ 50/8 mm2

    BASIC WIND LOAD

    W = 1100 N/m2

    Maximum conductor working stress, = 95 N/mm2Conductor suspension sets

    ELECTRIC SPANS (m)

    HEAD TYPE

    ADDITIONAL LOAD

    G2 G4 D11 D21 D12 D22J11

    J21J22 B21 B22 B23

    1.0 100 142 108 128 173 192 154 243 67 154 243

    1.6 83 118 90 107 144 160 128 202 56 128 202

    2.5 69 98 74 88 119 132 106 167 46 106 167

    dop

    Vz

    (kN) tower type

    ALLOWED SEMI-SUM OF ADJACENT SPANS (m)(wind span)

    8,09

    NAH2* 1113

    14511555

    15512055

    16512560

    145110

    155120

    8055

    9060

    10070

    10,6 NAL2 9 15 160 170 180175155

    190165

    9545

    11050

    12565

    13,6NAP2 9 13

    15satisfies all stated electric spans 340 150

    190165

    220185

    8,0ZAE2 9 15

    (17 21)**satisfies all stated electric spans

    (W = 1300 N/m2)**195140

    225145

    10,0ZAH2 9 15

    (17 21)**satisfies all stated electric spans

    (W = 1300 N/m2)**310260

    360300

    * => Tower type NAH2 with cross-arm length 1.45 m (J21, J22, B) and 1.6 m (G4), does not satisfy the

    required mechanical resistance and stability requirements in case of exceptional load i.e. in case of

    conductor breaking.

    ** => Allowed wind spans are defined for the higher wind area due to the fact that towers have over 15 m.

    For the defined wind it is also necessary to use adequate electric spans.

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    28/44

    DALEKOVOD - PROJEKT

    26

    CONDUCTORS Al/ 70/12 mm2

    BASIC WIND LOAD

    W = 500 N/m2

    Maximum conductor working stress, = 95 N/mm2Conductor suspension sets

    ELECTRIC SPANS (m)

    HEAD TYPE

    ADDITIONAL LOAD

    G2 G4 D11 D21 D12 D22J11

    J21J22 B21 B22 B23

    1,0 110 156 119 142 155 212 170 268 74 170 268

    1,6 93 132 100 119 131 179 143 226 62 143 255

    2,5 77 110 83 99 109 149 120 188 52 120 188

    dopV

    z

    (kN) tower type

    ALLOWED SEMI-SUM OF ADJACENT SPANS (m)

    (wind span)

    8,09

    NAH2* 1113

    260 270 285 260 270170145140

    190160150

    210175160

    10,6NAL2 9

    11 15satisfies all stated electric spans

    260235

    CONDUCTORS Al/ 70/12 mm2

    BASIC WIND LOAD

    W = 600 N/m2

    Maximum conductor working stress, = 95 N/mm2Conductor suspension sets

    ELECTRIC SPANS (m)

    HEAD TYPE

    ADDITIONAL LOAD

    G2 G4 D11 D21 D12 D22J11

    J21J22 B21 B22 B23

    1.0 108 153 116 138 187 207 166 262 72 166 262

    1.6 91 129 98 116 157 175 140 220 61 140 220

    2.5 76 107 82 97 131 146 117 184 51 117 184

    dop

    Vz

    (kN) tower type

    ALLOWED SEMI-SUM OF ADJACENT SPANS (m)(wind span)

    8,09

    NAH2* 1113

    200 210 225 200280230220

    140115110

    155125115

    180140125

    10,6NAL2 9

    11 15satisfies all stated electric spans

    330300

    160 175210190

    13,6NAP2 9

    11 15satisfies all stated electric spans 340

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    29/44

    STEEL LATTICE TOWERS FOR 10, 20 AND 35 kV TRANSMISSION LINES

    27

    CONDUCTORS Al/ 70/12 mm2

    BASIC WIND LOAD

    W = 750 N/m2

    Maximum conductor working stress, = 95 N/mm2Conductor suspension sets

    ELECTRIC SPANS (m)

    HEAD TYPE

    ADDITIONAL LOAD

    G2 G4 D11 D21 D12 D22J11

    J21J22 B21 B22 B23

    1,0 105 149 113 135 182 202 162 255 71 162 256

    1,6 88 126 95 114 154 170 137 215 60 137 215

    2,5 74 105 80 95 128 142 114 179 50 114 179

    dop

    Vz

    (kN) tower type

    ALLOWED SEMI-SUM OF ADJACENT SPANS (m)(wind span)

    8,09

    NAH2* 1113

    150 160225180165

    195160150

    210170160

    801209585

    13510595

    10,6NAL2 9

    11 15satisfies all stated electric

    spans240 220 235 115

    140125

    160140

    13,6NAP2 9

    11 15satisfies all stated electric spans 230 260

    CONDUCTORS Al/ 70/12 mm2

    BASIC WIND LOAD

    W = 900 N/m2

    Maximum conductor working stress, = 95 N/mm2Conductor suspension sets

    ELECTRIC SPANS (m)

    HEAD TYPE

    ADDITIONAL LOAD

    G2 G4 D11 D21 D12 D22J11

    J21J22 B21 B22 B23

    1,0 103 147 111 133 179 199 160 251 70 160 251

    1,6 87 124 94 112 151 168 134 212 59 134 212

    2,5 73 103 78 93 126 140 112 177 49 112 177

    dopV

    z

    (kN)tower type

    ALLOWED SEMI-SUM OF ADJACENT SPANS (m)(wind span)

    8,09

    NAH2* 1113

    155125115

    165130120

    180140125

    155125100

    165130105

    856550

    957550

    1108055

    10,6NAL2 9

    11 15170 165

    220195

    190170

    205180

    10595

    115100

    135115

    13,6NAP2 9

    11 15satisfies all stated electric spans 190 220

    8,0ZAE2 9 15

    (17 21)**satisfies all stated electric spans

    (W = 1300 N/m2)**200160

    225180

    10,0ZAH2 9 15

    (17 21)**satisfies all stated electric spans

    (W = 1300 N/m2)**365295

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    30/44

    DALEKOVOD - PROJEKT

    28

    CONDUCTORS Al/ 70/12 mm2

    BASIC WIND LOAD

    W = 1100 N/m2

    Maximum conductor working stress, = 95 N/mm2Conductor suspension sets

    ELECTRIC SPANS (m)

    HEAD TYPE

    ADDITIONAL LOADG2 G4 D11 D21 D12 D22

    J11

    J21 J22 B21 B22 B23

    1,0 102 145 110 131 177 196 157 248 69 157 248

    1,6 86 122 92 110 149 165 132 208 58 132 208

    2,5 72 102 77 92 124 138 110 174 48 110 174

    dopV

    z

    (kN)tower type

    ALLOWED SEMI-SUM OF ADJACENT SPANS (m)(wind span)

    8,09

    NAH2* 11

    13

    12090

    45

    12595

    45

    135105

    50

    12090

    13095

    6545

    7050

    8055

    10,6NAL2 9

    11 15145130

    155135

    165145

    145120

    155135

    8035

    9040

    10045

    13,6NAP2 9 13

    15satisfies all stated electric spans

    155135

    175150

    8,0ZAE2 9 15

    (17 21)**satisfies all stated electric spans

    (W = 1300 N/m2)**290220

    140110

    160115

    180120

    10,0ZAH2 9

    (11 21)**satisfies all stated electric spans

    (W = 1300 N/m2)**270225

    295255

    * => Tower type NAH2 (for all head types) and tower NAL2 with cross-arm length 1.6 m does not satisfy the

    required mechanical resistance and stability requirements in case of exceptional load i.e. in case of

    conductor breaking.

    ** => Allowed wind spans are defined for the higher wind area due to the fact that towers have over 15 m. For

    the defined wind it is also necessary to use adequate electric spans.

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    31/44

    STEEL LATTICE TOWERS FOR 10, 20 AND 35 kV TRANSMISSION LINES

    29

    CONDUCTORS Al/ 95/15 mm2

    BASIC WIND LOAD

    W = 500 N/m2

    Maximum conductor working stress, = 95 N/mm2Conductor suspension sets

    ELECTRIC SPANS (m)

    HEAD TYPE

    ADDITIONAL LOADG2 G4 D11 D21 D12 D22

    J11

    J21 J22 B21 B22 B23

    1,0 108 188 120 152 216 243 204 321 89 204 321

    1,6 92 160 102 129 184 207 174 273 76 174 273

    2,5 77 134 86 109 155 174 146 230 64 146 230

    dopV

    z

    (kN)tower type

    ALLOWED SEMI-SUM OF ADJACENT SPANS (m)(wind span)

    8,09

    NAH2* 11

    13

    220 230 245 220275245

    235

    120165135

    130

    185150

    140

    10,6NAL2* 9

    11 15satisfies all stated electric spans 310 170

    205180

    230210

    13,6NAP2 9

    11 15satisfies all stated electric spans 300 325 350

    CONDUCTORS Al/ 95/15 mm2

    BASIC WIND LOAD

    W = 600 N/m2

    Maximum conductor working stress, = 95 N/mm2Conductor suspension sets

    ELECTRIC SPANS (m)

    HEAD TYPE

    ADDITIONAL LOAD

    G2 G4 D11 D21 D12 D22J11

    J21J22 B21 B22 B23

    1,0 104 183 116 147 210 236 199 313 87 199 313

    1,6 88 155 99 125 179 201 169 266 74 169 266

    2,5 74 131 83 105 150 169 142 224 62 143 224

    dopV

    z

    (kN)tower type

    ALLOWED SEMI-SUM OF ADJACENT SPANS (m)(wind span)

    8,09

    NAH2* 1113

    220185175

    180250205195

    215185175

    230195185

    90135110100

    155120110

    10,6NAL2* 9

    11 15satisfies all stated electric spans 260 135

    165150

    190165

    13,6 NAP2 9 15 satisfies all stated electric spans 267 300

    8,0ZAE2 9 15

    (17 21)**satisfies all stated electric spans

    (W = 750 N/m2)**310240

    10,0

    ZAH2 9 15

    (17 21)**

    satisfies all stated electric spans

    (W = 750 N/m2)**

    480

    380

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    32/44

    DALEKOVOD - PROJEKT

    30

    CONDUCTORS Al/ 95/15 mm2

    BASIC WIND LOAD

    W = 750 N/m2

    Maximum conductor working stress, = 95 N/mm2Conductor suspension sets

    ELECTRIC SPANS (m)

    HEAD TYPE

    ADDITIONAL LOADG2 G4 D11 D21 D12 D22

    J11

    J21 J22 B21 B22 B23

    1,0 99 178 111 142 204 229 193 304 84 19 304

    1,6 85 151 95 121 173 195 164 259 72 165 259

    2,5 71 127 80 101 146 164 138 218 60 138 218

    dopV

    z

    (kN)tower type

    ALLOWED SEMI-SUM OF ADJACENT SPANS (m)(wind span)

    8,09

    NAH2 11

    13

    165140

    130

    180145

    135

    195155

    145

    165135

    130

    180145

    135

    9075

    70

    10580

    75

    11590

    80

    10,6NAL2* 9

    11 15190 200

    235215

    205190

    225200

    100125110

    145125

    13,6 NAP2 9 15 satisfies all stated electric spans 210 235

    8,0ZAE2 9 15

    (17 21)**satisfies all stated electric spans

    (W = 900 N/m2)**380310

    190155

    210170

    240195

    10,0ZAH2 9 15

    (17 21)**satisfies all stated electric spans

    (W = 900 N/m2)**380320

    CONDUCTORS Al/ 95/15 mm2BASIC WIND LOAD

    W = 900 N/m2

    Maximum conductor working stress, = 95 N/mm2Conductor suspension sets

    ELECTRIC SPANS (m)

    HEAD TYPE

    ADDITIONAL LOAD

    G2 G4 D11 D21 D12 D22J11

    J21J22 B21 B22 B23

    1,0 96 174 108 138 199 224 190 299 83 190 299

    1,6 82 148 92 118 170 190 161 254 70 161 254

    2,5 69 125 78 99 143 160 136 214 59 136 214

    dopV

    z

    (kN)tower type

    ALLOWED SEMI-SUM OF ADJACENT SPANS (m)(wind span)

    8,09

    NAH2* 1113

    135105100

    145115105

    155120110

    13510585

    14511590

    755540

    806545

    957050

    10,6NAL2 9

    11 15165150

    155190165

    165145

    175155

    9080

    10090

    11695

    13,6 NAP2 9 15 satisfies all stated electric spans 170 195

    8,0ZAE2 9 15

    (17 21)**satisfies all stated electric spans

    (W = 1100 N/m2)**310295

    155120

    170140

    195155

    10,0ZAH2 9 15

    (17 21)**satisfies all stated electric spans

    (W = 1100 N/m2)**280220

    320265

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    33/44

    STEEL LATTICE TOWERS FOR 10, 20 AND 35 kV TRANSMISSION LINES

    31

    CONDUCTORS Al/ 95/15 mm2

    BASIC WIND LOAD

    W = 1100 N/m2

    Maximum conductor working stress, = 95 N/mm2Conductor suspension sets

    ELECTRIC SPANS (m)

    HEAD TYPE

    ADDITIONAL LOADG2 G4 D11 D21 D12 D22

    J11

    J21 J22 B21 B22 B23

    1,0 94 172 106 135 195 220 187 294 81 187 294

    1,6 80 146 90 115 166 187 159 250 69 159 250

    2,5 67 123 76 97 140 157 134 210 58 134 210

    dopV

    z

    (kN)tower type

    ALLOWED SEMI-SUM OF ADJACENT SPANS (m)(wind span)

    8,09

    NAH2* 11

    13

    10080

    40

    11085

    40

    11590

    40

    55 60

    .10,6NAL2* 9

    11 15125110

    135120

    145125

    125110

    135115

    7030

    7535

    8535

    13,6NAP2 9 13

    15210 230 250 220 235

    125105

    135115

    155130

    8,0ZAE2 9 15

    (17 21)**

    satisfies all stated electricspans

    (W = 1300 N/m2)**

    255

    185

    235

    180

    255

    185

    120

    90

    140

    95

    165

    100

    10,0ZAH2 9 15

    (17 21)**satisfies all stated electric spans

    (W = 1300 N/m2)**220190

    265220

    * => Tower type NAH2 (for all head forms) and tower NAL2 with cross-arm length over 1.20 m does not

    satisfy the required mechanical resistance and stability requirements in case of exceptional load

    i.e. in case of conductor breaking.

    ** => Allowed wind spans are defined for the higher wind area due to the fact that towers have over 15

    m. For the defined wind it is also necessary to use adequate electric spans.

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    34/44

    DALEKOVOD - PROJEKT

    32

    5. 3.CONDUCTOR TENSION SETS

    CONDUCTORS Al/ 95/15 mm2Maximum conductor working stress, = 95 N/mm2

    Conductor suspension sets

    TOWER HEAD TYPE TOWER TYPETHE PURPOSE

    OF THE TOWER

    IN THE TRANSMISSION LINE ROUTE

    ALLOWED WIND SPANS FOR THE

    STRUCTURE(CONTROL ELECTRIC SPANS)

    aw

    =(l1+l

    2)/2 (m) W (N/m2)

    G2, G4

    (G1, G3)

    ZAL2Ka 90

    260 1100KR 120 180

    ZAJ2 KR 145 180 200

    D11, D21

    (D31, D41)

    ZAL2Ka 90

    320 1100KR 120 180

    ZAJ2 KR 130 180 160 1100210 900

    D12, D22

    (D32, D42)

    ZAL2Ka 90

    370 1100KR 120 180

    ZAJ2

    Ka 90 i

    KR 120 124

    130 1100

    180 900

    230 750

    KR 125 129

    160 1100

    220 900

    280 750

    KR 130 139200 1100

    260 900

    KR 140 180 270 1100

    J11, J21

    (J21*)

    ZAL2Ka 90

    320 1100KR 120 180

    ZAJ2

    KR 130 134165 1100

    220 900

    KR 135 180200 1100

    260 900

    J22

    (J22*)

    ZAL2Ka 90

    380 1100KR 120 180

    ZAJ2

    KR 125 129

    170 1100

    185 900

    240 750

    KR 130 139

    210 1100

    270 900

    340 750

    KR 140 180280 1100

    350 900

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    35/44

    STEEL LATTICE TOWERS FOR 10, 20 AND 35 kV TRANSMISSION LINES

    33

    CONDUCTORS Al/ 95/15 mm2Maximum conductor working stress, = 95 N/mm2

    Conductor suspension sets

    TOWER HEAD TYPE TOWER TYPE

    THE PURPOSE

    OF THE TOWER

    IN THE TRANSMISSION LINE ROUTE

    ALLOWED WIND SPANS FOR THE

    STRUCTURE(CONTROL ELECTRIC SPANS)

    aw

    =(l1+l

    2)/2 (m) W (N/m2)

    B21

    (B31)

    ZAM2 KR 155-180 230

    1100ZAM2

    = 70 N/mm2Ka 90 i

    KR 120-180150

    B22

    (B32)

    ZAM2 KR 150-180 250 1100

    ZAM2

    = 80 N/mm2Ka 90 i

    KR 120-180

    130 110

    160 900

    200 750

    ZAL2 R 180 300 1100

    B23

    (B33)

    ZAM2 KR 125-180

    135 1100

    175 900

    220 750

    ZAM2

    = 80 N/mm2Ka 90 i

    KR 120-180

    170 1100

    210 900

    270 750

    ZAL2 KR 165-180 330 1100

    ZAL2

    = 80 N/mm2 KR 125-180140 1100180 900

    225 750

    Vertical forces must not exceed the allowed vertical forces for certain load scenarios and for specific cross-arm

    lengths, as defined by the strength capacity table i.e. by the allowed load for a specific tower.

    The defined wind spans allowed for the sharpest route deviation angle, is increased for other angles and can be

    controlled according to the tower strength capacity table

    Head types marked with * (J21*, J22*) are applied in cases when the torque at the basic load exceeds the values

    from the strength capacity table. In this case the MT value relates to the length of the higher, and not lower

    cross-arm.

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    36/44

    DALEKOVOD - PROJEKT

    34

    When place orders for towers it is necessary to state the required number of a certain type of towers, their height, as

    also to required number of cross-arms.

    Cross-arms are defined by a specific type of tower, by the head type and arrangement of conductors suspension on

    the tower.

    E.g.

    For the transmission line route with suspension insulator strings, hanged over hinges, type of the head J21 and J22,towers type NAL2 5 pieces and ZAE2 in the function of suspension tower 1 pc., and the tension towers, head type

    D21 and D22, tower type ZAJ2 2 pcs., and head type J21, tower ZAE2 1 pc., it is necessary to place the following

    order:

    Towers:

    tower NAL2 13, 3 pcs.

    tower NAL2 15, 2 pcs.

    tower ZAE2 17, 2 pcs.

    tower ZAJ2 11, 2 pcs

    Konzole za nosivo zavjeenje vodia preko zastavica:

    NAL2: 2 10 pcs.

    J3 5 pcs.

    ZAE2: J2 2 pcs.

    J3 1 pc.

    Cross-arms for tension of conductors over hinges:

    ZAJ2: TOP 2 psc.

    D2 2 pcs.

    G3 1 pc. (tap-off)ZAE2: J2 2 pcs.

    J3 1 pc.

    For the structure (cross-arm, application of stays or props, auxiliary equipment girder) that is not covered by the

    catalogue, it is necessary to deliver the request accompanied with relevant technical documentation, i.e. description

    based on which it is possible to make a proposal and prepare an offer for the elements required.

    The standard corrosion protection of the structures is performed by hot dip galvanizing for normal atmospheric

    conditions. Still it is also possible to deliver structures without corrosion protection or with additional protection

    (painted), and this is necessary to be clearly stated when placing your order.

    When taking over the structure, the client is delivered the building blueprints and documentation proving the qualityof the material, structure and corrosion protection of both the installed elements and of the structure as whole,

    according to the static calculation of the tower.

    6. ORDERING INFORMATION AND STRUCTURE

    TAKEOVER

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    37/44

    STEEL LATTICE TOWERS FOR 10, 20 AND 35 kV TRANSMISSION LINES

    35

    DETAILS OF THE CROSS-ARM TOP

    SUSPENSION TOWERS

    Standard suspension over the posttype insulator or shackles

    Standard suspension sets over hinges(delivery with note - suspension sets over hinges)

    PLATES FOR SINGLESUSPENSION

    (Delivery without notes)

    ADDITIONAL PLATES FORDOUBLE SUSPENSION

    (delivery with note- for double suspension)

    TENSION TOWERS

    Standard suspension over hinges(Delivery without notes)

    FOR ALL CROSS-ARMS

    When placing orders for cross-arms (for suspen-sion over V extension links or isolators, that isfor suspension equipment where the standardelements are not adequate) it is necessary to ad-ditionally state the suspension mode and type, i.e.the suspension equipment catalogue number

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    38/44

    DALEKOVOD - PROJEKT

    36

    The foundation part of the structure is placed within the foundation excavation, it is centred and fixed, and then the

    concrete is cast in the foundations. Further assembly is made after the concrete solidifies. The structure can be mounted

    element by element (one element at the time), in parts (sections) or in one piece (complete).

    Sections of the towers are composed of main legs of max. length 6m connected with diagonals, and the same section

    is used for towers of different heights without requiring additional works on the structure as such. In this way the

    storage (number of positions) and assembly of towers is simplified. It makes possible to very simply use them ondifferent locations in case the existing tower is to be disassembled, as also makes possible to use then for lower heights,

    that is the foundation section can be used for both equal and for higher towers.

    7. ASSEMBLING THE STRUCTURE

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    39/44

    STEEL LATTICE TOWERS FOR 10, 20 AND 35 kV TRANSMISSION LINES

    37

    SECTION

    1

    SECTION

    1

    SECTION

    2

    SECTION

    2

    SECTION

    3

    FOUNDATION

    SECTION

    FOUNDATION

    SECTION

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    40/44

    DALEKOVOD - PROJEKT

    38

    8. FOUNDATIONS

    The foundation dimensions are recommended for each type of tower, according to the nominal load and height of the

    tower in question. Foundations are calculated according to the Sulzberger method for several different characteristics

    of bearing, non-aggressive and stable soil.

    Soil characteristics are established according to the abovementioned Regulation for Overhead Power-lines obtainedby geo-mechanical tests used in designing transmission lines over many years of experience for:

    gravel and gravel-sand soils, sandstone, flysch, etc.

    free of groundwater, dop = 250 kN/m2

    with groundwater, dop = 200 kN/m2

    clay and clay-sand soilsfree of groundwater, dop = 150 kN/m2

    with groundwater, dop = 120 kN/m2

    for foundations on solid rock the strength capacity, dop > 500 kN/m2 the minimum dimensions areconditioned by the geometry of the foundation, tower structure and method used in making the foundations.

    The foundation is made for simple structure as a not-reinforced concrete block without shoe, into which is placed

    the foundation part of the structure. To insure simpler installation in cases of deep foundations, the construction of

    foundation extensions is proposed, in this case it is possible to use smaller profiles than the dimensions of tower main

    legs. It is required to use concrete, pressure strength class C20/25, that does not lose strength by ageing.

    By standard the foundation is made with crown d = 20 cm over the ground. If required (flood water, increased security

    height of the conductor, construction on inclined plateau, etc.) the structure is made with appropriate heightening of

    the foundations.

    For soils of lower/poorer characteristics and conditions, deviating from the defaulted ones, as also for different

    technology used (e.g. shallow foundations), the adequate foundations shall be recalculated. In this case it is alsonecessary to take into consideration the standard length of the foundation part of the structure (L) characteristic for

    each tower, or consult the manufacturer of the structure for possible manufacturing of customised foundation section

    (e.g. for anchoring screws).

    l => useful length of the foundation extension

    L => foundation part of the structure

    d 20 cm (as required)

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    41/44

    STEEL LATTICE TOWERS FOR 10, 20 AND 35 kV TRANSMISSION LINES

    39

    SOIL CHARACTERISTICS FOR THE RECOMMENDED FOUNDATION DIMENSIONS

    SOIL CLAY-SANDGRAVEL-SAND, FLYSCH,

    SANDSTONE, etc.ROCK

    GROUND WATERS NO YES NO YES NO

    min dop

    (kN/m2) 150 120 250 200 >500

    min (kN/m3) 18 9 18 9 19

    min Ct (kN/cm3) 0.07 0.04 0.11 0.06 0.17

    min b (degrees) 10 7 14 11 20

    min mb

    0.40 0.35 0.4 0.35 0.45

    ROCK LOOSE SOIL AND SOILS INGROUND WATERS

    EXCAVATION

    PERIMETER

    EXC

    AVATION

    PERIMETER

    EXC

    AVATION

    PERIMETER

    EXC

    AVATION

    PERIMETER

    EXC

    AVATION

    PERIMETER

    EXCAVATION

    PERIMETER

    EXCAVATION

    PERIMETER

    EXCAVATION

    PERIMETER

    ANGLE TENSION TOWER, KR - line route deviation angle

    END TOWER, Ka 90

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    42/44

    President of the Management Board: Davor urevi Project Designer: Branka Podobnik Collaborator: Tomislav StojeviDALEKOVOD-PROJEKT d.o.o. design, control, consulting and engineering 10000 Zagreb, Marijana avia 4

    e-mail: [email protected] Tel: +385 1 24 11 100 - Operator Fax: +385 1 24 52 381

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    43/44

  • 7/27/2019 Steel Lattice Towers for 10 20 and 35 Kv

    44/44

    www.dalekovod.com