steve spagna project geologist - marshall.edu 3/steve... · one corps, one regiment, one team rock...

56
One Corps, One Regiment, One Team Rock Cut Rock Cut - - Slope Slope Design and Construction Design and Construction Grundy Redevelopment Grundy Redevelopment Site E Site E Steve Spagna Project Geologist

Upload: phungtuyen

Post on 18-Feb-2019

215 views

Category:

Documents


0 download

TRANSCRIPT

One Corps, One Regiment, One Team

Rock CutRock Cut--Slope Slope Design and ConstructionDesign and ConstructionGrundy Redevelopment Grundy Redevelopment Site ESite E

Steve Spagna – Project Geologist

One Corps, One Regiment, One Team

• Redevelopment site• Area B Ringwall – including

levee construction and US 460 upgrade by VDOT

• Relocation of public facilities, including Norfolk Southern Railroad

• Total project cost - $100 M • Local sponsors - Town of

Grundy and VDOT

Grundy Local Protection ProjectGrundy Local Protection Project

Project Description

One Corps, One Regiment, One Team

Phases of Construction

Before After

Grundy Local Protection ProjectGrundy Local Protection Project

One Corps, One Regiment, One Team

Grundy Local Protection ProjectGrundy Local Protection Project

Grundy, VA

Project LocationHuntington District

One Corps, One Regiment, One Team

Grundy Local Protection ProjectGrundy Local Protection Project

Site E

N

Site Location

One Corps, One Regiment, One Team

Grundy Local Protection ProjectGrundy Local Protection Project

Flood of Record (100 year event) – April 1977- Devastated Town, causing deaths and millions in damages.

Section 202 of the Energy and Water Development Appropriations Act of 1981 provided specific authorization for the development of flood protection measures at Grundy.

Summary and Authorization

One Corps, One Regiment, One Team

Riverside Drive1977 Flood

Grundy Local Protection ProjectGrundy Local Protection Project

One Corps, One Regiment, One Team

1977 Flood

Grundy Local Protection ProjectGrundy Local Protection Project

One Corps, One Regiment, One Team

Flood Damages and Clean-up Efforts

Grundy Local Protection ProjectGrundy Local Protection Project

One Corps, One Regiment, One Team

PCAGrundy VDOT

Corps

Grundy Local Protection ProjectGrundy Local Protection Project

Tri-party Partnership

One Corps, One Regiment, One Team

Redevelopment Site E

Grundy Local Protection ProjectGrundy Local Protection Project

One Corps, One Regiment, One Team

Grundy Local Protection ProjectGrundy Local Protection Project

• 3 million CY Excavation

• Development of Wellmore Hollow Spoil Site

• Relocation of the Norfolk Southern Railroad

Redevelopment Site Main Project Features

One Corps, One Regiment, One Team

Grundy Local Protection ProjectGrundy Local Protection Project

Site E During Construction

Site E

Haul road

Wellmore Hollow

Grundy CBD

One Corps, One Regiment, One Team

Wellmore Hollow During Construction

Grundy Local Protection ProjectGrundy Local Protection Project

Haul Road Connecting Site E

One Corps, One Regiment, One Team

Grundy Local Protection ProjectGrundy Local Protection Project

Relocation of Norfolk Southern Railroad

Original Alignment

New Alignment

95m

One Corps, One Regiment, One Team

Cutslope Design

Grundy Local Protection ProjectGrundy Local Protection Project

One Corps, One Regiment, One Team

Grundy Local Protection ProjectGrundy Local Protection Project

Design Considerations

• Bedrock Characteristics

• Joint Analysis

• Rock Fall Hazards

• Desires of Cost Share Sponsors and Project Stakeholders

One Corps, One Regiment, One Team

Grundy Local Protection ProjectGrundy Local Protection Project

Bedrock Characteristics•Slope of the Excavated Bedrock

•Location and Width of Benches

•Effects of Differential Weathering

DESIGNED CUT SLOPE

One Corps, One Regiment, One Team

Grundy Local Protection ProjectGrundy Local Protection Project

Bedrock Characteristics cont…

• Bench Slope or Gradient

Geologic Profile

2+00 3+00 4+00 5+00 6+00 7+00 8+00300

380

360

340

320

460

440

420

400

300

380

360

340

320

460

440

420

400

Upper Shale Member

Interbedded Member

McClure Sandstone Member

Interbedded Sandstone Member

Lower Shale MemberLower Sandstone Member

One Corps, One Regiment, One Team

Grundy Local Protection ProjectGrundy Local Protection Project

Design Considerations

• Bedrock Characteristics

• Joint Analysis

• Rock Fall Hazards

• Cost Share and Stakeholder Partnerships

One Corps, One Regiment, One Team

Grundy Joint Analysis

• Planar• Wedge• Toppling

3 Anticipated Modes of Failure

• Joint measurements were obtained by measuring joint orientations in outcrops along the Norfolk Southern Railroad

Grundy Local Protection ProjectGrundy Local Protection Project

One Corps, One Regiment, One Team

Planar Failure Wedge Failure

• Modes of failure were determined by stereographic analysis utilizing software developed by Roc Science.

Modes of FailureGrundy Local Protection ProjectGrundy Local Protection Project

One Corps, One Regiment, One Team

Site E Structural Failure Prediction

Redevelopment Site – Grundy, VA

Area of potential wedge type failure

Area of potential planar type failure

Area of potential planar and toppling type failure

Grundy Local Protection ProjectGrundy Local Protection Project

One Corps, One Regiment, One Team

Grundy Local Protection ProjectGrundy Local Protection Project

Design Considerations

• Bedrock Characteristics

• Joint Analysis

• Rock Fall Hazards

• Cost Share and Stakeholder Partnerships

One Corps, One Regiment, One Team

Rock Fall Hazard Analysis – Site EGrundy Local Protection ProjectGrundy Local Protection Project

• Lateral migration was modeled using software developed by RocScience

• A 9.14m rock catchmentditch was designed at the base of the cut to prevent boulders from obstructing the NS railroad

One Corps, One Regiment, One Team

Rock Fall Hazard Analysis – Wellmore Hollow

• Model of Spoil Site Slope • Designed Catchment Area

Grundy Local Protection ProjectGrundy Local Protection Project

One Corps, One Regiment, One Team

Grundy Local Protection ProjectGrundy Local Protection Project

Design Considerations

• Bedrock Characteristics

• Joint Analysis

• Rock Fall Hazards

• Cost Share and Stakeholder Partnerships

One Corps, One Regiment, One Team

Construction Challenges

Grundy Local Protection ProjectGrundy Local Protection Project

One Corps, One Regiment, One Team

• March 2002 Landslide

• April 2002 Flyrock Incident

• Change Conditions

Grundy Local Protection ProjectGrundy Local Protection Project

Significant Events

One Corps, One Regiment, One Team

Grundy Local Protection ProjectGrundy Local Protection Project

March 2002 Landslide

0.41"0.07"1.72"0.86"0.44"Average

0.21"0.07"2.18"0.74"0.41"Davenport

0.49"0.12"2.02"0.78"0.42"Haysi

0.45"0.09"1.49"1.03"0.44"Big Rock

0.23"0.06"1.22"0.61"0.42"Pilgrim Knob

0.66"0.02"1.71"1.16"0.50"Bartlick

March 19-20March 18-19March 17-18March 16-17March 15-16Gage

Area Rain Gage Data

• Displaced approximately 150’ of NS railroad

• Toe of slide extended approximately 30’ into the LevisaFork River

One Corps, One Regiment, One Team

Grundy Local Protection ProjectGrundy Local Protection Project

Grundy, Virginia March 19, 2002

March 2002 Landslide

One Corps, One Regiment, One Team

Grundy Local Protection ProjectGrundy Local Protection Project

Contractor works to remove material. Trucks haul from both directions.

Approximate originaltrack alignment.

Toe of slide extending out into the Levisa Fork river

March 2002 Landslide

One Corps, One Regiment, One Team

Landslide Repair

◆ District staff worked with Norfolk Southern to remediate slide

◆ Failed materials excavated; Stone buttress constructed; track repaired

◆ Completed within a week

One Corps, One Regiment, One Team

• March 2002 Landslide

• April 2002 Flyrock Incident

• Change Conditions

Grundy Local Protection ProjectGrundy Local Protection Project

Significant Events

One Corps, One Regiment, One Team

Grundy Local Protection ProjectGrundy Local Protection Project

Grundy – Blast #367

Fly Rock Limits

Blast #367

Shot #367• Production Shot

• Row by row pattern

• 70 - 5” Blastholes

•Spacing and Burden – 9’

• Depth – 22’

• Pre-packaged ANFO

•Crushed Limestone stemming

One Corps, One Regiment, One Team

Grundy Local Protection ProjectGrundy Local Protection Project

April 2002 Flyrock Incident

One Corps, One Regiment, One Team

Grundy Local Protection ProjectGrundy Local Protection Project

April 2002 Flyrock Incident

One Corps, One Regiment, One Team

Grundy Local Protection ProjectGrundy Local Protection Project

April 2002 Flyrock Incident

One Corps, One Regiment, One Team

• Loading of blastholes• Location of blastholes relative to free face• Amount of explosives used• Placement of stemming

Possible Causes

Grundy Local Protection ProjectGrundy Local Protection Project

Interior - Downtown Law Office

One Corps, One Regiment, One Team

Corrective Actions

◆ District consulted with Dr. Calvin Konya◆ Developed Corrective Action Plans in

accordance with Dr. Konya◆ 100% government QA on every blast;

Consultant blasting specialist now on site for each blast

◆ Dr. Konya consulted as needed◆ Future work (upstream area) to be directed by

Konya

One Corps, One Regiment, One Team

• March 2002 Landslide

• April 2002 Flyrock Incident

• Change Conditions

Grundy Local Protection ProjectGrundy Local Protection Project

Significant Events

One Corps, One Regiment, One Team

8+52

6+25

5+50

Grundy Local Protection ProjectGrundy Local Protection Project

• 5+50 – 6+25 -Weathered with signs of planar instability

• 6+25 – 8+52 - Zone of highly weathered material

Change Conditions - Overview

One Corps, One Regiment, One Team

Grundy Local Protection ProjectGrundy Local Protection Project

• 7 angled air borings

• 7 angled core borings

• 4 vertical core borings

FY 02 and FY 03 Core Drilling

One Corps, One Regiment, One Team

• High angle joints in Lower Shale Unit (trending parallel to cutslope) causing planar failures

5+50 – 6+25

Grundy Local Protection ProjectGrundy Local Protection Project

• SDI testing (results > 95) indicates durable material

One Corps, One Regiment, One Team

Grundy Local Protection ProjectGrundy Local Protection Project6+25 – 8+52

Highly weathered brown shale from El. 333 to El. 353

One Corps, One Regiment, One Team

Design Options

• Revise Cutslope Design

• Develop Mechanical Stabilization Design

Grundy Local Protection ProjectGrundy Local Protection Project

One Corps, One Regiment, One Team

Revised Cutslope Alternative Perceived Problems

Grundy Local Protection ProjectGrundy Local Protection Project

• Large Estimated Volume (350,000 CM)

• CWL needs to be revised

• Real estate and NEPA documents need to be revised.

• More costly than mechanical stabilization

One Corps, One Regiment, One Team

Mechanical Stabilization AlternativePerceived Benefits

• Limited excavation

• Less expensive than laying slopes back

• Able to avoid problems with spoil site capacity, real estate, NEPA, and expanding CWL

• Initially supported by stakeholders

Grundy Local Protection ProjectGrundy Local Protection Project

One Corps, One Regiment, One Team

District Hires FMSM

Grundy Local Protection ProjectGrundy Local Protection Project

One Corps, One Regiment, One Team

Soil Nail Wall Design

RDZ Line

Original GroundPassive Rock Anchors

Design Features

• Internal and external drainage

• Encapsulated nails

• 6” thick shotcrete facing

Typical Section

Grundy Local Protection ProjectGrundy Local Protection Project

One Corps, One Regiment, One Team

Grundy Local Protection ProjectGrundy Local Protection Project

Problems with theMechanical Stabilization Design

• Project team concerned with design life and long-term maintenance

• Town of Grundy concerned with aesthetics

One Corps, One Regiment, One Team

• District and FMSM Develop Revised Cutslope Design

Grundy Local Protection ProjectGrundy Local Protection Project

• Congressman Boucher requests District develop the excavation alternative to full level of detail

Congressional Interest

One Corps, One Regiment, One Team

Grundy Local Protection ProjectGrundy Local Protection Project

Revised Cutslope Alternative Sta 6+25 – 8+52

Original Cut (77,600 CM)

Revised Cut (236,500 CM)

RDZ

One Corps, One Regiment, One Team

5+50 – 6+25

July 29, 2003

Grundy Local Protection ProjectGrundy Local Protection Project

One Corps, One Regiment, One Team

July 29, 2003

6+25 – 8+52 Grundy Local Protection ProjectGrundy Local Protection Project

One Corps, One Regiment, One Team

Grundy Local Protection ProjectGrundy Local Protection Project

Questions?