1 Stony Plain Regional Recreation Centre Conceptual Planning Welcome! You can provide comments by completing the feedback form and leaving it with us or talking with a team member. The panels and the comment form are also available on the Town of Stony Plain’s website ( www.stonyplain.com ). What’s this all about? The Town of Stony Plain has initiated the planning of a potential multi-plex recreation centre to serve the indoor recreation needs of the region. The Tri-Region Indoor Recreation Facility Strategy – 2017 (Tri-Plan) identified the top ranked facility needs as: » Leisure pool » Arena » Indoor adventure » Fitness / wellness » Fieldhouse / dry floor area The development of a new facility will require input from community partners. The Town is committed to an open and transparent engagement process. We welcome and thank you for your comments.

Upload: others

Post on 08-Jul-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Stony Plain Regional Recreation Centre Conceptual …...2019/03/15  · – 2017 (Tri-Plan) identified the top ranked facility needs as: » Leisure pool » Arena » Indoor adventure

1

Stony Plain Regional Recreation Centre Conceptual Planning

Welcome! • You can provide comments by completing the feedback form and leaving it with us or talking with a team member.

• The panels and the comment form are also available on the Town of Stony Plain’s website (www.stonyplain.com).

What’s this all about? • The Town of Stony Plain has initiated the planning of a potential multi-plex recreation centre to serve the indoor recreation needs of the region.

• The Tri-Region Indoor Recreation Facility Strategy – 2017 (Tri-Plan) identified the top ranked facility needs as:

» Leisure pool » Arena » Indoor adventure » Fitness / wellness » Fieldhouse / dry floor area

• The development of a new facility will require input from community partners. The Town is committed to an open and transparent engagement process.

• We welcome and thank you for your comments.

Page 2: Stony Plain Regional Recreation Centre Conceptual …...2019/03/15  · – 2017 (Tri-Plan) identified the top ranked facility needs as: » Leisure pool » Arena » Indoor adventure

2

Tri-Region Indoor Recreation Facility Strategy – 2017 (Tri-Plan)

Recommendations were the result of a thorough

program of research which included the following elements:

Plan and Policy Review

Plan

Trends Analysis

Population Analysis

Facility Inventory, Assessment, and

Utilization

Community Engagement

Telephone Survey

Workshops

Interviews

Pop-Ups

Online Activities

Conduct a feasibility study for a new

multiplex that includes a:Leisure Pool and

Lane PoolTwin

Arena

Indoor Adventure

Park

Fieldhouse, Fitness/ Wellness Space

Walking Track

Multipurpose Programmable

Space

One of the Strategic

Recommendations

• Included the Town of Stony Plain, City of Spruce Grove, and Parkland County • It guides decision making around the development and enhancement of indoor recreation facilities in the region for the next 10 years

• The plan followed the following process:

Page 3: Stony Plain Regional Recreation Centre Conceptual …...2019/03/15  · – 2017 (Tri-Plan) identified the top ranked facility needs as: » Leisure pool » Arena » Indoor adventure

3

Preliminary Facility Concept

1020

3040

NEWGYMNASIUM

NEW

AQUATICS

STORAGE

ADVE

NTUR

E PA

RK

FIELDHOUSE

SOCIAL SPACE

POOLADMIN

POOLCHANGEROOMS

NEWARENA

ARENA CHANGE ROOMS

MECHANICAL

ARENASERVICES

FUTUREARENA

EXPANSION

STORAGE

SOCIAL SPACE

COMM-UNITY

CHANGEROOMS

ADMIN

EXISTING

GLENN HALL

ARENA

NEW OUTDOOR RINK

ENTRY

ENTRY

STONY PLAIN RECREATION CENTREJANUARY 2019

MAIN FLOOR PLAN

Main Floor Plan

1020

3040

NEWGYMNASIUM

NEWFIELDHOUSE

NEW

AQUATICS

NEWARENA

FUTUREARENA

EXPANSION

EXISTING

GLENN HALL

ARENA

NEW OUTDOOR RINK

SOCIALSPACE

RUNNING TRACKSOCIALSPACE

MECH

.

STOR.

SPECTATOR VIEWING

SPEC

TATO

R VI

EWIN

G COMM

UNIT

YSP

ACE

MECHANICAL

WR

STONY PLAIN RECREATION CENTREJANUARY 2019

SECOND FLOOR PLAN

Second Floor Plan

Page 4: Stony Plain Regional Recreation Centre Conceptual …...2019/03/15  · – 2017 (Tri-Plan) identified the top ranked facility needs as: » Leisure pool » Arena » Indoor adventure

4

Preliminary Site Concept

• The reorganization of green space was required to correctly place the facility on the site. • Outdoor space enhancements have resulted. • Additional site improvements have been recognized as an opportunity.

Page 5: Stony Plain Regional Recreation Centre Conceptual …...2019/03/15  · – 2017 (Tri-Plan) identified the top ranked facility needs as: » Leisure pool » Arena » Indoor adventure

5

Facility Development Process

The graphic illustrates a general process that will guide the development of this potential recreation centre.

• It identifies points along the way at which the community will have input. • It also identifies decision points.

Preliminary Facility

Concept

Revised Facility

Concept

Feasibility Study

• Confirming facility program

• Preliminary operating and capital costs

Schematic Facility Design

Operation Construction Detailed Design

Business Planning

• More detailed operational planning

• Refinement of operating and capital costs• Funding model

We Are Here!

DecisionPoint

DecisionPoint

DecisionPoint

Public and Stakeholder

Input

Public and Stakeholder

Input

Public and Stakeholder

Input

Page 6: Stony Plain Regional Recreation Centre Conceptual …...2019/03/15  · – 2017 (Tri-Plan) identified the top ranked facility needs as: » Leisure pool » Arena » Indoor adventure

6

What do you think?

• While it is early in the facility planning process we want to get your thoughts.

• Please complete the feedback form to share your thoughts about:

» The preliminary facility concept, and

» The preliminary site concept.

• These information panels and the feedback form can be found on the Town of Stony Plain’s website (www.stonyplain.com).

» Please limit your feedback to one submission.

Thank-you for your comments!