storm water advisory panel presentation

38
Storm Water Advisory Panel Presentation Presentation July 26, 2012

Upload: others

Post on 25-Jan-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Storm Water Advisory Panel Presentation

Storm Water Advisory Panel

Presentation Presentation

July 26, 2012

Page 2: Storm Water Advisory Panel Presentation

Welcome and Introductions

David Buck, P.E., Public Works Director/City EngineerDavid Buck, P.E., Public Works Director/City Engineer

Mike Susong, P.E., Assistant City Engineer

Michael Massonne, DLZ Indiana, LLC

7/26/2012 2

Page 3: Storm Water Advisory Panel Presentation

Today’s Presentation

• Purpose of the advisory panel

• Water quality programs and background

• Define the stormwater program

• Current program activities and effort

• Schedule

7/26/2012 3

Page 4: Storm Water Advisory Panel Presentation

Purpose of the Advisory Panel

• Provide vital feedback on stormwater issues

• Represent the West Lafayette Stormwater

Program service areaProgram service area

• Supporting community education and

outreach initiatives of the stormwater

program

7/26/2012 4

Page 5: Storm Water Advisory Panel Presentation

Water Quality Programs and

Background

7/26/2012 5Waters of the United States

Page 6: Storm Water Advisory Panel Presentation

Water Quality Programs

• Include the City’s Sanitary and Stormwater Programs

o Stem from the National Pollutant Discharge Elimination

System (NPDES) ProgramSystem (NPDES) Program

o Includes NPDES permits for Sanitary and Stormwater

discharges

o Permits have similar characteristics with respect to

operating, managing and expanding the sewer systems

o Permitted systems include combined/separate sanitary

and separate storm

7/26/2012 6

Page 7: Storm Water Advisory Panel Presentation

Purpose of NPDES Program• Improve quality of our

waterways o Achieve cleaner, healthier

streams and rivers

o Efforts also beneficial to downstream communities

o Efforts also beneficial to downstream communities

• Reduce/eliminate Combined Sewer Overflows (CSOs)

• Improve stormwaterdrainage and water quality

• Comply with state and federal requirements

7/26/2012 7

Page 8: Storm Water Advisory Panel Presentation

West Lafayette and NPDES Permits

• The city holds separate distinct permits for

discharges from:

o The sanitary sewer systemo The sanitary sewer system

o The stormwater sewer system (MS4 – Municipal

Separate Storm Sewer System)

7/26/2012 8

Page 9: Storm Water Advisory Panel Presentation

The Two Systems• Sanitary

o Nine Minimum Controls

for the Combined Sewer

System (CSS)

• Stormwater (MS4)

o Six Minimum Control

Measures

o Operations and System (CSS)

o Long Term Control Plan

(LTCP)

o Operations and

maintenance

o Capital improvements

o Operations and

maintenance

o Capital improvements

7/26/2012 9

Page 10: Storm Water Advisory Panel Presentation

Sanitary System/Program

The Nine Minimum Controls (CSS):

1) Proper operation and regular maintenance

2) Maximum use of the collection system for storage2) Maximum use of the collection system for storage

3) Review and modification of pretreatment

requirements to minimize CSO (raw sewage

overflow) impacts

4) Maximization of flow to the POTW for treatment

5) Elimination of CSOs during dry weather

7/26/2012 10

Page 11: Storm Water Advisory Panel Presentation

Sanitary System/Program

The Nine Minimum Controls (cont.):

6) Control of solid and floatable materials in CSOs

7) Pollution prevention programs to reduce 7) Pollution prevention programs to reduce

contaminants in CSOs

8) Public notification of CSO occurrences and impacts

9) Monitoring to characterize CSOs and efficacy of CSO

controls

7/26/2012 11

Page 12: Storm Water Advisory Panel Presentation

Sanitary System/Program

• Services extend beyond city’s 11.75 square mile

boundary

• More than 7,000 connected users• More than 7,000 connected users

• Sewer system

o More than 100 miles of sanitary sewers

o 15 lift stations

7/26/2012 12

Page 13: Storm Water Advisory Panel Presentation

Sanitary System/Program Planned

Capital Projects

• New north service area lift station and main

extensionsextensions

• Soldiers Home lift station improvements

• WWTP capacity expansions

• Sheraton and Fairway Knolls lift station

replacements

• Nutrient removal and headworks improvements

7/26/2012 13

Page 14: Storm Water Advisory Panel Presentation

Stormwater System/Program

• The City is a Rule 13/MS4 co-permittee

• 327 IAC 15-13 (Rule 13) authorizes general

MS4 permitMS4 permit

• Permit meets NPDES Program requirements

• Second permit term (2008-2013)

• Regulates discharges from the separate storm

system

7/26/2012 14

Page 15: Storm Water Advisory Panel Presentation

Stormwater System/Program

• City is a co-permittee:

o West Lafayette is co-permittee with Tippecanoe County,

Lafayette, Purdue University, Battle Ground, Dayton and Lafayette, Purdue University, Battle Ground, Dayton and

Ivy Tech

• West Lafayette is responsible to fulfill requirements of

the Rule 13 (approved Stormwater Quality

Management Program)

• Non-compliance can result in fines ($2,500-25,000/day)

7/26/2012 15

Page 16: Storm Water Advisory Panel Presentation

Stormwater System/Program

• Six Minimum Control Measures

1) Public outreach and education

2) Public participation and involvement2) Public participation and involvement

3) Illicit discharge detection and elimination

4) Construction site run-off control

5) Post construction run-off control

6) Municipal operations good housekeeping

7/26/2012 16

Page 17: Storm Water Advisory Panel Presentation

Stormwater System/Program

• Compliance reporting

• Operations and maintenance of the system

• Identified capital needs/drainage • Identified capital needs/drainage

improvements

7/26/2012 17

Page 18: Storm Water Advisory Panel Presentation

Stormwater System/Program

• Extends to the municipal boundaries

• Includes all residents/property owners

• The infrastructure/assets include: • The infrastructure/assets include:

oMore than 25 miles of separate storm sewer pipe

o 4,330 manholes, catch basins, and inlets

7/26/2012 18

Page 19: Storm Water Advisory Panel Presentation

Capital Improvement Needs

• The Island – green infrastructure

• Downtown/Waterfront drainage improvements

• Happy Hollow Park erosion control

Blackbird Pond stormwater improvements• Blackbird Pond stormwater improvements

• Plaza Parks/Cumberland Park drainage improvements

• University Farms drainage improvements

• Celery Bog Nature Center drainage improvements

• Boes Ditch- Amberleigh Outlet

• Minor capital projects

7/26/2012 19

Page 20: Storm Water Advisory Panel Presentation

The Stormwater ProgramThe Stormwater Program

7/26/2012 20

Page 21: Storm Water Advisory Panel Presentation

The Stormwater Program

• Meeting NPDES Permit requirements

• Maintaining existing stormwater system

• Completing stormwater system/drainage • Completing stormwater system/drainage

improvements and upgrades

7/26/2012 21

Page 22: Storm Water Advisory Panel Presentation

NPDES Permit Requirements

• Six Minimum Control Measures

1) Public outreach and education

2) Public participation and involvement2) Public participation and involvement

3) Illicit discharge detection and elimination

4) Construction site run-off control

5) Post construction run-off control

6) Municipal operations good housekeeping

7/26/2012 22

Page 23: Storm Water Advisory Panel Presentation

Associated Regulatory Requirements

• Compliance reporting

• Operations and maintenance of the system

• Identified capital needs/drainage • Identified capital needs/drainage

improvements and possible retrofits for

water quality

7/26/2012 23

Page 24: Storm Water Advisory Panel Presentation

Operations and Maintenance

Activities

• Storm sewer repairs

• Catch basin repairs

• Storm sewer cleaning

• Manholes vacuum • Catch basin repairs

• Cleaning and inspection

of structural Best

Management Practices

(BMPs)

• Manholes vacuum

cleaned

• Sewer televising

• Street sweeping

7/26/2012 24

Page 25: Storm Water Advisory Panel Presentation

Capital Improvement Needs

• The Island – Green Infrastructure

• Downtown/Waterfront Drainage Improvements

• Happy Hollow Park Erosion Control

Blackbird Pond Stormwater Improvements• Blackbird Pond Stormwater Improvements

• Plaza Parks/Cumberland Park Drainage Improvements

• University Farms Drainage Improvements

• Celery Bog Nature Center Drainage Improvements

• Boes Ditch- Amberleigh Outlet

• Minor Capital Projects

7/26/2012 25

Page 26: Storm Water Advisory Panel Presentation

Program Boundaries and User Group

• Program Boundaries:

o Area inside the corporate boundary of West Lafayette

o Services can be extended by interlocal agreements o Services can be extended by interlocal agreements

and /or memorandums of understanding

• User Group:

o Permit identifies the general population as users

o Service area includes properties that directly impact,

discharge to and/or benefit from the stormwater

sewer infrastructure

7/26/2012 26

Page 27: Storm Water Advisory Panel Presentation

Stormwater Program Funding

• Currently funded from sanitary sewer fund

o Stormwater work competes for funding

o Burden placed on only sanitary users o Burden placed on only sanitary users

• City’s Goal: Establish a dedicated funding

source to meet stormwater program needs

7/26/2012 27

Page 28: Storm Water Advisory Panel Presentation

Stormwater Program Funding

• A dedicated stormwater user fee/service

chargeo Obligates money to stormwater services aloneo Obligates money to stormwater services alone

o Can provide for stormwater capital needs/projects

and regulatory compliance

o Allows for stormwater master planning

o Assures dedicated revenue source for users of the

service area

o Lessens demand on sanitary service fee

7/26/2012 28

Page 29: Storm Water Advisory Panel Presentation

Stormwater Funding AppliedCurrent funding needs:• Permit activities/requirements

o Minimum Control Measures/Reporting

• Operations and maintenanceo More than 25 miles of separate o More than 25 miles of separate

storm sewer pipeo 4,330 manholes, catch basins,

and inletso Additional responsibilities in the

combined area

• Associated capital project worko More than $500,000 expended in

Happy Hollow Park since 2008

7/26/2012 29DRAFT

Page 30: Storm Water Advisory Panel Presentation

Current Program Activities and Effort Current Program Activities and Effort

7/26/2012 30

Page 31: Storm Water Advisory Panel Presentation

Stormwater Funding Effort to Date

• Rate Analysis Considerations

o Residential users receive one base (user) fee per

month and an Equivalent Residential Unit (ERU) month and an Equivalent Residential Unit (ERU)

has been determined

o Non-residential users receive fee based on

measured impervious surface area divided by the

ERU

7/26/2012 31

Page 32: Storm Water Advisory Panel Presentation

Rate Analysis Considerations

• Billing unit is an ERU - 3,200 sq. ft.

impervious area

o City has measured and is updating impervious o City has measured and is updating impervious

area on non-residential parcels

o Residential parcels are assigned the base billing

unit – 1 ERU

o More than 14,000 billing units/ERUs system wide

approximately 7,000 parcels (estimated 2009)

7/26/2012 32

Page 33: Storm Water Advisory Panel Presentation

Stormwater Funding Effort to Date

• Stormwater Ordinance Considerations

o Reference state enabling code

o Include rate and assessment specificationso Include rate and assessment specifications

o Describe who and how

o Stormwater definitions

o Include special billing classes or credit information

if any

7/26/2012 33

Page 34: Storm Water Advisory Panel Presentation

Additional Considerations

Credit Program

• Will it be too costly?

• What should be

Will program and user fee

sunset?

• Capital work can be • What should be

included?

o Quantity and quality

o Green infrastructure

o Education

Capital work can be

completed

• Regulatory requirements

will not go away

• O & M needs to

continue

7/26/2012 34

Page 35: Storm Water Advisory Panel Presentation

Current Financial Considerations

• Estimated annual revenue need for stormwater

O&M and regulatory effort (Pollution Prevention

System Maintenance) exceeds $300,000 – based

on 2011 Annual Financial Management Report on 2011 Annual Financial Management Report

(Wastewater Utility)

• Estimated Stormwater Capital Program costs

exceed $13 million – based on 2009 estimates

7/26/2012 35

Page 36: Storm Water Advisory Panel Presentation

Current Effort• Completing capital project plan revisions and

updates

• Completing impervious area measurement

updatesupdates

• Completing user/fee rate analysis

• Ordinance review and preparation

• Continuing outreach and education

7/26/2012 36

Page 37: Storm Water Advisory Panel Presentation

Schedule• Complete program updates and rate analysis

August/September

• Complete outreach and education July

through December 2012through December 2012

• Ordinance introduction October/November

2012

• Begin billing January 2013

7/26/2012 37

Page 38: Storm Water Advisory Panel Presentation

Questions?Questions?