STP Risk STP Risk-Informed Approach to Informed Approach to NRC G i S f t I 191 NRC G i S f t I 191 NRC Generic Safety Issue 191 NRC Generic Safety Issue 191 (GSI (GSI-191) 191) Zahra Mohaghegh Ph D Ernie Kee Zahra Mohaghegh, Ph.D. Soteria Consultants Boston, MA www.soteriaconsultants.com [email protected] Ernie Kee South Texas Nuclear Operating Company Wadsworth, TX www.stpnoc.com [email protected] Introductory Presentation at at NRC Public Meeting February 9, 2012

Upload: others

Post on 27-Sep-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: STP RiskSTP Risk--Informed Approach to Informed Approach ... · February 9, 2012. Participating Teams from STP Ri kSTP Risk-If d P j Informed Project on Feb 9,,g ... 32 years of experience

STP RiskSTP Risk--Informed Approach to Informed Approach to NRC G i S f t I 191 NRC G i S f t I 191 NRC Generic Safety Issue 191 NRC Generic Safety Issue 191

(GSI(GSI--191)191)(( ))

Zahra Mohaghegh Ph DErnie Kee Zahra Mohaghegh, Ph.D.Soteria Consultants

Boston, MA www.soteriaconsultants.com

[email protected]

Ernie KeeSouth Texas Nuclear Operating Company

Wadsworth, TXwww.stpnoc.com

[email protected]

Introductory Presentation atat

NRC Public MeetingFebruary 9, 2012

Page 2: STP RiskSTP Risk--Informed Approach to Informed Approach ... · February 9, 2012. Participating Teams from STP Ri kSTP Risk-If d P j Informed Project on Feb 9,,g ... 32 years of experience

Participating Teams from Participating Teams from STP Ri kSTP Ri k I f d P j I f d P j STP RiskSTP Risk--Informed Project Informed Project on Feb 9, 2012 Public Meeting: on Feb 9, 2012 Public Meeting: , g, g

1. Containment Accident Stochastic Analysis (CASA )Team2. Corrosion/Head Loss Experimental (CHLE) Team 3. GSI-191 Analysis & Methodology Implementation (GAMI) Team4. Oversight Team5 STPNOC Team5. STPNOC Team

2

Page 3: STP RiskSTP Risk--Informed Approach to Informed Approach ... · February 9, 2012. Participating Teams from STP Ri kSTP Risk-If d P j Informed Project on Feb 9,,g ... 32 years of experience

Containment Accident Stochastic Analysis Containment Accident Stochastic Analysis (CASA) T (CASA) T (CASA) Team (CASA) Team

Bruce Letellier, Ph.D. in Nuclear Eng. Nuclear Reactor Safety and Risk Analysis at Los Alamos National LabNuclear Reactor Safety and Risk Analysis at Los Alamos National LabCASA lead for STP Risk-informed GSI-191 project10 years of experience in GSI-191

3

Page 4: STP RiskSTP Risk--Informed Approach to Informed Approach ... · February 9, 2012. Participating Teams from STP Ri kSTP Risk-If d P j Informed Project on Feb 9,,g ... 32 years of experience

Corrosion/Head Loss Experimental (CHLE) Corrosion/Head Loss Experimental (CHLE) T T

K H

Team Team

Kerry Howe, PE, Ph.D., BCEE.Associate Professor in the Civil Eng. Department at the University of New MexicoCHLE lead for STP Risk-informed GSI-191 project5 years of experience in GSI-191

Janet Leavitt, Ph.D. in Environmental Eng. Post-doc in the Civil Eng. Department at the University of New MexicoCHLE team member for STP Risk informed GSI 191CHLE team member for STP Risk-informed GSI-1915 years of experience in GSI-191

4

Page 5: STP RiskSTP Risk--Informed Approach to Informed Approach ... · February 9, 2012. Participating Teams from STP Ri kSTP Risk-If d P j Informed Project on Feb 9,,g ... 32 years of experience

GSIGSI--191 Analysis & Methodology 191 Analysis & Methodology Implementation (GAMI) Team Implementation (GAMI) Team

Ti S d

Implementation (GAMI) Team Implementation (GAMI) Team

Tim Sande, M.S. in Petroleum Eng.Engineering Supervisor at Alion Science & TechnologyGAMI lead for STP Risk-informed GSI-191 project8 years of experience in GSI-191

Gil Zigler Nuclear Eng Gil Zigler, Nuclear Eng. Senior Scientist/Engineer at Alion Science & TechnologyGAMI team member for STP Risk-informed GSI-19120 f GSI 19120 years of experience in GSI-191

5

Page 6: STP RiskSTP Risk--Informed Approach to Informed Approach ... · February 9, 2012. Participating Teams from STP Ri kSTP Risk-If d P j Informed Project on Feb 9,,g ... 32 years of experience

Oversight Team Oversight Team

Z h M h h h

gg

Zahra Mohaghegh, Ph.D. in Reliability Eng.Principal Research Scientist at Soteria ConsultantsOversight lead for STP Risk-informed GSI-191 project8 years of experience in Probabilistic Risk Assessment (PRA)

Seyed Reihani, Ph.D. in Mechanical Eng.Research Scientist at Soteria ConsultantsOversight team member for STP Risk-informed GSI-191 projectOversight team member for STP Risk informed GSI 191 project10 years of experience in catalytic combustion

6

Page 7: STP RiskSTP Risk--Informed Approach to Informed Approach ... · February 9, 2012. Participating Teams from STP Ri kSTP Risk-If d P j Informed Project on Feb 9,,g ... 32 years of experience

STPNOC Team STPNOC Team

Steve Blossom, Project Manager Project Manager at the South Texas Project Nuclear Operating CompanyProject Manager for STP Risk-informed GSI-191 project 32 years of experience in Project Management

Ernie Kee, Mechanical Eng.Supervisor, Risk-Informed Applications, at the South Texas Project Nuclear Operating Company STP Technical Leader for STP Risk-informed GSI-191 project14 years of experience in Probabilistic Risk Assessment (PRA) at a commercial nuclear power plant

7

Page 8: STP RiskSTP Risk--Informed Approach to Informed Approach ... · February 9, 2012. Participating Teams from STP Ri kSTP Risk-If d P j Informed Project on Feb 9,,g ... 32 years of experience

Main Goals of the RiskMain Goals of the Risk--Informed Project Informed Project

1. Through a risk-informed approach, establish a technical basis to i NRC l t l th f t i l t d t

jj

gain NRC approval to close the safety issues related to GSI-191 by the end of 2013

2. Exemption from certain requirement’s of 10 CRF 50.46 if the risk associated with the fibrous insulation in STPNOC’s containment is determined as non risk significant :

Decision-making is based on the difference in risk between a “perfect” design and the existing design

Safety issues having ∆CDF < 10-6/yr and ∆ LERF < 10-7/yr fall in Risk Region III (very small changes) as defined by Regulatory Guide 1.174

8

Page 9: STP RiskSTP Risk--Informed Approach to Informed Approach ... · February 9, 2012. Participating Teams from STP Ri kSTP Risk-If d P j Informed Project on Feb 9,,g ... 32 years of experience

S h ti R t ti S h ti R t ti Schematic Representation Schematic Representation of the Integrated Model, of the Integrated Model, Developed for the Developed for the RiskRisk--Informed GSIInformed GSI--191 191 Project Project

9

Page 10: STP RiskSTP Risk--Informed Approach to Informed Approach ... · February 9, 2012. Participating Teams from STP Ri kSTP Risk-If d P j Informed Project on Feb 9,,g ... 32 years of experience

PRA is located at the top level of system analysis.

This PRA has the typical Power ypPlant Fault Trees and Event Trees covering hardware failures and operators’ actions and so, has the typical PRA cut sets.

10

Page 11: STP RiskSTP Risk--Informed Approach to Informed Approach ... · February 9, 2012. Participating Teams from STP Ri kSTP Risk-If d P j Informed Project on Feb 9,,g ... 32 years of experience

CASA Grande provides estimates for the likelihood of three basic events of Fault Trees in PRAs.

Rather than relying solely on historical failure data for these three basic events, the risk-informed project develops the models (in CASA Grande) for the underlying chemical and

h i l h l di mechanical phenomena leading to the three basic events.

11

Page 12: STP RiskSTP Risk--Informed Approach to Informed Approach ... · February 9, 2012. Participating Teams from STP Ri kSTP Risk-If d P j Informed Project on Feb 9,,g ... 32 years of experience

The output of CASA Grande will give a more accurate estimate of the likelihood of these three basic events and can then be imported to events and can then be imported to Fault Trees of the plant-specific PRA in order to calculate CDF.

CASA Grande is instrumental in opening the black boxes of two important events in the scenarios of P Pl t PRA (i i l ti a Power Plant PRA (i.e. recirculation

and core blockage) by model-based estimations of the likelihood of their underlying basic events. y g

12

Page 13: STP RiskSTP Risk--Informed Approach to Informed Approach ... · February 9, 2012. Participating Teams from STP Ri kSTP Risk-If d P j Informed Project on Feb 9,,g ... 32 years of experience

The Risk-Informed GSI-191 project not only contributes toward the closure of the GSI-191 issues, but also makes a contribution toward also makes a contribution toward PRA research and applications.

This project improves the scientific incorporation of underlying physical failure mechanisms ( i.e. chemical and mechanical phenomena) into PRA, an important topic of interest in the PRA field.

13

Page 14: STP RiskSTP Risk--Informed Approach to Informed Approach ... · February 9, 2012. Participating Teams from STP Ri kSTP Risk-If d P j Informed Project on Feb 9,,g ... 32 years of experience

Focus of Today’s Meeting: Focus of Today’s Meeting: Chemical Effects Chemical Effects

Chemicals are hypothesized to ypaffect both the strainer debris bed head loss and the in-vessel debris bed head loss.

In the figure, the effect on the in-vessel debris bed head loss is shown as going through the strainer bypass path.

Boron precipitation is separate from the chemical reaction processes and their potential p pdebris bed blockage.

14

Page 15: STP RiskSTP Risk--Informed Approach to Informed Approach ... · February 9, 2012. Participating Teams from STP Ri kSTP Risk-If d P j Informed Project on Feb 9,,g ... 32 years of experience

Today’s AgendaToday’s AgendaToday s AgendaToday s Agenda1. As necessary, discuss STP Post-meeting Notes from January y, g J y

26-27 Chemical Effects Meeting

2 Methods for addressing each of the significant PIRT issues2. Methods for addressing each of the significant PIRT issues

3. Experimental apparatus configuration p pp g

4. High level alignment on strainer head loss methodology (use of NUREG/CR 6224 and CHLE experiments)(use of NUREG/CR 6224 and CHLE experiments)

15

Page 16: STP RiskSTP Risk--Informed Approach to Informed Approach ... · February 9, 2012. Participating Teams from STP Ri kSTP Risk-If d P j Informed Project on Feb 9,,g ... 32 years of experience

Plan for Plan for RiskRisk--Informed Informed Chemical Effects TestingChemical Effects Testing

Existing Knowledge Base on Chemical

30‐Day Integrated Chemical Effects Tests with Direct Head Loss 

MeasurementPrecipitate Calculator (Type Quantity and

on Chemical Effects

Benchtop Testing

(Type, Quantity, and Form)

Thermodynamic Modeling

Short Term IntegratedBenchtop Testing 

NUREG/CR‐6224 Head 

CASA Grande

Short‐Term Integrated Chemical Effects Tests with Direct Head Loss 

Measurement

/Loss Correlation

Head Loss Calculator (Strainer Head Loss due to Fiber, Particulate, and 

Precipitates)Plant‐Specific VerticalPlant‐Specific Vertical Loop and Tank Tests

16