STRATEGICCONTRACT MANAGEMENT
Jorn BertensCategory Manager
Van Oord Procurement
BEST PRACTISES
![Page 2: STRATEGIC CONTRACT MANAGEMENT BEST … 2017... · - Interim ProcurementManager atActa Marine ... 0318 HAM 318 Hopper AKR MNY Wartsila + PON Power ABB BSL IHC Systems MSA Marlink](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ad404007f8b9a48398bd1fd/html5/thumbnails/2.jpg)
“Strategic Contract Management”
2
Index
Best Practises
Contract Management
Strategic Partnerships
Van Oord
Workshop
![Page 3: STRATEGIC CONTRACT MANAGEMENT BEST … 2017... · - Interim ProcurementManager atActa Marine ... 0318 HAM 318 Hopper AKR MNY Wartsila + PON Power ABB BSL IHC Systems MSA Marlink](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ad404007f8b9a48398bd1fd/html5/thumbnails/3.jpg)
3
A 20 year career in Van Oord in various positions
- Started as Technical Superintendent- Technical manager stationed in various locations worldwide.- Project manager Complex ship repairs, modifications and new buildings- Plant manager, technical, budget, ISM responsible for a part of the Van Oord Fleet and it’s crew- Currently in duo function
- Category Manager strategic commercial responsible for procurement Van Oord Fleet- Interim Procurement Manager at Acta Marine
Procurement Worldwide in various fields
![Page 4: STRATEGIC CONTRACT MANAGEMENT BEST … 2017... · - Interim ProcurementManager atActa Marine ... 0318 HAM 318 Hopper AKR MNY Wartsila + PON Power ABB BSL IHC Systems MSA Marlink](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ad404007f8b9a48398bd1fd/html5/thumbnails/4.jpg)
Presenting: Van Oord
4
Movie Vimeo
Maasvlakte 2
Gemini windpark
Palm Island - Dubai
2nd Suez channel
![Page 5: STRATEGIC CONTRACT MANAGEMENT BEST … 2017... · - Interim ProcurementManager atActa Marine ... 0318 HAM 318 Hopper AKR MNY Wartsila + PON Power ABB BSL IHC Systems MSA Marlink](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ad404007f8b9a48398bd1fd/html5/thumbnails/5.jpg)
W
Stelling 1 : Wie heeft er kennis van Strategic Contract Management?
NEE JA
5
![Page 6: STRATEGIC CONTRACT MANAGEMENT BEST … 2017... · - Interim ProcurementManager atActa Marine ... 0318 HAM 318 Hopper AKR MNY Wartsila + PON Power ABB BSL IHC Systems MSA Marlink](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ad404007f8b9a48398bd1fd/html5/thumbnails/6.jpg)
W
Stelling 2 : Wordt Strategic Contract Management toegepast binnen jou organisatie?
NEE JA
6
![Page 7: STRATEGIC CONTRACT MANAGEMENT BEST … 2017... · - Interim ProcurementManager atActa Marine ... 0318 HAM 318 Hopper AKR MNY Wartsila + PON Power ABB BSL IHC Systems MSA Marlink](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ad404007f8b9a48398bd1fd/html5/thumbnails/7.jpg)
Procurement Organization
ProjectProcurement
All project relatedprocurements bymeans ofSubcontracts,Project supplies,CAPEX and hiremain equipment
Staff Services
All NPR (Non-product relatedpurchase such
As staffing andrecruitment andstaff support(travel, lease/carhire, IT,accommodation
Materials &Related Services
All vessel relatedprocurement ofparts & services(ship materials,consumables, wear& tear, MRO) andfuel
Transport &Handling
All transport andMobilisation &Demobilisation,including shippingagents andequipment hire (land& marine)
OWPProcurement
All project relatedprocurements bymeans ofSubcontracts,Project supplies,hire mainequipment
![Page 8: STRATEGIC CONTRACT MANAGEMENT BEST … 2017... · - Interim ProcurementManager atActa Marine ... 0318 HAM 318 Hopper AKR MNY Wartsila + PON Power ABB BSL IHC Systems MSA Marlink](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ad404007f8b9a48398bd1fd/html5/thumbnails/8.jpg)
Ship Management Department total Average annual OPEX Spend
8
Annual average spend on repairs & modifications10% of total turnover
Fuel 50%
YARDS 10%
W&T 7%
diesel drives (engines / turbo's) 8%
ER Aux systems 7%
Electrical 7%
Consumables 5%
Hydraulic 2%
Cranes 1%
Winches/gearboxes 1%
Engineering 1%
Lubricants 1%
FOCUS ON VESSEL UPTIMERELATED CATEGORIES
![Page 9: STRATEGIC CONTRACT MANAGEMENT BEST … 2017... · - Interim ProcurementManager atActa Marine ... 0318 HAM 318 Hopper AKR MNY Wartsila + PON Power ABB BSL IHC Systems MSA Marlink](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ad404007f8b9a48398bd1fd/html5/thumbnails/9.jpg)
Transactional
Individual
De-centralized
approach
Levelof
Partnership
Parts & Services
ExclusiveContracts
- Centralize -
Present Future
Partnership
Dynamic Maintenance
Agreements
- StrategicPartnership
- Work together- In house teams- Understanding
each otherbusiness
- Phasing in Smart technology- Optimize Total life cycle costs
Past
Future of Marine maintenance – Strategic Partnership
Jorn BertensCategoryManager Procurement
MRO & Maintenance services
![Page 10: STRATEGIC CONTRACT MANAGEMENT BEST … 2017... · - Interim ProcurementManager atActa Marine ... 0318 HAM 318 Hopper AKR MNY Wartsila + PON Power ABB BSL IHC Systems MSA Marlink](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ad404007f8b9a48398bd1fd/html5/thumbnails/10.jpg)
Objectives & Challenges
• Improve on Uptime / Technical Performance• Optimize overhaul planning• Reduction of Energy consumption and a cut in CO2 / SOx emissions• Future availability of Technical personnel• Focus on total cost of ownership• Stock optimization
![Page 11: STRATEGIC CONTRACT MANAGEMENT BEST … 2017... · - Interim ProcurementManager atActa Marine ... 0318 HAM 318 Hopper AKR MNY Wartsila + PON Power ABB BSL IHC Systems MSA Marlink](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ad404007f8b9a48398bd1fd/html5/thumbnails/11.jpg)
Requires a strategic approach
11
![Page 12: STRATEGIC CONTRACT MANAGEMENT BEST … 2017... · - Interim ProcurementManager atActa Marine ... 0318 HAM 318 Hopper AKR MNY Wartsila + PON Power ABB BSL IHC Systems MSA Marlink](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ad404007f8b9a48398bd1fd/html5/thumbnails/12.jpg)
Decentralized approach results infragmented Supplier Life Cycle involvement
CAPEXNew Building
WA
RR
AN
TY
OPEX
Supplier involvement in life cycle
250 Suppliers 750 Suppliers
![Page 13: STRATEGIC CONTRACT MANAGEMENT BEST … 2017... · - Interim ProcurementManager atActa Marine ... 0318 HAM 318 Hopper AKR MNY Wartsila + PON Power ABB BSL IHC Systems MSA Marlink](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ad404007f8b9a48398bd1fd/html5/thumbnails/13.jpg)
Stelling 3 : Na CAPEX zijn dezelfde Key leveranciers voorminimaal 90% betrokken in het gehele OPEX proces?
NEE JA
![Page 14: STRATEGIC CONTRACT MANAGEMENT BEST … 2017... · - Interim ProcurementManager atActa Marine ... 0318 HAM 318 Hopper AKR MNY Wartsila + PON Power ABB BSL IHC Systems MSA Marlink](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ad404007f8b9a48398bd1fd/html5/thumbnails/14.jpg)
Solutions to achieve objectives
• Strategic Partners with exclusive contracts• Centralize, simplified and uniform way of working• Dedicated [in house] supplier teams in place• Clear & direct Communication Lines (who does which installation)• Joined planning & optimized process• Upstream supply chain & operational purchase
Work togetherUnderstanding each other business
Strategic Partnerships with long term view
![Page 15: STRATEGIC CONTRACT MANAGEMENT BEST … 2017... · - Interim ProcurementManager atActa Marine ... 0318 HAM 318 Hopper AKR MNY Wartsila + PON Power ABB BSL IHC Systems MSA Marlink](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ad404007f8b9a48398bd1fd/html5/thumbnails/15.jpg)
• Optimized total cost of ownership• Shared Ownership with Subcontractor (Long Term Relation)• Reduction on Energy consumption• and CO2 / SOx emissions• Safety improvement and planning ahead
Expected future benefits
• Optimized total cost of ownership• Shared Ownership with Subcontractor (Long Term Relation)• Reduction on Energy consumption and CO2 / SOx emissions• Safety improvement and planning ahead
Joined effort with strategic partnersto optimize Total Cost of Ownership
![Page 16: STRATEGIC CONTRACT MANAGEMENT BEST … 2017... · - Interim ProcurementManager atActa Marine ... 0318 HAM 318 Hopper AKR MNY Wartsila + PON Power ABB BSL IHC Systems MSA Marlink](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ad404007f8b9a48398bd1fd/html5/thumbnails/16.jpg)
Obtain life cycle focus
16
A CHANGEON
BOTH SIDESCAPEXShip
Management
Procurement
NewSales
Service
Parts Sales
Logistics
LIFE CYCLE FOCUS
![Page 17: STRATEGIC CONTRACT MANAGEMENT BEST … 2017... · - Interim ProcurementManager atActa Marine ... 0318 HAM 318 Hopper AKR MNY Wartsila + PON Power ABB BSL IHC Systems MSA Marlink](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ad404007f8b9a48398bd1fd/html5/thumbnails/17.jpg)
Scope - Entire Fleet for maintenance & repair, upgrades and Modifications
All Parts & Services per system via dedicatedStrategic Partner
![Page 18: STRATEGIC CONTRACT MANAGEMENT BEST … 2017... · - Interim ProcurementManager atActa Marine ... 0318 HAM 318 Hopper AKR MNY Wartsila + PON Power ABB BSL IHC Systems MSA Marlink](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ad404007f8b9a48398bd1fd/html5/thumbnails/18.jpg)
Electrical System - Parts & Services
E-Engineering
Frequencydrives
Panels
E- Parts /Components
Powercontrol
Troubleshooting24/7/365
E-motors&generators
All parts & services via Electrical strategic Partner
E-Manpower
AlarmSystems
Cables
“Electrical System” shall means the entire main Electrical system installed on board and dedicated to each Vessel, including but not
limited to main components such as Alarm systems, e-motors, generators, transformers, frequency drives,
distribution panels, switchboards, starter boxes, power control, lighting, cables. Including electrical section of
following OEM specific system such as air handling panel(s), desks wheelhouse, Boilers & Heating system, battery
chargers, converters, ups, navigation lighting, searchlights, window wiper systems, day signal lights, central aerial
system, cctv system, watch alarm, signal sounders, close-in/hospital/intruder alarms, telephone system, sound-
powered telephone, talk-back pa system, tachograph, shaft rpm indication, telegraph system, air whistle, tracing,
watertight doors, power management system, load sharing system, shaft earthing system and entertainment
system. DP system integration/installation works
Excluding the PLC & SCADA System, VODAS System, umbilical and ROV
Following components are excluded but the electrical system to connect the components are included in
"Electrical System" : Bridge & Nautical equipment, velocity meters, radio active sources, and following OEM
specific standalone systems such as; control panel main engine(s), control panel aux engine(s), control panel EM-
Harbour engine, steering gear system, deck machinery (crane/winches), bow thruster installation, control pitch
propeller(s), thermal oil installation, boiler-burner(s), provision freeze/cooling system, fresh water generator,
anti-fouling system, sewage/vacuum system, separator(s), watertight door systems, rudder angle indicators,
steering control, self unloading belt systems.
ElectricalStrategic Partner
Standard Electrical Maker list in place
![Page 19: STRATEGIC CONTRACT MANAGEMENT BEST … 2017... · - Interim ProcurementManager atActa Marine ... 0318 HAM 318 Hopper AKR MNY Wartsila + PON Power ABB BSL IHC Systems MSA Marlink](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ad404007f8b9a48398bd1fd/html5/thumbnails/19.jpg)
Idem Approach for:
All parts & services via Electrical strategic Partner
![Page 20: STRATEGIC CONTRACT MANAGEMENT BEST … 2017... · - Interim ProcurementManager atActa Marine ... 0318 HAM 318 Hopper AKR MNY Wartsila + PON Power ABB BSL IHC Systems MSA Marlink](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ad404007f8b9a48398bd1fd/html5/thumbnails/20.jpg)
All parts & services for system ordered via onededicated Subcontractor
Upfront planning discussed regular with dedicatedSubcontractor (look ahead) + Early involvementmodifications & major repairs
During local repairs: subcontractors & suppliesarranged by/via dedicated Subcontractor
Fixed and agreed rates, with incentive to planahead as for planned services 10% reduction inplace
For services > EUR 50k Open book calculationmethod in place
Standard evaluation form and lessons learnedshared on various levels
Working principles [Practical]
20
![Page 21: STRATEGIC CONTRACT MANAGEMENT BEST … 2017... · - Interim ProcurementManager atActa Marine ... 0318 HAM 318 Hopper AKR MNY Wartsila + PON Power ABB BSL IHC Systems MSA Marlink](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ad404007f8b9a48398bd1fd/html5/thumbnails/21.jpg)
CooperationSTRATEGIC PARTNERSHIP VESSELS
![Page 22: STRATEGIC CONTRACT MANAGEMENT BEST … 2017... · - Interim ProcurementManager atActa Marine ... 0318 HAM 318 Hopper AKR MNY Wartsila + PON Power ABB BSL IHC Systems MSA Marlink](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ad404007f8b9a48398bd1fd/html5/thumbnails/22.jpg)
22
Strategic Partnership
PRODUCT AUTOMATION
DP
COMMUNICATION
BRIDGE EQUIPMENT
ENGINEERING
W&T Cranes
ELECTRICAL
CYLINDERS
HYDRAULICS
DIESEL
ROV
SHIPYARD(S)
Supplier reduction from1000 to 20
![Page 23: STRATEGIC CONTRACT MANAGEMENT BEST … 2017... · - Interim ProcurementManager atActa Marine ... 0318 HAM 318 Hopper AKR MNY Wartsila + PON Power ABB BSL IHC Systems MSA Marlink](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ad404007f8b9a48398bd1fd/html5/thumbnails/23.jpg)
Stelling 4 : Wie denkt het ook met 10% van de leveranciers te kunnen doen?
NEE JA
![Page 24: STRATEGIC CONTRACT MANAGEMENT BEST … 2017... · - Interim ProcurementManager atActa Marine ... 0318 HAM 318 Hopper AKR MNY Wartsila + PON Power ABB BSL IHC Systems MSA Marlink](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ad404007f8b9a48398bd1fd/html5/thumbnails/24.jpg)
Strategic partnership per vessel
No Vessel Type Plant Senior Diesel Turbo Electr ical Process control Pr oductionCommunicationBridge DP system Hydraulics Hydr aulic
Manager Purchaser Engines Charger s (PLC- Scada) Automation V-Sat Equipm ent Kongsberg cylinder s
FA - in place FA - in placeFA - in place FA - in place FA - in placeFA - in placeFA - in place FA - in place FA - in place FA - in place
Large Tra i li ng Suction Hopper Dredgers x z
0318 HAM 318 Hopper AKR MNY Wartsil a + PON Power ABB BSL IHC Systems MSA Marl i nk Al phatron DP/DT 0 Hytop IHC Vremac
0325 Utrecht Hopper AKR MNY Wartsi l a ABB BSL IHC Systems MSA Marl i nk Al phatron DP/DT 0 BR Evergr een
0326 Rotterdam Hopper AKR MNY Wartsil a + PON Power ABB BSL IHC Systems MSA Marl i nk Al phatron na BR Evergr een
0328 Vol vox Terr anova Hopper AKR MNY Wartsil a + PON Power ABB BSL BSL MSA Marl i nk Al phatron na BR Evergr een
0340 Vox Máxima Hopper AKR MNY MAN MAN BSL IHC Systems MSA Marl i nk Al phatron DP/DT 1 Hytop IHC Vremac
Tra i li ng Suction Hopper Dredgers x z
0310 HAM 310 Hopper PBY PLB MAK ABB vd Leun MSA MSA Marl i nk Al phatron DP/DT 1 Hycom Hycom
0311 HAM 311 Hopper PZS TCW Wartsi la + Cummi ns ABB BSL IHC Systems MSA Marl i nk Al phatron na Hycom Hycom
0312 HAM 312 Hopper AFE TCW Wartsil a + PON Power ABB BSL IHC systems MSA Marl i nk Al phatron na Hycom Hycom
0315 Geopotes 15 Hopper PBY PLB Wartsil a + PON Power ABB BSL MSA MSA Marl i nk Al phatron na BR Evergr een
0316 HAM 316 Hopper PBY PLB Wartsi la + Cummi ns ABB BSL JB Systems MSA Marl i nk Al phatron na Hycom Hycom
0317 HAM 317 Hopper PBY PLB Wartsi la + Cummi ns ABB BSL IHC Systems MSA Marl i nk Al phatron na Hycom Hycom
0324 Lel ystad Hopper PBY PLB Wartsil a + PON Power ABB BSL JB Systems MSA Marl i nk Al phatron na BR Evergr een
0329 Vol vox Asia Hopper AKR MNY MAN MAN BSL STN or IHC Systems MSA Marl i nk Al phatron na Hycom Hycom
0332 Vol vox Del ta Hopper AFE MNY Wartsil a + PON Power ABB BSL na MSA Marl i nk Opti ona l na Hycom Hycom
0334 Vol vox Ol ympia Hopper PBY PLB Wartsil a + PON Power ABB BSL JB Systems MSA Marl i nk Al phatron na Hycom Hycom
0335 Vol vox Ata l anta Hopper PBY TCW Wartsil a + PON Power ABB BSL JB Systems MSA Marl i nk Al phatron na Hycom Hycom
0336 Dravo Costa Dorada Hopper AFE TCW Wartsil a + PON Power ABB MSA na MSA KVH Opti ona l na Hycom Hycom
0339 Vol vox Angl i a Hopper AFE TCW PON Power na Lokaal na MSA na Opti ona l na Hycom Hycom
0393 Pel i can Hopper AFE TCW Wartsil a + PON Power ABB Lokaal na MSA na Opti ona l na Hycom Hycom
0341 Vox Amali a Hopper MNY MAN MAN Ingeteam or BSL Alewi jnse MSA Marl i nk Al patron Hycom Hycom
0342 Vox Al exi a Hopper MNY MAN MAN Ingeteam or BSL Alewi jnse MSA Marl i nk Al patron Hycom Hycom
0343 Contender Hopper AFE TCW MAK + PON Power Strago Imotec Al phatron na Hycom Hycom
Sel f propel l ed Cutter Sucti on dredger s x z
0240 Athena Cutter , self pr op. HDE UKO Wartsil a + PON Power ABB BSL IHC Systems MSA Marl i nk Al phatron na Hytop IHC Vremac
0241 Ar temis Cutter , self pr op. HDE UKO Wartsil a + PON Power ABB BSL IHC Systems MSA Marl i nk Al phatron na Hytop IHC Vremac
Cutter Sucti on dr edgers / Boosters x
0218 Ham 218 cutter dredger HDE UKO Wartsi l a ABB vd Leun na MSA KVH Al phatron na BR Evergr een
0219 Ham 219 cutter dredger PZS TCW Wartsi l a ABB vd Leun na MSA KVH Al phatron na PMR Evergr een
0221 Noordzee cutter dredger PZS TCW Wartsil a + PON Power ABB MSA MSA MSA KVH Al phatron na PMR Evergr een
0224 Cal abar Ri ver Cutter AFE TCW PON Power na vd Leun na na na Opti ona l na PMR Evergr een
0236 Castor cutter dredger HDE UKO Wartsi l a ABB vd Leun na MSA KVH Al phatron na BR Evergr een
STRATEGIC MATCH PER VESSEL,FULL LIST ON INTRANET
![Page 25: STRATEGIC CONTRACT MANAGEMENT BEST … 2017... · - Interim ProcurementManager atActa Marine ... 0318 HAM 318 Hopper AKR MNY Wartsila + PON Power ABB BSL IHC Systems MSA Marlink](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ad404007f8b9a48398bd1fd/html5/thumbnails/25.jpg)
Account teams
DEDICATED ACCOUNT TEAMS & CONTACT DETAILS
![Page 26: STRATEGIC CONTRACT MANAGEMENT BEST … 2017... · - Interim ProcurementManager atActa Marine ... 0318 HAM 318 Hopper AKR MNY Wartsila + PON Power ABB BSL IHC Systems MSA Marlink](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ad404007f8b9a48398bd1fd/html5/thumbnails/26.jpg)
WITH STRATEGIC PARTNERS IN PLACE : STARTINSPECTIONS & PREPARATIONS WELL IN ADVANCE
SHIPYARD(S)
Sample Nordnes
![Page 27: STRATEGIC CONTRACT MANAGEMENT BEST … 2017... · - Interim ProcurementManager atActa Marine ... 0318 HAM 318 Hopper AKR MNY Wartsila + PON Power ABB BSL IHC Systems MSA Marlink](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ad404007f8b9a48398bd1fd/html5/thumbnails/27.jpg)
27
Meetings:
In house Service coordinator
Budget Meeting with Plant Manager
Meeting with Technical Superintendent – Repair/Modification specific
Kick off meeting on board
Evaluation of Service form
Senior contract meeting
Operational Purchase meetings
Data Management / Inventory Meetings
Meeting structures
![Page 28: STRATEGIC CONTRACT MANAGEMENT BEST … 2017... · - Interim ProcurementManager atActa Marine ... 0318 HAM 318 Hopper AKR MNY Wartsila + PON Power ABB BSL IHC Systems MSA Marlink](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ad404007f8b9a48398bd1fd/html5/thumbnails/28.jpg)
Optimize:Process, Learning curve and Partnership
“LIVE”FRAMEWORKAGREEMENTS
OPERATIONALPROCESS
PERFORMANCEMEASURMENT
IMPLEMENTIMPROVEMENTS
EvaluationForms
Meetings
Work Preparation
Pro-Active look ahead
Performance sheet
Lessons learned tracksheet
Adjust work methods
Obtain life cycle focus
Strategic Partnership Process optimization
Scoping & open book calculations
![Page 29: STRATEGIC CONTRACT MANAGEMENT BEST … 2017... · - Interim ProcurementManager atActa Marine ... 0318 HAM 318 Hopper AKR MNY Wartsila + PON Power ABB BSL IHC Systems MSA Marlink](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ad404007f8b9a48398bd1fd/html5/thumbnails/29.jpg)
Centralized tool for all strategic partners
2 Way Performance Sheet per Strategic Partner
Process & Meetings
Supply chain process
Service evaluation
Safety
Process improvementsVarious actions
Process optimalization
Warranty matters
Up to date performancemeasurement focussedon optimizing processes
![Page 30: STRATEGIC CONTRACT MANAGEMENT BEST … 2017... · - Interim ProcurementManager atActa Marine ... 0318 HAM 318 Hopper AKR MNY Wartsila + PON Power ABB BSL IHC Systems MSA Marlink](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ad404007f8b9a48398bd1fd/html5/thumbnails/30.jpg)
30
![Page 31: STRATEGIC CONTRACT MANAGEMENT BEST … 2017... · - Interim ProcurementManager atActa Marine ... 0318 HAM 318 Hopper AKR MNY Wartsila + PON Power ABB BSL IHC Systems MSA Marlink](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ad404007f8b9a48398bd1fd/html5/thumbnails/31.jpg)
31
Stelling 5 : Is de interne Business bij contract management gesprekkenmet de leveranciers aanwezig?
NEE JA
![Page 32: STRATEGIC CONTRACT MANAGEMENT BEST … 2017... · - Interim ProcurementManager atActa Marine ... 0318 HAM 318 Hopper AKR MNY Wartsila + PON Power ABB BSL IHC Systems MSA Marlink](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ad404007f8b9a48398bd1fd/html5/thumbnails/32.jpg)
Alignment with internal business
32
Senior contract meeting - Strategic PartnershipsAttendancy Schedule Van Oord
Vodas Bridge E. DP ROV
Supplier Warts ila ABB MAN MAK PON Power Cummins BSL vd Leun MSA Alewijnse IHC Sys BSL JB Sys MSA MSA Marlink KVH Alphatron Kongsberg Seatools
2017
1 6 maart-
1 6 juni-14
sept-15 dec
17 jan-
19 sept15 juni jun
22 jun-7
dec
7 mrt-10
okt
14 feb-
9 mei-
7 sept-4 dec
14 mrt-
12 sept
feb-
augmei jun mei april april april
Occurance [per ye a r] 4x 2x 1x 1x 2x 2x 4x 2x 2x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x
Wi l l ia m Le ms x x
Jorn Bertens x x x x x x x x x x x x x x x x x x x x
Fa ri da Saba r x x x x x x x x x x x x x x x x x x x x
Roe l a nd va n Schi e x B B B x B x B B B B x x BMari no Noppe ne y x x x x x
Pa ul Lubbers x x
John de G root x
Ugur Koce r x
Stefa n Ha ns um
Ca rl o Soll e ve l d
Da a n Ba l jet x x x x x x x x x x x x x x
Maa rten Loma n
Andre Kre e mer x x x x B
Maa rten Sa nde rs x x x
Pe te r Bijke rk B
Marco Burg B x xMichie l vd Knaa p x B x x
Di e deri k va n Ha lse ma B x x
Marti n Vi sse r x x x x x x x
Arja n Polde rva art x x x x
Michel Borst x
Ale x va n Wij kRog ie r Ge le i jn
Michae l Fla nderi jn x x
Diesel Engines Electrical Proces Control Comm. Vsat
![Page 33: STRATEGIC CONTRACT MANAGEMENT BEST … 2017... · - Interim ProcurementManager atActa Marine ... 0318 HAM 318 Hopper AKR MNY Wartsila + PON Power ABB BSL IHC Systems MSA Marlink](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ad404007f8b9a48398bd1fd/html5/thumbnails/33.jpg)
33
Intranet Agreements & services rates
https://vanoord01.sharepoint.com/Organisation/Staff/Procurement/Pages/MRO-Maintenance-services.aspx
![Page 34: STRATEGIC CONTRACT MANAGEMENT BEST … 2017... · - Interim ProcurementManager atActa Marine ... 0318 HAM 318 Hopper AKR MNY Wartsila + PON Power ABB BSL IHC Systems MSA Marlink](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ad404007f8b9a48398bd1fd/html5/thumbnails/34.jpg)
Strategic Contract management
34
The Starting PointIs about managing two way relationship with keeping in viewall stakeholders and total cost of ownership (TCO)
Playing field at 3 levels: Operational, Tactical and Strategic
Acquisition Parts and/or services.
Optimizing specifications, investing in the front
Innovation
Open book & trust
Optimizing Process cost and supply Chain cost
Optimizing Lifecycle costs
Reduction of failure costs
Risk mitigation (terms & conditions)
Two way Maximizing profits
Establish long term relationship
Joint search for Sustainability
![Page 35: STRATEGIC CONTRACT MANAGEMENT BEST … 2017... · - Interim ProcurementManager atActa Marine ... 0318 HAM 318 Hopper AKR MNY Wartsila + PON Power ABB BSL IHC Systems MSA Marlink](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ad404007f8b9a48398bd1fd/html5/thumbnails/35.jpg)
Strategic Partnership Vessels
- Central Kick off meeting 27 Oct -
SMD - Procurement & Suppliers
Team work
![Page 36: STRATEGIC CONTRACT MANAGEMENT BEST … 2017... · - Interim ProcurementManager atActa Marine ... 0318 HAM 318 Hopper AKR MNY Wartsila + PON Power ABB BSL IHC Systems MSA Marlink](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ad404007f8b9a48398bd1fd/html5/thumbnails/36.jpg)
WORKSHOP6-8 groups
One mission
![Page 37: STRATEGIC CONTRACT MANAGEMENT BEST … 2017... · - Interim ProcurementManager atActa Marine ... 0318 HAM 318 Hopper AKR MNY Wartsila + PON Power ABB BSL IHC Systems MSA Marlink](https://reader034.vdocuments.net/reader034/viewer/2022051800/5ad404007f8b9a48398bd1fd/html5/thumbnails/37.jpg)
- 15 minuten -
Welke 3 key vragen moet je aan stellen aan:
de Businessunits stellen?
Leveranciers stellen?
Contract-/leveranciers managers stellen?
Presenteer bevindingen - 2 minuten per groep -
Mission: