strategic plan for world class reliability operations ... · equipment maintenance plans •inspect...

27
Strategic Plan for World Class Reliability Kate Kerrigan Operations Director, GPAllied

Upload: others

Post on 23-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Strategic Plan for World Class Reliability Operations ... · Equipment Maintenance Plans •Inspect to Detect •Time-Based Repair/Replace/Rebuild •Run to Failure •Develop asset

Strategic Plan for World Class

Reliability Kate Kerrigan

Operations Director, GPAllied

Page 2: Strategic Plan for World Class Reliability Operations ... · Equipment Maintenance Plans •Inspect to Detect •Time-Based Repair/Replace/Rebuild •Run to Failure •Develop asset

• less expense budget,

• less capital,

• less manpower.

The only way to do more with less is to do it differently.

Doing More With Less

Page 3: Strategic Plan for World Class Reliability Operations ... · Equipment Maintenance Plans •Inspect to Detect •Time-Based Repair/Replace/Rebuild •Run to Failure •Develop asset

Learning Objectives

1. Define World Class Reliability

2. Evaluate Current State

3. Define Future State

4. Develop a plan to close the gap

Page 4: Strategic Plan for World Class Reliability Operations ... · Equipment Maintenance Plans •Inspect to Detect •Time-Based Repair/Replace/Rebuild •Run to Failure •Develop asset

Reliability Operating Systems • Total Productive Manufacturing (TPM)

• Toyota Production System (TPS)

• Total Quality Management (TQM)

• Lean

• Six Sigma

• Benchmarking – Society for Maintenance & Reliability Professionals

– Institute of Industrial Engineers

– Amazon Books

Page 5: Strategic Plan for World Class Reliability Operations ... · Equipment Maintenance Plans •Inspect to Detect •Time-Based Repair/Replace/Rebuild •Run to Failure •Develop asset

Common Elements • Set Vision

• Define Organizational Structure – Roles

– Responsibilities

– Decision Making Rules

• Set Tactical Goals

• Implement; Start; Change the Way You Operate

• Measure Tactical Goals

• Prioritize and Fix Defects as They Arise

• Continuously Improve

Page 6: Strategic Plan for World Class Reliability Operations ... · Equipment Maintenance Plans •Inspect to Detect •Time-Based Repair/Replace/Rebuild •Run to Failure •Develop asset

Vision

Clear

Concise/Repeatable

Personally Meaningful

Visual/Observable

For The Boss Improve Uptime Optimized Cost

No Repeat Failures

Zero Breakdowns

For Yourself Weekends Free No Emergency

Calls - From Crew - From Boss

Planned Week Real Vacation

Personal Development

Time

Page 7: Strategic Plan for World Class Reliability Operations ... · Equipment Maintenance Plans •Inspect to Detect •Time-Based Repair/Replace/Rebuild •Run to Failure •Develop asset

Performance Improvement 19.3%

Page 8: Strategic Plan for World Class Reliability Operations ... · Equipment Maintenance Plans •Inspect to Detect •Time-Based Repair/Replace/Rebuild •Run to Failure •Develop asset

Believe

• Commit to the change

• Practice the new operating system

• Do not let anything interrupt the vision

• Be visible and constant cheerleader for strategy

• Welcome feedback

Page 9: Strategic Plan for World Class Reliability Operations ... · Equipment Maintenance Plans •Inspect to Detect •Time-Based Repair/Replace/Rebuild •Run to Failure •Develop asset

Plan Elements

• Asset Data

• Equipment Maintenance Plans

• Work Execution Management

• Staffing / Work Roles

• Materials Management

• Continuous Improvement

• Vendor Partnership / Management

Page 10: Strategic Plan for World Class Reliability Operations ... · Equipment Maintenance Plans •Inspect to Detect •Time-Based Repair/Replace/Rebuild •Run to Failure •Develop asset

Asset Data • Identify all assets

– Infrastructure (ISO 14224 defines the standard for equipment taxonomy when establishing your equipment hierarchy)

– ASTM F2446 - 04(2010) Standard Classification for Hierarchy of Equipment Identifiers and Boundaries for Reliability, Availability, and Maintainability (RAM) Performance Data Exchange

• Parent/Child Relationships • Components • Bill of Materials • Repairable/Swappable Equipment • Rank Equipment

Page 11: Strategic Plan for World Class Reliability Operations ... · Equipment Maintenance Plans •Inspect to Detect •Time-Based Repair/Replace/Rebuild •Run to Failure •Develop asset

Equipment Maintenance Plans

• Inspect to Detect

• Time-Based Repair/Replace/Rebuild

• Run to Failure

• Develop asset health plan for all equipment

• Balance the work load across all equipment

Page 12: Strategic Plan for World Class Reliability Operations ... · Equipment Maintenance Plans •Inspect to Detect •Time-Based Repair/Replace/Rebuild •Run to Failure •Develop asset

Equipment Maintenance Plans

• Preventive Maintenance

– Replace/Rebuild based on historical expectations

• Inspections

– Monitor until equipment defect occurs

Page 13: Strategic Plan for World Class Reliability Operations ... · Equipment Maintenance Plans •Inspect to Detect •Time-Based Repair/Replace/Rebuild •Run to Failure •Develop asset

Cost Comparison of Maintenance Programs

Source: EPRI Power Generation Study

Run to

Failure

Preventive Condition

Monitoring Precision

Mai

nte

nan

ce C

ost

($ p

er H

ors

epo

wer

)

Page 14: Strategic Plan for World Class Reliability Operations ... · Equipment Maintenance Plans •Inspect to Detect •Time-Based Repair/Replace/Rebuild •Run to Failure •Develop asset

Inspections / Condition Monitoring

• Continuous Monitoring

– Algorithm for alarm

– Alarm Reporting

• Tool Inspections

– Vibration; Infrared; Ultrasound; Thickness NDT

– Training Criteria / Qualification

– Frequency

• Sensory Inspections

Page 15: Strategic Plan for World Class Reliability Operations ... · Equipment Maintenance Plans •Inspect to Detect •Time-Based Repair/Replace/Rebuild •Run to Failure •Develop asset

Uptime / Availability

• Mean Time Between Failure (MTBF)

• Mean Time to Repair (MTTR)

P Potential Failure

F Functional

Failure P-F Interval

I Installation

I-P Interval

Proactive Maintenance/Reliability Tasks PdM Tasks

Reactive

Maintenance

T - Time

Resis

tan

ce t

o F

ail

ure

Page 16: Strategic Plan for World Class Reliability Operations ... · Equipment Maintenance Plans •Inspect to Detect •Time-Based Repair/Replace/Rebuild •Run to Failure •Develop asset

Work Execution Management Identify

Work

Estimate Work

Approve Work

Plan Complete Work

Schedule Work Execute Work

Follow-up Work

Recurring Work

TECO Work Order

Page 17: Strategic Plan for World Class Reliability Operations ... · Equipment Maintenance Plans •Inspect to Detect •Time-Based Repair/Replace/Rebuild •Run to Failure •Develop asset

Organizational Structure

• Staffing/ Work Roles

Maintenance & Reliability Leader

Plant Engineering

Maintenance Planning & Scheduling

Condition Monitoring

Team

Maintenance Supervisor &

Team

MRO Materials

Page 18: Strategic Plan for World Class Reliability Operations ... · Equipment Maintenance Plans •Inspect to Detect •Time-Based Repair/Replace/Rebuild •Run to Failure •Develop asset

Business Processes • Map RACI / Swim Lanes

– Responsible

– Accountable

– Consulted

– Informed

• Reliability Plan – Involve everyone in understanding the system

– Expectations

– Publish metrics

Page 19: Strategic Plan for World Class Reliability Operations ... · Equipment Maintenance Plans •Inspect to Detect •Time-Based Repair/Replace/Rebuild •Run to Failure •Develop asset

Continuous Improvement

• Precision Maintenance

• Engineering

• Data Mining

• Root Cause Analysis

• Metrics / Steering the Ship

• Communication Plan

Page 20: Strategic Plan for World Class Reliability Operations ... · Equipment Maintenance Plans •Inspect to Detect •Time-Based Repair/Replace/Rebuild •Run to Failure •Develop asset

Current State

• Determine barriers to vision

– Equipment Health

– Access to Equipment

– Organization / Responsibilities

– Skills

– Organizational Support

Page 21: Strategic Plan for World Class Reliability Operations ... · Equipment Maintenance Plans •Inspect to Detect •Time-Based Repair/Replace/Rebuild •Run to Failure •Develop asset

Define Future State

• Write down plan

• Define trigger to move to next step

• Constantly refer to the playbook

• Be prepared for resistance

• Short-term vs. long-term costs

Page 22: Strategic Plan for World Class Reliability Operations ... · Equipment Maintenance Plans •Inspect to Detect •Time-Based Repair/Replace/Rebuild •Run to Failure •Develop asset

Determine Metrics

• Set up CMMS to give them

– Mean Time Between Failure (MTBF)

– Schedule Attainment

– On Time Work Completion

– % Work Emergency

– Downtime

• Mean Time to Repair (MTTR)

• Number of Stops/Defects

Page 23: Strategic Plan for World Class Reliability Operations ... · Equipment Maintenance Plans •Inspect to Detect •Time-Based Repair/Replace/Rebuild •Run to Failure •Develop asset

To Pilot or Not To Pilot

What Good Looks Like

Is there enough coverage?

Is the frequency correct?

Is there a Process Quality

standard?

Is there a Personnel Quality

standard?

Is there consistency of execution?

Is it efficient execution?

Is performance improving?

Is there an innovation or corrective

action process?

Everyone Involved

Is everyone included?

Do all colleagues have a role?

Is success critical to everyone?

Are pilot boundaries reflective of overall operation?

Is work prioritized to reflect new goals?

Do you have the manpower resources to manage the entire operation?

Page 24: Strategic Plan for World Class Reliability Operations ... · Equipment Maintenance Plans •Inspect to Detect •Time-Based Repair/Replace/Rebuild •Run to Failure •Develop asset

Data Mining

• MTBF

• Bad Actors

• Population

• Continuous Improvement

Metrics are essential to tracking progress and determining when to make corrections

to the activities around reliability

Page 25: Strategic Plan for World Class Reliability Operations ... · Equipment Maintenance Plans •Inspect to Detect •Time-Based Repair/Replace/Rebuild •Run to Failure •Develop asset

Develop a Plan

• Write down the plan

• Publish metrics regularly

• Organize to the new work rules

• Believe in your plan

• Budget for initial costs

Page 26: Strategic Plan for World Class Reliability Operations ... · Equipment Maintenance Plans •Inspect to Detect •Time-Based Repair/Replace/Rebuild •Run to Failure •Develop asset

Strategy to World Class Reliability

• Define your Vision

• Project plan to achieve vision

• Organize resources to support plan

• Train to meet expectations

• Define triggers to ensure progress

Page 27: Strategic Plan for World Class Reliability Operations ... · Equipment Maintenance Plans •Inspect to Detect •Time-Based Repair/Replace/Rebuild •Run to Failure •Develop asset

Questions?

Kate Kerrigan

Operations Director