structural metal bonding at cessna aircraftcessna aircraft phosphoric acid anodize •automated...

15
© 2003 Textron Inc. Structural Metal Bonding Structural Metal Bonding At Cessna Aircraft At Cessna Aircraft

Upload: others

Post on 21-Mar-2020

16 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Structural Metal Bonding At Cessna AircraftCessna Aircraft Phosphoric Acid Anodize •Automated process line Clean, rinse, PAD, rinse, PAA, rinse, dry •Rate issues Surface cleaning,

© 2003 Textron Inc.

Structural Metal BondingStructural Metal BondingAt Cessna AircraftAt Cessna Aircraft

Page 2: Structural Metal Bonding At Cessna AircraftCessna Aircraft Phosphoric Acid Anodize •Automated process line Clean, rinse, PAD, rinse, PAA, rinse, dry •Rate issues Surface cleaning,

2© 2003 Textron Inc.

Cessna Aircraft

Discussion Points

Cessna Experience

Metal Bonding Process

Process Control Philosophy

Risk and Risk Mitigation

Conclusions

Page 3: Structural Metal Bonding At Cessna AircraftCessna Aircraft Phosphoric Acid Anodize •Automated process line Clean, rinse, PAD, rinse, PAA, rinse, dry •Rate issues Surface cleaning,

3© 2003 Textron Inc.

Cessna Aircraft

Cessna Experience

1960s - Secondary structure

1970s - Primary structure, integral fuel tanks

1980s - Fully bonded airframe

40 Years Experience and 6000+ airplanes

Page 4: Structural Metal Bonding At Cessna AircraftCessna Aircraft Phosphoric Acid Anodize •Automated process line Clean, rinse, PAD, rinse, PAA, rinse, dry •Rate issues Surface cleaning,

4© 2003 Textron Inc.

Cessna Aircraft

Metal Bonding Process

Phosphoric acid anodize Bond primer application Lay-up

Bagging and tooling Autoclave cure Post-cure inspection

Page 5: Structural Metal Bonding At Cessna AircraftCessna Aircraft Phosphoric Acid Anodize •Automated process line Clean, rinse, PAD, rinse, PAA, rinse, dry •Rate issues Surface cleaning,

5© 2003 Textron Inc.

Cessna Aircraft

Phosphoric Acid Anodize

•Automated process lineClean, rinse, PAD, rinse, PAA, rinse, dry

•Rate issuesSurface cleaning, water quality, solution aging

•Process control-Data acquisition of spec parameters: temp, time, voltage, current-Water break inspections-Current draw inspection-Wedge crack extension-Surface morphology-Periodic training

Page 6: Structural Metal Bonding At Cessna AircraftCessna Aircraft Phosphoric Acid Anodize •Automated process line Clean, rinse, PAD, rinse, PAA, rinse, dry •Rate issues Surface cleaning,

6© 2003 Textron Inc.

Cessna Aircraft

Bond Primer Application

•Manual airless sprayInspect, spray, flash, cure, inspect

•Rate issuesEnvironment control, primer agitation, operator training

•Process control-Data acquisition of spec parameters: time, temp, RH, monitoring of air quality-Visual, polarized filter-Period operator quals-Visual and thickness-Wedge crack extension

Page 7: Structural Metal Bonding At Cessna AircraftCessna Aircraft Phosphoric Acid Anodize •Automated process line Clean, rinse, PAD, rinse, PAA, rinse, dry •Rate issues Surface cleaning,

7© 2003 Textron Inc.

Cessna Aircraft

Lay-up

•Adhesive applicationInspect, cut, apply, inspect, assemble

•Rate issuesEnvironment control, fit checks, operator training,

•Process control-Recording of spec parameters: temp, RH, air quality, Out-time-tracking-Buddy check for paper-Visual-Shop instructions-Controlled expendables

Page 8: Structural Metal Bonding At Cessna AircraftCessna Aircraft Phosphoric Acid Anodize •Automated process line Clean, rinse, PAD, rinse, PAA, rinse, dry •Rate issues Surface cleaning,

8© 2003 Textron Inc.

Cessna Aircraft

Bagging and Tooling

•BaggingBreather, sealant, bag, vacuum check

•Rate issuesOperator training, tool maintenance

•Process control-Spec parameters: leak rate

Page 9: Structural Metal Bonding At Cessna AircraftCessna Aircraft Phosphoric Acid Anodize •Automated process line Clean, rinse, PAD, rinse, PAA, rinse, dry •Rate issues Surface cleaning,

9© 2003 Textron Inc.

Cessna Aircraft

Autoclave Cure

•Cure cycleLoad, instrument tools, leak check, start cycle, unload, debag, deflash

•Rate issuesTool maintenance

•Process control-Data acquisition of spec parameters: temp, pressure, time, leak rate-Periodic shear and peel tests

Page 10: Structural Metal Bonding At Cessna AircraftCessna Aircraft Phosphoric Acid Anodize •Automated process line Clean, rinse, PAD, rinse, PAA, rinse, dry •Rate issues Surface cleaning,

10© 2003 Textron Inc.

Cessna Aircraft

Post-Cure Inspection

•InspectionVisual for FOD and other anomalies, ultrasonic inspection

•Rate issuesOperator training

•Process control-Technician certification-Standards and calibration-Initial process qualification and subsequent requalifications for each bond assembly

Page 11: Structural Metal Bonding At Cessna AircraftCessna Aircraft Phosphoric Acid Anodize •Automated process line Clean, rinse, PAD, rinse, PAA, rinse, dry •Rate issues Surface cleaning,

11© 2003 Textron Inc.

Cessna Aircraft

Process Control Philosophy

“End of Process” inspection aloneis insufficient for assuring structural integrity.

Page 12: Structural Metal Bonding At Cessna AircraftCessna Aircraft Phosphoric Acid Anodize •Automated process line Clean, rinse, PAD, rinse, PAA, rinse, dry •Rate issues Surface cleaning,

12© 2003 Textron Inc.

Cessna Aircraft

Risk

A structural delamination and/or a bond failure can result in:

Safety issuesCustomer dissatisfactionLoss of confidence

CustomersFAA, other regulatory authorities

Degradation of reputation and BrandProduct liability (financial)

Page 13: Structural Metal Bonding At Cessna AircraftCessna Aircraft Phosphoric Acid Anodize •Automated process line Clean, rinse, PAD, rinse, PAA, rinse, dry •Rate issues Surface cleaning,

13© 2003 Textron Inc.

Cessna Aircraft

Risk Mitigation

Process Control MentalitySpecification adherenceIn process monitoringPersonnel training and qualificationNDIInitial assembly qualification and subsequent requalifications

Proper Facilities and EquipmentProcess line design and controlTooling design and maintenanceAutoclave design and control

Page 14: Structural Metal Bonding At Cessna AircraftCessna Aircraft Phosphoric Acid Anodize •Automated process line Clean, rinse, PAD, rinse, PAA, rinse, dry •Rate issues Surface cleaning,

14© 2003 Textron Inc.

Cessna Aircraft

Risk Mitigation

Experienced and knowledgeable staffManufacturing and FacilitiesQuality and InspectionM&P and other Engineering

Process and product improvements as a result of field experience – Lessons Learned

Page 15: Structural Metal Bonding At Cessna AircraftCessna Aircraft Phosphoric Acid Anodize •Automated process line Clean, rinse, PAD, rinse, PAA, rinse, dry •Rate issues Surface cleaning,

15© 2003 Textron Inc.

Cessna Aircraft

Conclusions

Benefits outweigh the risks if properly managedDocumented and audited processesProcess control mentalityProper facilities and equipmentActive maintenance programsExperienced staff that understands:- How to do it- Why they are doing it