Structure of the front-end DAQ for DIS PARITY in Hall A Bogdan Wojtsekhowski with Bob Michaels and Albert Shahinyan Jlab, 12/1/ 2006 The issues: e/pi rejection online, stability Examples of PID from HRS, BigBite Expected performance, examples from HRS, RCS Schematic, cost, manpower, timescale Left arm improvements, cost

Upload: owen-rodgers

Post on 27-Mar-2015

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Structure of the front-end DAQ for DIS PARITY in Hall A Bogdan Wojtsekhowski with Bob Michaels and Albert Shahinyan Jlab, 12/1/ 2006 The issues: e/pi rejection

Structure of the front-end DAQfor DIS PARITY in Hall A

Structure of the front-end DAQfor DIS PARITY in Hall A

Bogdan Wojtsekhowskiwith Bob Michaels and Albert Shahinyan

Jlab, 12/1/ 2006

The issues: e/pi rejection online, stability Examples of PID from HRS, BigBite Expected performance, examples from HRS, RCS Schematic, cost, manpower, timescale Left arm improvements, cost

The issues: e/pi rejection online, stability Examples of PID from HRS, BigBite Expected performance, examples from HRS, RCS Schematic, cost, manpower, timescale Left arm improvements, cost

Page 2: Structure of the front-end DAQ for DIS PARITY in Hall A Bogdan Wojtsekhowski with Bob Michaels and Albert Shahinyan Jlab, 12/1/ 2006 The issues: e/pi rejection

Structure of HRS detector packagesStructure of HRS detector packages

Jlab, 12/1/ 2006

Page 3: Structure of the front-end DAQ for DIS PARITY in Hall A Bogdan Wojtsekhowski with Bob Michaels and Albert Shahinyan Jlab, 12/1/ 2006 The issues: e/pi rejection

Shower PID for HRS detectorShower PID for HRS detector

Jlab, 12/1/ 2006

Page 4: Structure of the front-end DAQ for DIS PARITY in Hall A Bogdan Wojtsekhowski with Bob Michaels and Albert Shahinyan Jlab, 12/1/ 2006 The issues: e/pi rejection

Shower Calorimeter in the RCS experimentShower Calorimeter in the RCS experiment

Jlab, 12/1/ 2006

Page 5: Structure of the front-end DAQ for DIS PARITY in Hall A Bogdan Wojtsekhowski with Bob Michaels and Albert Shahinyan Jlab, 12/1/ 2006 The issues: e/pi rejection

Shower trigger and PID in the BigBite GEN packageShower trigger and PID in the BigBite GEN package

Jlab, 12/1/ 2006

Page 6: Structure of the front-end DAQ for DIS PARITY in Hall A Bogdan Wojtsekhowski with Bob Michaels and Albert Shahinyan Jlab, 12/1/ 2006 The issues: e/pi rejection

On-line PID wiring with available electronicsOn-line PID wiring with available electronics

Page 7: Structure of the front-end DAQ for DIS PARITY in Hall A Bogdan Wojtsekhowski with Bob Michaels and Albert Shahinyan Jlab, 12/1/ 2006 The issues: e/pi rejection

Concept of the PID with shower detectors Concept of the PID with shower detectors

Low Total High Total

High preShower

electrons

pions

preS

how

er a

mpl

itud

e

Shower amplitude

Page 8: Structure of the front-end DAQ for DIS PARITY in Hall A Bogdan Wojtsekhowski with Bob Michaels and Albert Shahinyan Jlab, 12/1/ 2006 The issues: e/pi rejection

Shower PID - software emulator by Bob MichaelsShower PID - software emulator by Bob Michaels

Jlab, 12/1/ 2006

Data from E99-117, the ratio e/ ~ 23

If A ~ 0.1, and ratio e/ ~ 10with factor R~104 -> A ~ 10-5

(assuming 10% accurate correction for pion A) standard HRS analysis: R ~ 2 x105

Page 9: Structure of the front-end DAQ for DIS PARITY in Hall A Bogdan Wojtsekhowski with Bob Michaels and Albert Shahinyan Jlab, 12/1/ 2006 The issues: e/pi rejection

Concept of the electronic diagramConcept of the electronic diagram

Page 10: Structure of the front-end DAQ for DIS PARITY in Hall A Bogdan Wojtsekhowski with Bob Michaels and Albert Shahinyan Jlab, 12/1/ 2006 The issues: e/pi rejection

List of NIM electronics and costList of NIM electronics and cost

Page 11: Structure of the front-end DAQ for DIS PARITY in Hall A Bogdan Wojtsekhowski with Bob Michaels and Albert Shahinyan Jlab, 12/1/ 2006 The issues: e/pi rejection

SummarySummary

Required R{e/ will be possible to get with NIM + scalers. Time scale of six months to construct and test electronics. Best option is just 20% most complicated than minimum set. Modification of the Left arm cost $10k for glass and $40k for PMTs. Upgrade of detector in HRS-Left will help future DIS experiments.

Required R{e/ will be possible to get with NIM + scalers. Time scale of six months to construct and test electronics. Best option is just 20% most complicated than minimum set. Modification of the Left arm cost $10k for glass and $40k for PMTs. Upgrade of detector in HRS-Left will help future DIS experiments.