Strumica, September 2013

2

Main Subjects

• Design study of road to Stavrochori to Drosato

• WP 1

• WP 2

• WP 3

• WP 4

IPA CROSS-BORDER PROGRAMME CRIS No: IPA/2009/DN021101/CN 307

3

Design study of road to Stavrochori to Drosato

IPA CROSS-BORDER PROGRAMME CRIS No: IPA/2009/DN021101/CN 307

• Thessaloniki-Kilkis-Sidirokastro-Promahonas

• Stavrochori – Petritsi

4

Design study of road to Stavrochori to Drosato

IPA CROSS-BORDER PROGRAMME CRIS No: IPA/2009/DN021101/CN 307

5

Design study of road to Stavrochori to Drosato

• 1.500.000€

• 1.200.004,33€ Subsidy Contract

• Start 4-2-2010 End 31-12-2013

• 570.969,39€ payments by now

• 629.034,94€

IPA CROSS-BORDER PROGRAMME CRIS No: IPA/2009/DN021101/CN 307

6

Design study of road to Stavrochori to Drosato

• Length 16,8 km width 17m 5 interchanges • central artery-interchanges-service roads

1. High way and Road Design 2. Topographical Design – Cadastre 3. Environmental Impact Study4. Geotechnical Design and Surveys5. Structural Design (bridges)6. Drainage/Hydraulic Design7. Design of Electric Street Lightning8. Labeling Study9. Health and Safety Plan and File

IPA CROSS-BORDER PROGRAMME CRIS No: IPA/2009/DN021101/CN 307

7

Work Package 1

Management and CoordinationManagement and Coordination

Deliverables1.2.4 Coordination Meeting Thessaloniki

Final Meeting Thessaloniki1.2.5 Coordination Meeting Strumica1.3.2 4th Progress report

IPA CROSS-BORDER PROGRAMME CRIS No: IPA/2009/DN021101/CN 307

8

Work Package 2

Information and PublicityInformation and Publicity

Deliverables2.1.1 Leaflets, banners and info boards2.2.1 Web portal2.3.1 Closing Conference Strumica

IPA CROSS-BORDER PROGRAMME CRIS No: IPA/2009/DN021101/CN 307

9

Work Package 3

Design Studies & Study for accession Design Studies & Study for accession infrastructure to the Industrial zones in infrastructure to the Industrial zones in

South-East regionSouth-East region

Deliverables3.1.1 Design Study 3.2.1 Analysis and preparation 3.3.1 Printing of the Study3.4.1 Dissemination of the StudyIPA CROSS-BORDER PROGRAMME

CRIS No: IPA/2009/DN021101/CN 307

10

Work Package 4

Investment guideInvestment guideActions4.1 Preparation of Investment Guide4.2 Design and printing of the of

Investment Guide booklet4.3 Preparation, design and printing of the

of CD4.4 Dissemination of the Investment Guide

and CDIPA CROSS-BORDER PROGRAMME

CRIS No: IPA/2009/DN021101/CN 307

11

Thank you