sts-127/2ja - nasajul 16, 2009  · in preparation for the fd2 surveys, inco would like to verify...

26
STS-127/2JA FD 02 Execute Package MSG Page(s) Title 003A 1 - 14 FD02 Flight Plan Revision (pdf) 004 15 - 16 FD02 Mission Summary (pdf) 005A 17 - 19 FD02 EVA Checklist Deltas (pdf) 006 20 - 24 STS-127 Middeck Stowage Updates (pdf) 007 25 ORB OPS CNTL ACC Changes (pdf) Approved by FAO: F. Reynolds Last Updated: Jul 16 2009 11:15AM GMT JEDI (Joint Execute package Development and Integration), v2.04.0003

Upload: others

Post on 23-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: STS-127/2JA - NASAJul 16, 2009  · In preparation for the FD2 surveys, INCO would like to verify that the VTR is powered on and that its clock is set to GMT time. If required the

STS-127/2JA FD 02 Execute Package

MSG Page(s) Title 003A 1 - 14 FD02 Flight Plan Revision (pdf) 004 15 - 16 FD02 Mission Summary (pdf) 005A 17 - 19 FD02 EVA Checklist Deltas (pdf) 006 20 - 24 STS-127 Middeck Stowage Updates (pdf) 007 25 ORB OPS CNTL ACC Changes (pdf)

Approved by FAO: F. Reynolds Last Updated: Jul 16 2009 11:15AM GMT JEDI (Joint Execute package Development and Integration), v2.04.0003  

Page 2: STS-127/2JA - NASAJul 16, 2009  · In preparation for the FD2 surveys, INCO would like to verify that the VTR is powered on and that its clock is set to GMT time. If required the

MSG 003 - FD02 FLIGHT PLAN REVISION

MSG INDEX 1 2

MSG NO. TITLE 3 4 5 6 7 8 9

11 12 13 14 15 16 17 18

20 21 22 23

25 26 27 28 29 30 31 32 33

35 36 37 38 39 40

42 43 44 45 46 47 48 49 50 51

MSG003A FD02 Flight Plan Revision MSG004 FD02 Mission Summary MSG005A FD02 EVA Checklist Deltas MSG006 STS-127 Middeck Stowage Updates MSG007 ORB OPS CNTL ACC Changes

1. POST SLEEP CRYO CONFIG 10

For today's cryo config, tanks 1 and 5 will be active for both O2 and H2. R1 O2,H2 MANF VLV TK1 (two) - OP (tb-OP)

TK3 HTRS A,B (four) – OFF

A15 CRYO TK5 HTRS O2,H2 A,B (four) - AUTO 2. UMBILICAL WELL IMAGES 19

We were unable to find the ET Umbilical Well images on the WLES, KFX or RPOP2 PGSCs. Please let us know to which laptop and folder you downloaded the images.

3. PDRS ABE ANNUNCIATION 24 During RMS Checkout yesterday, the transient failure that occurred during the Direct Drive test has been seen three times before during ground testing. The error is annunciated in Direct mode when the SINGLE/DIRECT DRIVE switch is released and is a result of the timing between the release of the drive command and when the MDA Demand Voltage BITE test is executed. This error is considered statistical in nature and occurs about 1 in 1200 Direct Drive switch cycles. Since Direct Drive operations are complete, this problem should not occur again.

4. HIGH DEF VIDEO 34

After yesterday's High Def video downlink it was unclear if the VTR was powered back on. In preparation for the FD2 surveys, INCO would like to verify that the VTR is powered on and that its clock is set to GMT time. If required the reference for VTR Clock Set is in P/TV page 12-15, steps 1 and 2.

5. ORB OPS CNTL ACC CHANGES 41

Due to Russian vehicle config, Message 007 contains several Pen & Inks for ORB OPS and the DAP CC.

END OF PAGE 1 OF 14, MSG 003 1

Page 3: STS-127/2JA - NASAJul 16, 2009  · In preparation for the FD2 surveys, INCO would like to verify that the VTR is powered on and that its clock is set to GMT time. If required the

MSG 003 - FD02 FLIGHT PLAN REVISION

END OF PAGE 2 OF 14, MSG 003

2 3 4 5 6 7

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

6. STS-127 STOWAGE UPDATE 1 Please replace the following pages in the Reference Data STS-127 Flight Supplement book with the pages contained in message 006: FS 1-6, FS 1-9, FS 1-11, FS 1-12 and FS 1-13

7. REPLACE PAGES 2-4 THROUGH 2-5 AND 3-8 THROUGH 3-17. 8

2

Page 4: STS-127/2JA - NASAJul 16, 2009  · In preparation for the FD2 surveys, INCO would like to verify that the VTR is powered on and that its clock is set to GMT time. If required the

07/16/09 05:42:13

FLT PLN/127/FLIGHT

FD02

NC2^

POLANSKY

HURLEY

CASSIDY

PAYETTE

MARSHBURN

WOLF

KOPRA

REPL

ANNE

D

2-4

S T S - 1 2 7

11

1213

1415

1617

1819

2021

22GMT 07/16/09 (197)

12

1314

1516

1718

1920

2122

23001/00

MET

Day 000

CDR

SLEEP

POST SLEEP

OMS

BURN

STBD WING SURVEY

M V R - S

M V R - N

M V R - P

MEAL

R C S *PORT WING SURVEY

NOSE CAP

SURVEY

I M U

M N V R

- Z L V

CWC-I

S/U

I C N C T ^

PLT

SLEEP

POST

SLEEP

POST SLEEP

OMS

BURN

OBSS UNBERTH

STBD WING SURVEY

NOSE CAP

SURVEY

PORT WING SURVEY

MEAL

M C I U *

MS1

SLEEP

P O S T

S L E E P

MEAL

EMU C/O

EMU

C/O

PREP

W S B

PGSC SETUP

(PART II)

EXERCISE

FILTER

CLEAN

CRYO 02 SNSR CK

D R Y S L V

D R Y S L V

D R Y S L V

POST SLEEP

D R Y S L V

L O G

MS2

SLEEP

POST SLEEP

STBD WING SURVEY

NOSE CAP

SURVEY

PORT WING SURVEY

MEAL

OBSS UNBERTH

FRED

SETUP

MS3

SLEEP

POST SLEEP

MEAL

EVA PRP XFER TO ISS

EXERCISE

P/TV01

VIDEO

SETUP

MIDDECK

XFER PREP

ERG

SETUP

D R Y S L V

D R Y S L V

D R Y S L V

L O G

P O S T

S L E E P

O 2 - I

O 2 - T

C / L ^

MS4

SLEEP

POST SLEEP

MEAL

EMU C/O

EVA PRP XFER TO ISS

ERG

SETUP

OMS

POD

SRVY

MIDDECK

XFER PREP

EMU

C/O

PREP

D R Y S L V

D R Y S L V

D R Y S L V

POST

SLEEP

C / L ^POST SLEEP

MS5

SLEEP

MEAL

EXER

POST SLEEP

EMU

C/O

PREP

EVA PRP XFER TO ISS

EMU C/O

DAY/NIGHT

ORBIT

910

1112

1314

1516

17

TDRS

W E Z-ZLV -XVV

INRTL

-ZLV -XVV

NC2

-ZLV -XVV

STBD SURVEY

NOSE SURVEY

PORT SURVEY

ORB ATT

*HEATER RCNFG

^R OMS to RCS

*FILTER CK

^CAMR S/U PT 1

NOTES

2-4

FD02

NC2^

POLANSKY

HURLEY

CASSIDY

PAYETTE

MARSHBURN

WOLF

KOPRA

REPL

ANNE

D

S T S - 1 2 7

11

1213

1415

1617

1819

2021

22GMT 07/16/09 (197)

12

1314

1516

1718

1920

2122

23001/00

MET

Day 000

CDR

SLEEP

POST SLEEP

OMS

BURN

STBD WING SURVEY

M V R - S

M V R - N

M V R - P

MEAL

R C S *PORT WING SURVEY

NOSE CAP

SURVEY

I M U

M N V R

- Z L V

CWC-I

S/U

I C N C T ^

PLT

SLEEP

POST

SLEEP

POST SLEEP

OMS

BURN

OBSS UNBERTH

STBD WING SURVEY

NOSE CAP

SURVEY

PORT WING SURVEY

MEAL

M C I U *

MS1

SLEEP

P O S T

S L E E P

MEAL

EMU C/O

EMU

C/O

PREP

W S B

PGSC SETUP

(PART II)

EXERCISE

FILTER

CLEAN

CRYO 02 SNSR CK

D R Y S L V

D R Y S L V

D R Y S L V

POST SLEEP

D R Y S L V

L O G

MS2

SLEEP

POST SLEEP

STBD WING SURVEY

NOSE CAP

SURVEY

PORT WING SURVEY

MEAL

OBSS UNBERTH

FRED

SETUP

MS3

SLEEP

POST SLEEP

MEAL

EVA PRP XFER TO ISS

EXERCISE

P/TV01

VIDEO

SETUP

MIDDECK

XFER PREP

ERG

SETUP

D R Y S L V

D R Y S L V

D R Y S L V

L O G

P O S T

S L E E P

O 2 - I

O 2 - T

C / L ^

MS4

SLEEP

POST SLEEP

MEAL

EMU C/O

EVA PRP XFER TO ISS

ERG

SETUP

OMS

POD

SRVY

MIDDECK

XFER PREP

EMU

C/O

PREP

D R Y S L V

D R Y S L V

D R Y S L V

POST

SLEEP

C / L ^POST SLEEP

MS5

SLEEP

MEAL

EXER

POST SLEEP

EMU

C/O

PREP

EVA PRP XFER TO ISS

EMU C/O

DAY/NIGHT

ORBIT

910

1112

1314

1516

17

TDRS

W E ZORB ATT

-ZLV -XVV

INRTL

-ZLV -XVV

NC2

-ZLV -XVV

STBD SURVEY

NOSE SURVEY

PORT SURVEY

NOTES

*HEATER RCNFG

^R OMS to RCS

*FILTER CK

^CAMR S/U PT 1

3

Page 5: STS-127/2JA - NASAJul 16, 2009  · In preparation for the FD2 surveys, INCO would like to verify that the VTR is powered on and that its clock is set to GMT time. If required the

07/16/09 05:42:13

FLT PLN/127/FLIGHT

FD02

NC3^

POLANSKY

HURLEY

CASSIDY

PAYETTE

MARSHBURN

WOLF

KOPRA

REPL

ANNE

D

2-5

S T S - 1 2 7

23

07/17

0102

0304

0506

0708

0910

GMT 07/16/09 (197)

001/00

0102

0304

0506

0708

0910

1112

MET

Day 001

CDR

SLEEP

PRE SLEEP

+X RCS

BURN

M N V R

- Z L V

P O R T

W I N G

S U R V E Y

F U T M V R

PRE

SLEEP

EXERCISE

PMC

A/G

M U S

M N V R

- Z L VPRE

SLP

I C N C T *

I C N T #

PLT

SLEEP

PRE SLEEP

+X RCS

BURN

P O R T

W I N G

S U R V E Y

OBSS BERTH

FCMS

C/O

M U S

A P C U @

MS1

SLEEP

PRE SLEEP

F C P R G *

RNDZ TOOLS

C/O

W L E S ^

D R Y S L V

O C A *

MS2

SLEEP

P O R T

W I N G

S U R V E Y

OBSS BERTH

RNDZ TOOLS

C/O

M U SPRE SLEEP

PRE

SLEEP

MS3

SLEEP

S/U

C/L

CAM

ODS

RING

EXT

D R Y S L V

D R Y S L V

M U SPRE SLEEP

MS4

SLEEP

PRE SLEEP

EXERCISE

S/U

C/L

CAM

ODS

RING

EXT

D R Y S L V

D R Y S L V

MS5

SLEEP

PRE SLEEP

LDRI

DOWNLINK

EXER

DAY/NIGHT

ORBIT

1718

1920

2122

2324

25

TDRS

W E Z-ZLV -XVV

NC3

-ZLV -XVV

ORB ATT

♣MIDDECK XFER PREP

⊕MIDDECK XFER PREP

*TK SWITCH: R to L OMS FEED

#RETURN

@ACT

*MANUAL

^PREP-RNDZ C/O*RATE RCNFG

NOTES

2-5

FD02

NC3^

POLANSKY

HURLEY

CASSIDY

PAYETTE

MARSHBURN

WOLF

KOPRA

REPL

ANNE

D

S T S - 1 2 7

23

07/17

0102

0304

0506

0708

0910

GMT 07/16/09 (197)

001/00

0102

0304

0506

0708

0910

1112

MET

Day 001

CDR

SLEEP

PRE SLEEP

+X RCS

BURN

M N V R

- Z L V

P O R T

W I N G

S U R V E Y

F U T M V R

PRE

SLEEP

EXERCISE

PMC

A/G

M U S

M N V R

- Z L VPRE

SLP

I C N C T *

I C N T #

PLT

SLEEP

PRE SLEEP

+X RCS

BURN

P O R T

W I N G

S U R V E Y

OBSS BERTH

FCMS

C/O

M U S

A P C U @

MS1

SLEEP

PRE SLEEP

F C P R G *

RNDZ TOOLS

C/O

W L E S ^

D R Y S L V

O C A *

MS2

SLEEP

P O R T

W I N G

S U R V E Y

OBSS BERTH

RNDZ TOOLS

C/O

M U SPRE SLEEP

PRE

SLEEP

MS3

SLEEP

S/U

C/L

CAM

ODS

RING

EXT

D R Y S L V

D R Y S L V

M U SPRE SLEEP

MS4

SLEEP

PRE SLEEP

EXERCISE

S/U

C/L

CAM

ODS

RING

EXT

D R Y S L V

D R Y S L V

MS5

SLEEP

PRE SLEEP

LDRI

DOWNLINK

EXER

DAY/NIGHT

ORBIT

1718

1920

2122

2324

25

TDRS

W E ZORB ATT

-ZLV -XVV

NC3

-ZLV -XVV

NOTES

♣MIDDECK XFER PREP

⊕MIDDECK XFER PREP

*TK SWITCH: R to L OMS FEED

#RETURN

@ACT

*MANUAL

^PREP-RNDZ C/O*RATE RCNFG

4

Page 6: STS-127/2JA - NASAJul 16, 2009  · In preparation for the FD2 surveys, INCO would like to verify that the VTR is powered on and that its clock is set to GMT time. If required the

07/16/09 05:42:13

FLT PLN/127/FLIGHT

02

POLANSKY

PAYETTE

HURLEY

FD02 EZ ACTIVITIES:

TEPC (ORB OPS, CREW SYS)

CHECK STATUS

√OCAC FILTER

HARD REBOOT ALL PGSCs EXCEPT:

STS-7(WLES),STS-6(RPOP2),

& OCA ROUTER.

REPL

ANNE

D

3-8

STS-

127

FD (

)

11:00

12:00

13:00

14:00

GMT

Date

07/16

(197)

12:00

13:00

14:00

15:00

16:00

MET

Day 000

WE

Z

T D R S

~

~

~

D / N

D O R B 1 4 1 5 1 6

O R B 9 1 0 1 1

~ - Z L V - X V V I N R T L ~- Z L V - X V VS T S A T T

CDR

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

√HUM SEP for H2O Accumulation

~

PLT

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS2

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

NOTES

3-8

02

POLANSKY

PAYETTE

HURLEY

FD02 EZ ACTIVITIES:

TEPC (ORB OPS, CREW SYS)

CHECK STATUS

√OCAC FILTER

HARD REBOOT ALL PGSCs EXCEPT:

STS-7(WLES),STS-6(RPOP2),

& OCA ROUTER.

REPL

ANNE

D

STS-

127

FD (

)

11:00

12:00

13:00

14:00

GMT

Date

07/16

(197)

12:00

13:00

14:00

15:00

16:00

MET

Day 000

WE

Z

T D R SD / N

D O R B 1 4 1 5 1 6

O R B 9 1 0 1 1

S T S A T T ~ - Z L V - X V V I N R T L ~- Z L V - X V V

CDR

~

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

√HUM SEP for H2O Accumulation

PLT

~

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS2

~

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

5

Page 7: STS-127/2JA - NASAJul 16, 2009  · In preparation for the FD2 surveys, INCO would like to verify that the VTR is powered on and that its clock is set to GMT time. If required the

07/16/09 05:42:13

FLT PLN/127/FLIGHT

02

CASSIDY

MARSHBURN

WOLF

KOPRA

P/TV08 EXTERNAL SURVEY (S/U)

(P/TV, SCENES) Step 1

P/TV08 EXTERNAL SURVEY (OPS)

(P/TV, SCENES) Item 1

Best Lighting Avail (15:51-16:24)

REPL

ANNE

D

3-9

STS-

127

FD (

)

11:00

12:00

13:00

14:00

GMT

Date

07/16

(197)

12:00

13:00

14:00

15:00

16:00

MET

Day 000

WE

Z

T D R S ~

~~

D / N

D O R B 1 4 1 5 1 6

O R B 9 1 0 1 1

~ - Z L V - X V V I N R T L ~- Z L V - X V VS T S A T T

MS1

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

DRY SALIVA CLCT (ORB OPS, SDBI)

DRY SALIVA CLCT (ORB OPS, SDBI)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP LOGBOOK

(ORB OPS, SDBI)

MS3

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

DRY SALIVA CLCT (ORB OPS, SDBI)

DRY SALIVA CLCT (ORB OPS, SDBI)

SLEEP LOGBOOK (ORB OPS, SDBI)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS4

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

DRY SALIVA CLCT (ORB OPS, SDBI)

DRY SALIVA CLCT (ORB OPS, SDBI)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS5

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

NOTES

3-9

02

CASSIDY

MARSHBURN

WOLF

KOPRA

P/TV08 EXTERNAL SURVEY (S/U)

(P/TV, SCENES) Step 1

P/TV08 EXTERNAL SURVEY (OPS)

(P/TV, SCENES) Item 1

Best Lighting Avail (15:51-16:24)

REPL

ANNE

D

STS-

127

FD (

)

11:00

12:00

13:00

14:00

GMT

Date

07/16

(197)

12:00

13:00

14:00

15:00

16:00

MET

Day 000

WE

Z

T D R SD / N

D O R B 1 4 1 5 1 6

O R B 9 1 0 1 1

S T S A T T ~ - Z L V - X V V I N R T L ~- Z L V - X V V

MS1

~

SLEEP

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

DRY SALIVA CLCT (ORB OPS, SDBI)

DRY SALIVA CLCT (ORB OPS, SDBI)

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

SLEEP LOGBOOK

(ORB OPS, SDBI)

MS3

~

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

DRY SALIVA CLCT (ORB OPS, SDBI)

DRY SALIVA CLCT (ORB OPS, SDBI)

SLEEP LOGBOOK (ORB OPS, SDBI)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS4

~

SLEEP

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

DRY SALIVA CLCT (ORB OPS, SDBI)

DRY SALIVA CLCT (ORB OPS, SDBI)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS5

~

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

6

Page 8: STS-127/2JA - NASAJul 16, 2009  · In preparation for the FD2 surveys, INCO would like to verify that the VTR is powered on and that its clock is set to GMT time. If required the

07/16/09 05:42:13

FLT PLN/127/FLIGHT

02

POLANSKY

PAYETTE

HURLEY

B A14 RCS/OMS HTR L POD A - OFF

B - AUTO

R POD A - OFF

B - AUTO

A APCU POWER DISABLE

Prior to Step 3:

A15 APCU 1,2 CONV(two) - OFF

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MNVR (TRK) BIAS +YSI (Stbd Survey)

TG=4 BV=5 P=0 Y=40 OM=300

A14/AUTO/VERN, OBSS UNBERTH cmplt, Init TRK

REPL

ANNE

D

3-10

STS-

127

FD (

)

15:00

16:00

17:00

18:00

GMT

Date

07/16

(197)

16:00

17:00

18:00

19:00

20:00

MET

Day 000

WE

Z

T D R S

~

~

~

D / N

D O R B 1 6 1 2 3

O R B 1 1 1 2 1 3 1 4

~ N C 2 - Z L V - X V V ~S T B D S U R V E YS T S A T T

CDR

~

ON-ORBIT OMS BURN

(ORB OPS, OMS)

<NC2 TIG (16:51)

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS) ~

RCS/OMS HEATER RECONFIG B

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

MNVR (TRK) -ZLV -XVV

TG=2 BV=3 OM=0

A1/AUTO/VERN Init TRK

CWC-I FILL (ORB OPS, CWC-I FILL)

Parts A-C

Setup, Purge, and Teardown

I'CNCT: R OMS TO RCS (OPCL, RCS)

PLT

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

ON-ORBIT OMS BURN

(ORB OPS, OMS)

OBSS UNBERTH A

(PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS) ~

L17 Check MCIU filter screen

MS2

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS) ~

OBSS UNBERTH A

(PDRS, OBSS OPERATIONS)

FRED SETUP

(ORB OPS, FRED)

NOTES

3-10

02

POLANSKY

PAYETTE

HURLEY

B A14 RCS/OMS HTR L POD A - OFF

B - AUTO

R POD A - OFF

B - AUTO

A APCU POWER DISABLE

Prior to Step 3:

A15 APCU 1,2 CONV(two) - OFF

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MNVR (TRK) BIAS +YSI (Stbd Survey)

TG=4 BV=5 P=0 Y=40 OM=300

A14/AUTO/VERN, OBSS UNBERTH cmplt, Init TRK

REPL

ANNE

D

STS-

127

FD (

)

15:00

16:00

17:00

18:00

GMT

Date

07/16

(197)

16:00

17:00

18:00

19:00

20:00

MET

Day 000

WE

Z

T D R SD / N

D O R B 1 6 1 2 3

O R B 1 1 1 2 1 3 1 4

S T S A T T ~ N C 2 - Z L V - X V V ~S T B D S U R V E Y

CDR

~

ON-ORBIT OMS BURN

(ORB OPS, OMS)

<NC2 TIG (16:51)

~

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

RCS/OMS HEATER RECONFIG B

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

MNVR (TRK) -ZLV -XVV

TG=2 BV=3 OM=0

A1/AUTO/VERN Init TRK

CWC-I FILL (ORB OPS, CWC-I FILL)

Parts A-C

Setup, Purge, and Teardown

I'CNCT: R OMS TO RCS (OPCL, RCS)

PLT

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

ON-ORBIT OMS BURN

(ORB OPS, OMS)

OBSS UNBERTH A

(PDRS, OBSS OPERATIONS) ~

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

L17 Check MCIU filter screen

MS2

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

OBSS UNBERTH A

(PDRS, OBSS OPERATIONS)

FRED SETUP

(ORB OPS, FRED)

NOTES

7

Page 9: STS-127/2JA - NASAJul 16, 2009  · In preparation for the FD2 surveys, INCO would like to verify that the VTR is powered on and that its clock is set to GMT time. If required the

07/16/09 05:42:13

FLT PLN/127/FLIGHT

02

CASSIDY

MARSHBURN

WOLF

KOPRA

CYCLE ERGOMETER OPS

(ORB OPS, CREW SYS)

ERGOMETER SETUP

ON MCC GO: O2 REPRESS TERM

C5 DIRECT O2 vlv - CL

OCAC PWR - ON

P/TV01 VIDEO SETUP

(PHOTO/TV, SCENES) SETUP

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

REPL

ANNE

D

3-11

STS-

127

FD (

)

15:00

16:00

17:00

18:00

GMT

Date

07/16

(197)

16:00

17:00

18:00

19:00

20:00

MET

Day 000

WE

Z

T D R S ~

~~

D / N

D O R B 1 6 1 2 3

O R B 1 1 1 2 1 3 1 4

~ N C 2 - Z L V - X V V ~S T B D S U R V E YS T S A T T

MS1

EMU CHECKOUT (EVA, CHECKOUTS)

Perform for 2 EMUs;

Stow LCVGs in ECOKS when cmplt

MCC will TMBU S/W limits,

Steps 1 & 100

~

EMU CHECKOUT PREP

(EVA, AIRLOCK CONFIG)

PGSC SETUP (PART II)

Setup the remaining PGSCs

PGSC NETWORK (ORB OPS, PGSC)

LOCKER STOWAGE UPDATE

Update remaining PGSCs Locker

Stow with disk carried onboard

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS3

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

EXERCISE

O2 REPRESS INIT

OCAC PWR - OFF

C5 DIRECT O2 vlv - OP

C/L CAMR INSTL(PHOTO/TV,C/L CAMR)

Work ML60B,ODS,CL Camr steps only

MS4

EMU CHECKOUT (EVA, CHECKOUTS)

Perform for 2 EMUs;

Stow LCVGs in ECOKS when cmplt

MCC will TMBU S/W limits,

Steps 1 & 100

~

CYCLE ERGOMETER OPS

(ORB OPS, CREW SYS)

ERGOMETER SETUP

P/TV08 EXTERNAL SURVEY (S/U)

(P/TV, SCENES) Step 1

P/TV08 EXTERNAL SURVEY (OPS)

(P/TV, SCENES) Item 1

Best Lighting Avail (15:51-16:24)

~

EMU CHECKOUT PREP

(EVA, AIRLOCK CONFIG)

C/L CAMR INSTL(PHOTO/TV,C/L CAMR)

Work ML60B,ODS,CL Camr steps only

MS5

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

EMU CHECKOUT PREP

(EVA, AIRLOCK CONFIG)

EMU CHECKOUT (EVA, CHECKOUTS)

Perform for 2 EMUs;

Stow LCVGs in ECOKS when cmplt

MCC will TMBU S/W limits,

Steps 1 & 100

~

NOTES

3-11

02

CASSIDY

MARSHBURN

WOLF

KOPRA

CYCLE ERGOMETER OPS

(ORB OPS, CREW SYS)

ERGOMETER SETUP

ON MCC GO: O2 REPRESS TERM

C5 DIRECT O2 vlv - CL

OCAC PWR - ON

P/TV01 VIDEO SETUP

(PHOTO/TV, SCENES) SETUP

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

REPL

ANNE

D

STS-

127

FD (

)

15:00

16:00

17:00

18:00

GMT

Date

07/16

(197)

16:00

17:00

18:00

19:00

20:00

MET

Day 000

WE

Z

T D R SD / N

D O R B 1 6 1 2 3

O R B 1 1 1 2 1 3 1 4

S T S A T T ~ N C 2 - Z L V - X V V ~S T B D S U R V E Y

MS1

~

EMU CHECKOUT (EVA, CHECKOUTS)

Perform for 2 EMUs;

Stow LCVGs in ECOKS when cmplt

MCC will TMBU S/W limits,

Steps 1 & 100

EMU CHECKOUT PREP

(EVA, AIRLOCK CONFIG)

PGSC SETUP (PART II)

Setup the remaining PGSCs

PGSC NETWORK (ORB OPS, PGSC)

LOCKER STOWAGE UPDATE

Update remaining PGSCs Locker

Stow with disk carried onboard

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS3

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EXERCISE

O2 REPRESS INIT

OCAC PWR - OFF

C5 DIRECT O2 vlv - OP

C/L CAMR INSTL(PHOTO/TV,C/L CAMR)

Work ML60B,ODS,CL Camr steps only

MS4

~

EMU CHECKOUT (EVA, CHECKOUTS)

Perform for 2 EMUs;

Stow LCVGs in ECOKS when cmplt

MCC will TMBU S/W limits,

Steps 1 & 100

CYCLE ERGOMETER OPS

(ORB OPS, CREW SYS)

ERGOMETER SETUP

~P/TV08 EXTERNAL SURVEY (S/U)

(P/TV, SCENES) Step 1

P/TV08 EXTERNAL SURVEY (OPS)

(P/TV, SCENES) Item 1

Best Lighting Avail (15:51-16:24)

EMU CHECKOUT PREP

(EVA, AIRLOCK CONFIG)

C/L CAMR INSTL(PHOTO/TV,C/L CAMR)

Work ML60B,ODS,CL Camr steps only

MS5

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EMU CHECKOUT PREP

(EVA, AIRLOCK CONFIG)

~

EMU CHECKOUT (EVA, CHECKOUTS)

Perform for 2 EMUs;

Stow LCVGs in ECOKS when cmplt

MCC will TMBU S/W limits,

Steps 1 & 100

NOTES

8

Page 10: STS-127/2JA - NASAJul 16, 2009  · In preparation for the FD2 surveys, INCO would like to verify that the VTR is powered on and that its clock is set to GMT time. If required the

07/16/09 05:42:13

FLT PLN/127/FLIGHT

02

POLANSKY

PAYETTE

HURLEY

MNVR (TRK) BIAS +XSI (Nose Cap)

TG=4 BV=5 P=330 Y=0 OM=140

A14/AUTO/VERN, RCC SURVEY-STBD cmplt, Init TRK

MNVR TRK BIAS -YSI (Port Survey)

TG=4 BV=5 P=0 Y=323 OM=330

A14/AUTO/VERN, RCC SURVEY-PORT Step 3 cmplt, Init TRK

REPL

ANNE

D

3-12

STS-

127

FD (

)

19:00

20:00

21:00

22:00

GMT

Date

07/16

(197)

20:00

21:00

22:00

23:00

00:00

MET

Day 000

WE

Z

T D R S

~

~

~ ~

D / N

D O R B 3 4 5 6

O R B 1 4 1 5 1 6 1 7

~ N O S E S U R V E Y ~P O R T S U R V E YS T S A T T

CDR

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)~

MEAL

OBSS LDRI/IDC RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS) ~

OBSS LDRI/IDC RCC SURVEY - NOSE CAP

(PDRS, OBSS OPERATIONS)

PLT

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)~

OBSS LDRI/IDC RCC SURVEY - NOSE CAP

(PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS) ~

MEAL

MS2

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)~

OBSS LDRI/IDC RCC SURVEY - NOSE CAP

(PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS) ~

MEAL

NOTES

3-12

02

POLANSKY

PAYETTE

HURLEY

MNVR (TRK) BIAS +XSI (Nose Cap)

TG=4 BV=5 P=330 Y=0 OM=140

A14/AUTO/VERN, RCC SURVEY-STBD cmplt, Init TRK

MNVR TRK BIAS -YSI (Port Survey)

TG=4 BV=5 P=0 Y=323 OM=330

A14/AUTO/VERN, RCC SURVEY-PORT Step 3 cmplt, Init TRK

REPL

ANNE

D

STS-

127

FD (

)

19:00

20:00

21:00

22:00

GMT

Date

07/16

(197)

20:00

21:00

22:00

23:00

00:00

MET

Day 000

WE

Z

T D R SD / N

D O R B 3 4 5 6

O R B 1 4 1 5 1 6 1 7

S T S A T T ~ N O S E S U R V E Y ~P O R T S U R V E Y

CDR

~OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

MEAL ~

OBSS LDRI/IDC RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - NOSE CAP

(PDRS, OBSS OPERATIONS)

PLT

~OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - NOSE CAP

(PDRS, OBSS OPERATIONS) ~

OBSS LDRI/IDC RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)

MEAL

MS2

~OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - NOSE CAP

(PDRS, OBSS OPERATIONS) ~

OBSS LDRI/IDC RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)

MEAL

NOTES

9

Page 11: STS-127/2JA - NASAJul 16, 2009  · In preparation for the FD2 surveys, INCO would like to verify that the VTR is powered on and that its clock is set to GMT time. If required the

07/16/09 05:42:13

FLT PLN/127/FLIGHT

02

CASSIDY

MARSHBURN

WOLF

KOPRA

REPL

ANNE

D

3-13

STS-

127

FD (

)

19:00

20:00

21:00

22:00

GMT

Date

07/16

(197)

20:00

21:00

22:00

23:00

00:00

MET

Day 000

WE

Z

T D R S ~

~~ ~

D / N

D O R B 3 4 5 6

O R B 1 4 1 5 1 6 1 7

~ N O S E S U R V E Y ~P O R T S U R V E YS T S A T T

MS1

MEAL

EMU CHECKOUT (EVA, CHECKOUTS)

Perform for 2 EMUs;

Stow LCVGs in ECOKS when cmplt

MCC will TMBU S/W limits,

Steps 1 & 100

~

R2 BLR CNTLR/HTR (three) - B

EXERCISE

FILTER CLEANING

(IFM, SCHEDULED MAINTENANCE)

Do not perform MCIU filter clean

CRYO 02 TK HTR SNSR CK

(ORB OPS, EPS)

DRY SALIVA CLCT (ORB OPS, SDBI)

DRY SALIVA CLCT (ORB OPS, SDBI)

MS3

MEAL

EVA PREP FOR TRANSFER TO ISS

(EVA, AIRLOCK CONFIG)

MIDDECK XFER PREP

Ref. Transfer List,

Resupply item 30.1

~

DRY SALIVA CLCT (ORB OPS, SDBI)

MS4

MEAL

EMU CHECKOUT (EVA, CHECKOUTS)

Perform for 2 EMUs;

Stow LCVGs in ECOKS when cmplt

MCC will TMBU S/W limits,

Steps 1 & 100

~

EVA PREP FOR TRANSFER TO ISS

(EVA, AIRLOCK CONFIG)

MIDDECK XFER PREP

Ref. Transfer List,

Resupply item 30.1

~

DRY SALIVA CLCT (ORB OPS, SDBI)

MS5

MEAL

EXERCISE

~

EVA PREP FOR TRANSFER TO ISS

(EVA, AIRLOCK CONFIG)

EMU CHECKOUT (EVA, CHECKOUTS)

Perform for 2 EMUs;

Stow LCVGs in ECOKS when cmplt

MCC will TMBU S/W limits,

Steps 1 & 100

~

NOTES

3-13

02

CASSIDY

MARSHBURN

WOLF

KOPRA

REPL

ANNE

D

STS-

127

FD (

)

19:00

20:00

21:00

22:00

GMT

Date

07/16

(197)

20:00

21:00

22:00

23:00

00:00

MET

Day 000

WE

Z

T D R SD / N

D O R B 3 4 5 6

O R B 1 4 1 5 1 6 1 7

S T S A T T ~ N O S E S U R V E Y ~P O R T S U R V E Y

MS1

MEAL~

EMU CHECKOUT (EVA, CHECKOUTS)

Perform for 2 EMUs;

Stow LCVGs in ECOKS when cmplt

MCC will TMBU S/W limits,

Steps 1 & 100

R2 BLR CNTLR/HTR (three) - B

EXERCISE

FILTER CLEANING

(IFM, SCHEDULED MAINTENANCE)

Do not perform MCIU filter clean

CRYO 02 TK HTR SNSR CK

(ORB OPS, EPS)

DRY SALIVA CLCT (ORB OPS, SDBI)

DRY SALIVA CLCT (ORB OPS, SDBI)

MS3

MEAL

EVA PREP FOR TRANSFER TO ISS

(EVA, AIRLOCK CONFIG)

~

MIDDECK XFER PREP

Ref. Transfer List,

Resupply item 30.1

DRY SALIVA CLCT (ORB OPS, SDBI)

MS4

MEAL~

EMU CHECKOUT (EVA, CHECKOUTS)

Perform for 2 EMUs;

Stow LCVGs in ECOKS when cmplt

MCC will TMBU S/W limits,

Steps 1 & 100

EVA PREP FOR TRANSFER TO ISS

(EVA, AIRLOCK CONFIG)

~

MIDDECK XFER PREP

Ref. Transfer List,

Resupply item 30.1

DRY SALIVA CLCT (ORB OPS, SDBI)

MS5

MEAL ~

EXERCISE

EVA PREP FOR TRANSFER TO ISS

(EVA, AIRLOCK CONFIG)

~EMU CHECKOUT (EVA, CHECKOUTS)

Perform for 2 EMUs;

Stow LCVGs in ECOKS when cmplt

MCC will TMBU S/W limits,

Steps 1 & 100

NOTES

10

Page 12: STS-127/2JA - NASAJul 16, 2009  · In preparation for the FD2 surveys, INCO would like to verify that the VTR is powered on and that its clock is set to GMT time. If required the

07/16/09 05:42:13

FLT PLN/127/FLIGHT

02

POLANSKY

PAYETTE

HURLEY

TFL 192

TFL 188

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MNVR (TRK) -ZLV -XVV

TG=2 BV=3 OM=0

A14/AUTO/VERN,

RCC SURVEY-PORT Step 11 cmplt, Init TRK

I'CNCT RETURN (OPS 2,3) (OPCL,RCS)

REPL

ANNE

D

3-14

STS-

127

FD (

)

23:00

00:00

01:00

02:00

GMT

Date

07/16

(197)

00:00

01:00

02:00

03:00

04:00

MET

Day 001

WE

Z

T D R S

~

~~

D / N

D O R B 6 7 8

O R B 1 7 1 8 1 9

~ - Z L V - X V V N C 3 ~- Z L V - X V VS T S A T T

CDR

~

ON-ORBIT +X RCS BURN

(ORB OPS, RCS)

< NC3 TIG (02:28)

MNVR (TRK) -ZLV -XVV

TG=2 BV=3 OM=0

A1/AUTO/VERN Init TRK

OBSS LDRI/IDC RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)~

FUTURE LOADED MNVR (TRK) -ZLV +YVV (SIMO DUMP)

TG=2 BV=3 OM=270

A1/AUTO/VERN (13:05) Init TRK

EXERCISE

LOW BACK PAIN QUEST (ASSY OPS, PAYLOADS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

I'CNCT TK SWITCH: From R to L OMS FEED(OPCL,RCS)

PLT

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

ON-ORBIT +X RCS BURN

(ORB OPS, RCS)

OBSS LDRI/IDC RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)~

OBSS BERTH

(PDRS, OBSS OPERATIONS)

Record Camera D

FCMS OPS

(ORB OPS, EPS)

LOW BACK PAIN QUEST (ASSY OPS, PAYLOADS)

A15 APCU 1,2 CONV(two) - ON

MS2

OBSS LDRI/IDC RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)~

OBSS BERTH

(PDRS, OBSS OPERATIONS)

Record Camera D

RNDZ TOOLS CHECKOUT

(RNDZ, RNDZ TOOLS)

LOW BACK PAIN QUEST (ASSY OPS, PAYLOADS)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

3-14

02

POLANSKY

PAYETTE

HURLEY

TFL 192

TFL 188

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MNVR (TRK) -ZLV -XVV

TG=2 BV=3 OM=0

A14/AUTO/VERN,

RCC SURVEY-PORT Step 11 cmplt, Init TRK

I'CNCT RETURN (OPS 2,3) (OPCL,RCS)

REPL

ANNE

D

STS-

127

FD (

)

23:00

00:00

01:00

02:00

GMT

Date

07/16

(197)

00:00

01:00

02:00

03:00

04:00

MET

Day 001

WE

Z

T D R SD / N

D O R B 6 7 8

O R B 1 7 1 8 1 9

S T S A T T ~ - Z L V - X V V N C 3 ~- Z L V - X V V

CDR

~

ON-ORBIT +X RCS BURN

(ORB OPS, RCS)

< NC3 TIG (02:28)

MNVR (TRK) -ZLV -XVV

TG=2 BV=3 OM=0

A1/AUTO/VERN Init TRK~

OBSS LDRI/IDC RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)

FUTURE LOADED MNVR (TRK) -ZLV +YVV (SIMO DUMP)

TG=2 BV=3 OM=270

A1/AUTO/VERN (13:05) Init TRK

EXERCISE

LOW BACK PAIN QUEST (ASSY OPS, PAYLOADS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

I'CNCT TK SWITCH: From R to L OMS FEED(OPCL,RCS)

PLT

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

ON-ORBIT +X RCS BURN

(ORB OPS, RCS)

~OBSS LDRI/IDC RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)

OBSS BERTH

(PDRS, OBSS OPERATIONS)

Record Camera D

FCMS OPS

(ORB OPS, EPS)

LOW BACK PAIN QUEST (ASSY OPS, PAYLOADS)

A15 APCU 1,2 CONV(two) - ON

MS2

~OBSS LDRI/IDC RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)

OBSS BERTH

(PDRS, OBSS OPERATIONS)

Record Camera D

RNDZ TOOLS CHECKOUT

(RNDZ, RNDZ TOOLS)

LOW BACK PAIN QUEST (ASSY OPS, PAYLOADS)

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

11

Page 13: STS-127/2JA - NASAJul 16, 2009  · In preparation for the FD2 surveys, INCO would like to verify that the VTR is powered on and that its clock is set to GMT time. If required the

07/16/09 05:42:13

FLT PLN/127/FLIGHT

02

CASSIDY

MARSHBURN

WOLF

KOPRA

C After Crew Choice D/L cmplt:

L10 MUX/VTR/CC PWR - ON (LED ON)

RECONFIGURE OCA D/L RATE (PL Max)

(ORB OPS, PGSC

) Part C, omit Step 4

L10 MUX/VTR/CC PWR - OFF (LED OFF)

WLES RNDZ TOOLS C/O PREP

(ORB OPS,WLES)

REPL

ANNE

D

3-15

STS-

127

FD (

)

23:00

00:00

01:00

02:00

GMT

Date

07/16

(197)

00:00

01:00

02:00

03:00

04:00

MET

Day 001

WE

Z

T D R S ~

~

~

D / N

D O R B 6 7 8

O R B 1 7 1 8 1 9

~ - Z L V - X V V N C 3 ~- Z L V - X V VS T S A T T

MS1

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

FUEL CELL PURGE - MANUAL

(ORB OPS, EPS)

RNDZ TOOLS CHECKOUT

(RNDZ, RNDZ TOOLS)

RECONFIG OCA DWNLK RATE C

MS3

C/L CAMR INSTALL

(PHOTO/TV, C/L CAMR)

Skip ML60B, ODS, & CL Camr steps

DOCKING MECH INITIALIZATION

DOCKING MECH POWERUP

DOCKING RING EXTENSION

DOCKING MECH POWERDOWN

(RNDZ, APDS)

MIDDECK XFER PREP

Ref. Transfer List,

Resupply item 30.1

~

DRY SALIVA CLCT (ORB OPS, SDBI)

LOW BACK PAIN QUEST (ASSY OPS,P/L)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS4

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

EXERCISE

C/L CAMR INSTALL

(PHOTO/TV, C/L CAMR)

Skip ML60B, ODS, & CL Camr steps

DOCKING MECH INITIALIZATION

DOCKING MECH POWERUP

DOCKING RING EXTENSION

DOCKING MECH POWERDOWN

(RNDZ, APDS)

MIDDECK XFER PREP

Ref. Transfer List,

Resupply item 30.1

~

DRY SALIVA CLCT (ORB OPS, SDBI)

MS5

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

PLAYBACK (DIGITAL)

(PHOTO/TV, CUE CARD)

LDRI SURVEYS

KU TDRE (00:57-01:51)

EXERCISE

~

NOTES

3-15

02

CASSIDY

MARSHBURN

WOLF

KOPRA

C After Crew Choice D/L cmplt:

L10 MUX/VTR/CC PWR - ON (LED ON)

RECONFIGURE OCA D/L RATE (PL Max)

(ORB OPS, PGSC

) Part C, omit Step 4

L10 MUX/VTR/CC PWR - OFF (LED OFF)

WLES RNDZ TOOLS C/O PREP

(ORB OPS,WLES)

REPL

ANNE

D

STS-

127

FD (

)

23:00

00:00

01:00

02:00

GMT

Date

07/16

(197)

00:00

01:00

02:00

03:00

04:00

MET

Day 001

WE

Z

T D R SD / N

D O R B 6 7 8

O R B 1 7 1 8 1 9

S T S A T T ~ - Z L V - X V V N C 3 ~- Z L V - X V V

MS1

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

FUEL CELL PURGE - MANUAL

(ORB OPS, EPS)

RNDZ TOOLS CHECKOUT

(RNDZ, RNDZ TOOLS)

RECONFIG OCA DWNLK RATE C

MS3

C/L CAMR INSTALL

(PHOTO/TV, C/L CAMR)

Skip ML60B, ODS, & CL Camr steps

DOCKING MECH INITIALIZATION

DOCKING MECH POWERUP

DOCKING RING EXTENSION

DOCKING MECH POWERDOWN

(RNDZ, APDS)

~MIDDECK XFER PREP

Ref. Transfer List,

Resupply item 30.1

DRY SALIVA CLCT (ORB OPS, SDBI)

LOW BACK PAIN QUEST (ASSY OPS,P/L)

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS4

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EXERCISE

C/L CAMR INSTALL

(PHOTO/TV, C/L CAMR)

Skip ML60B, ODS, & CL Camr steps

DOCKING MECH INITIALIZATION

DOCKING MECH POWERUP

DOCKING RING EXTENSION

DOCKING MECH POWERDOWN

(RNDZ, APDS)

~MIDDECK XFER PREP

Ref. Transfer List,

Resupply item 30.1

DRY SALIVA CLCT (ORB OPS, SDBI)

MS5

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

PLAYBACK (DIGITAL)

(PHOTO/TV, CUE CARD)

LDRI SURVEYS

KU TDRE (00:57-01:51)

~

EXERCISE

NOTES

12

Page 14: STS-127/2JA - NASAJul 16, 2009  · In preparation for the FD2 surveys, INCO would like to verify that the VTR is powered on and that its clock is set to GMT time. If required the

07/16/09 05:42:13

FLT PLN/127/FLIGHT

02

POLANSKY

PAYETTE

HURLEY

PRIVATE MEDICAL CONFERENCE

Perform via A/G 2

REPL

ANNE

D

3-16

STS-

127

FD (

)

03:00

04:00

05:00

06:00

GMT

Date

07/17

(198)

04:00

05:00

06:00

07:00

08:00

MET

Day 001

WE

Z

T D R S

~

~~

D / N

D O R B 9 1 0 1 1

O R B 2 0 2 1 2 2

~ ~- Z L V - X V VS T S A T T

CDR

SLEEP

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

PLT

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS2

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

NOTES

3-16

02

POLANSKY

PAYETTE

HURLEY

PRIVATE MEDICAL CONFERENCE

Perform via A/G 2

REPL

ANNE

D

STS-

127

FD (

)

03:00

04:00

05:00

06:00

GMT

Date

07/17

(198)

04:00

05:00

06:00

07:00

08:00

MET

Day 001

WE

Z

T D R SD / N

D O R B 9 1 0 1 1

O R B 2 0 2 1 2 2

S T S A T T ~ ~- Z L V - X V V

CDR

~

SLEEP

~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

PLT

~

SLEEP

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS2

~

SLEEP

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

13

Page 15: STS-127/2JA - NASAJul 16, 2009  · In preparation for the FD2 surveys, INCO would like to verify that the VTR is powered on and that its clock is set to GMT time. If required the

07/16/09 05:42:13

FLT PLN/127/FLIGHT

02

CASSIDY

MARSHBURN

WOLF

KOPRA

REPL

ANNE

D

3-17

STS-

127

FD (

)

03:00

04:00

05:00

06:00

GMT

Date

07/17

(198)

04:00

05:00

06:00

07:00

08:00

MET

Day 001

WE

Z

T D R S ~

~

~

D / N

D O R B 9 1 0 1 1

O R B 2 0 2 1 2 2

~ ~- Z L V - X V VS T S A T T

MS1

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

DRY SALIVA CLCT (ORB OPS, SDBI)

MS3

SLEEP

~

DRY SALIVA CLCT (ORB OPS, SDBI)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS4

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

DRY SALIVA CLCT (ORB OPS, SDBI)

MS5

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

NOTES

3-17

02

CASSIDY

MARSHBURN

WOLF

KOPRA

REPL

ANNE

D

STS-

127

FD (

)

03:00

04:00

05:00

06:00

GMT

Date

07/17

(198)

04:00

05:00

06:00

07:00

08:00

MET

Day 001

WE

Z

T D R SD / N

D O R B 9 1 0 1 1

O R B 2 0 2 1 2 2

S T S A T T ~ ~- Z L V - X V V

MS1

~

SLEEP

~ PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

DRY SALIVA CLCT (ORB OPS, SDBI)

MS3

~

SLEEP

DRY SALIVA CLCT (ORB OPS, SDBI)

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS4

~

SLEEP

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

DRY SALIVA CLCT (ORB OPS, SDBI)

MS5

~

SLEEP

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

14

Page 16: STS-127/2JA - NASAJul 16, 2009  · In preparation for the FD2 surveys, INCO would like to verify that the VTR is powered on and that its clock is set to GMT time. If required the

MSG 004 - FD02 MISSION SUMMARY

Good Morning Endeavour!!! 1 2 3 4 5 6 7 8 9

10 11

It is SO good to see all of you on orbit!!! Have a great day! Have a great flight!!! YOUR CURRENT ORBIT IS: 128 X 99 NM NOTAMS: 12

13 14 15 16 17 18 19 20 21 22 23 24

NOTAMS - NO CHANGE

EDW - EDW IN USE. EDT ELS DAY / VFR ONLY. EDW - LAKEBED RWY 15/33 - GREEN. RWY 18L - UNUSABLE. NOR - LAKEBED RUNWAYS GREEN. GUA - RWY 24R END LIGHTS OTS. GUA - RWY 06R/24L CLOSED. INN - CLOSED. IKF - NOT USABLE. NO AGREEMENT. BEN - NOT RECOMMENDED/NOT SUPPORTED.

NEXT 2 PLS OPPORTUNITIES: 25

26 27 28 29

NOR17 ORB 17 – 1/00:34 FEW050 SCT120 BKN200 7 120/06P08 NOR17 ORB 33 – 2/00:20 SCT250 7 170/06P08 OMS TANK FAIL CAPABILITY: 30

31 32 33 34 35

POST NC-4 / PRE Ti: STEEP SHALLOW L OMS FAILS: NO YES R OMS FAILS: YES YES LEAKING OMS PRPLT BURN: 36

37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

PRE Ti: L OMS LEAK: ALWAYS BURN OUT OF PLANE ASAP R OMS LEAK: ALWAYS BURN OUT OF PLANE ASAP POST Ti: L OMS LEAK: ALWAYS BURN RETRO ASAP R OMS LEAK: ALWAYS BURN RETRO ASAP

END OF PAGE 1 OF 2, MSG 004 15

Page 17: STS-127/2JA - NASAJul 16, 2009  · In preparation for the FD2 surveys, INCO would like to verify that the VTR is powered on and that its clock is set to GMT time. If required the

MSG 004 - FD02 MISSION SUMMARY

END OF PAGE 2 OF 2, MSG 004

OMS QUANTITIES(%) 1 2 3 4 5 6 7 8 9

10 11 12 13 14 15 16

Subtract interconnect counter for current OMS quantities. POST NC2: L OMS OX = 64.1 R OMS OX = 61.7 FU = 63.7 FU = 61.3 POST NH / PRE NC-4: L OMS OX = 49.7 R OMS OX = 47.6 FU = 49.2 FU = 47.2 AT DOCK : L OMS OX = 38.8 R OMS OX = 38.4 FU = 38.4 FU = 38.1 DELTA V AVAILABLE: 17 POST NC2 POST NH / PRE NC-4 AT DOCK 18

19 20

OMS 617 FPS 471 FPS 369 FPS ARCS (TOTAL ABOVE QTY1) 56 FPS 56 FPS 31 FPS 21

22 23 24 25 26 27 28 29 30 31 32

TOTAL IN THE AFT 673 FPS 527 FPS 400 FPS ARCS (TOTAL ABOVE QTY2) 84 FPS 84 FPS 60 FPS FRCS (ABOVE QTY 1) 52 FPS 51 FPS 40 FPS AFT QTY 1 92 % 92 % 87 % AFT QTY 2 55 % 54 % 49 % SYSTEM FAILURE IMPACT WORK AROUND

PDRS1 Transient MDA Demand Voltage BITE for WR

Autobrakes are set. RMS SEL – OFF then PORT to clear transient BITE

33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

16

Page 18: STS-127/2JA - NASAJul 16, 2009  · In preparation for the FD2 surveys, INCO would like to verify that the VTR is powered on and that its clock is set to GMT time. If required the

MSG 005 - EVA CHECKLIST DELTAS

TASK PROCEDURE UPDATES 1

2

3

4

5

6

7

All EVAs Tool Config: Due to limited number of 6” sockets there is no 6” socket on the socket caddy in the IV bag.  Please make the following pen and inks.  Battery Cue Card 2 8

9

10

11

(Page FS CC 7‐183 (FQ) in EVA FS Checklist)  IEA Bolt Data Was:  IEA Bolt Data

Slot H1 H2 W APFR Torque Turns Torque Turns

EVA

3

1 Remove 1 30 12, QQ,F,12 Install A

4 Remove 2 30 12, QQ, C, 6 Install D

3 Remove 3 26 12, QQ, F, 12 Install C

2 Remove 4 26 12, RR, J, 12 Install B

EVA

4 5 Remove 5 18 12, QQ, F, 12

Install E

6 Remove 6 22 12, QQ, C, 1 Install F 12

13 Is: (updating Slot 4 and 2 callouts)  IEA Bolt Data

Slot H1 H2 W APFR Torque Turns Torque Turns

EVA

3

1 Remove 1 30 12, QQ,F,12 Install A

4 Remove 4 30 12, QQ, C, 6 Install B

3 Remove 3 26 12, QQ, F, 12 Install C

2 Remove 2 26 12, RR, J, 12 Install D

EVA

4 5 Remove 5 18 12, QQ, F, 12

Install E

6 Remove 6 22 12, QQ, C, 1 Install F 14

15

16

17

18

19

20

21

22

23

Block A Step 8  Was: release H1 5‐6 turn Is:  release H1 10 turns, expect release by 6 turns 

 Step 10 Was:  release H2 16‐17 turn Is: release H2 20 turns, expect release by 17 turns 

 

END OF PAGE 1 OF 3, MSG 005 17

Page 19: STS-127/2JA - NASAJul 16, 2009  · In preparation for the FD2 surveys, INCO would like to verify that the VTR is powered on and that its clock is set to GMT time. If required the

MSG 005 - EVA CHECKLIST DELTAS

Block C 1

2

3

4

5

6

7

8

9

Step 3  Was: release H1 5‐6 turn Is:  release H1 10 turns, expect release by 6 turns 

 Step 5 Was:  release H2 16‐17 turn Is: release H2 20 turns, expect release by 17 turns 

 EVA 4 10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

Page 7‐127,  EV2 Step 11 Was: Release H1 5‐6 turns Is:  Release H1 10 turns, expect release by 6 turns  Step 13 Was:  Release H2 16‐17 turns Is: Release H2 20 turns, expect release by 17 turns 

 Page 7‐128, EV1 

Step 19 Was: release H1 5‐6 turns Is:  release H1 10 turns, expect release by 6 turns  Step 21 Was:  Release H2 16‐17 turns Is: Release H2 20 turns, expect release by 17 turns 

 Page 7‐128, EV2 

Step 26 Was: release H1 5‐6 turns Is:  release H1 10 turns, expect release by 6 turns  Step 28 Was:  release H2 16‐17 turns Is: release H2 20 turns, expect release by 17 turns 

 Page 7‐129, EV1 

Step 38 Was: release H1 5‐6 turns Is:  release H1 10 turns, expect release by 6 turns  Step 40 Was:  release H2 16‐17 turns Is: release H2 20 turns, expect release by 17 turns  

  

END OF PAGE 2 OF 3, MSG 005 18

Page 20: STS-127/2JA - NASAJul 16, 2009  · In preparation for the FD2 surveys, INCO would like to verify that the VTR is powered on and that its clock is set to GMT time. If required the

MSG 005 - EVA CHECKLIST DELTAS

END OF PAGE 3 OF 3, MSG 005

EVA 5 1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

Page 7‐152 Add the following: Crewlock Zenith Handrail (if too crowded; report where stowed)    RET Lg‐sm 

        DRT    RET Lg‐sm 

        DRT  Page 7‐161 Add the following: 

EV1  3a.  Transfer WETA/J bag to EV2  EV2  7a. Receive WETA/J bag; temp stow at A/L 

 Page 7‐164 Add the following: 

EV1 2a. Xlate to A/L 2b. Retrieve WETA/J bag 6. Temp stow WETA/J bag  

 Page 7‐170 Delete the following: 

EV2  WETA Retrieval steps 1‐8                         

19

Page 21: STS-127/2JA - NASAJul 16, 2009  · In preparation for the FD2 surveys, INCO would like to verify that the VTR is powered on and that its clock is set to GMT time. If required the

STS-

127

MID

DEC

K S

TOW

AG

E (C

ont)

06/0

3/09

FS

1-6

R

EF/

127/

FIN

FOR

WA

RD

LO

CK

ERS

(Con

t)

MF5

7H

Bags

H

elm

et (2

) In

fligh

t Sto

wag

e R

estra

int (

9)

Jetti

son

Sto

wag

e (7

) Bu

ngee

, Adj

usta

ble

(10)

C

anis

ter,

WC

S (C

offe

e C

an)

Cov

ers

HU

D (2

) P

arac

hute

(7)

Hos

es

Per

sona

l Hyg

iene

W

CS

Can

iste

r K

it, C

omm

C

able

, Com

m 4

ft

Cab

le, C

omm

14

ft M

icro

phon

e, H

andh

eld

VLH

S (2

) K

it, S

EE

M

irror

, Per

sona

l Hyg

iene

(2)

PIP

Pin

O

2 B

leed

Orif

ice

PIP

Pin

(12)

P

IP P

in, E

gres

s P

ole

(Spa

re)

Sw

itch

Gua

rd

Tape

G

ray,

1 in

G

ray,

2 in

MF5

7H

(Con

t) W

ipes

, Dis

infe

ctan

t (1

pkg)

Zi

ploc

k B

ag, 1

2x12

(8)

Zipl

ock

Bag

, 8x8

(20)

M

F57K

P

lug

Atta

ch B

olt (

4)

Plu

g A

ttach

Bol

t, B

otto

m B

ody

Hal

ve (4

) P

lug

Atta

ch B

olt,

Top

Bod

y H

alve

(4)

Plu

g Te

ther

s (3

) R

CC

Plu

g C

over

Pla

te (1

8)

T B

arre

l Nut

s (4

) T-

Bar

(4)

Uni

vers

al R

epai

r Plu

g M

F57M

C

loth

ing,

MS

5 U

P

Clo

thin

g, M

S5

DN

M

F57O

IS

S F

ood

| IS

S F

ood

MF7

1C

ISS

Foo

d | I

SS

Foo

d

MF7

1E

Clo

thin

g, M

S2

Clo

thin

g, M

S2

MF7

1G

Cre

w S

uppo

rt M

F71H

C

loth

ing,

PLT

C

loth

ing,

PLT

M

F71K

B

unge

e, A

djus

tabl

e (5

) D

ry W

ipes

, Mul

tipur

pose

(15p

kg)

Line

r, D

ry T

rash

Bag

(20)

P

rinte

r Tr

ash

Bag,

Dry

Tr

ash

Bag,

Men

u Fo

od (2

0)

MF7

1M

ISS

Foo

d | C

loth

ing,

MS

4 M

icro

bial

Che

ck V

alve

(MC

V)

MS

G 0

06 -

STS

-127

MID

DE

CK

STO

WA

GE

UP

DA

TES

EN

D O

F P

AG

E 1

OF

5, M

SG

006

20

Page 22: STS-127/2JA - NASAJul 16, 2009  · In preparation for the FD2 surveys, INCO would like to verify that the VTR is powered on and that its clock is set to GMT time. If required the

STS-

127

MID

DEC

K S

TOW

AG

E (C

ont)

06/0

3/09

FS

1-9

R

EF/

127/

FIN

AFT

LO

CK

ERS

(Con

t)

MA

9N

Kit,

Per

sona

l Hyg

iene

(PH

K) (

7)

Bra

cket

Cla

mp

(2)

Bra

cket

, Mul

tiuse

(3)

Che

m li

ghts

G

reen

(27)

R

ed (2

8)

Des

k, P

GS

C (3

) K

it, C

onta

min

ant C

lean

up

Fibe

rsco

pe L

ight

Sou

rce

Fibe

rsco

pe, V

ideo

Ki

t, Fl

uid

Load

ing

(2)

Res

train

ts

Foot

Loo

p (S

pare

) (6)

S

eat (

Spa

re) (

2)

Tras

h B

ag, W

MC

(Spa

re)

MA1

6D

Bag

, Che

mic

al R

esis

tant

(2)

Bot

tle, A

ir S

ampl

e (2

) B

reak

er B

ar (P

alle

t Rem

oval

) B

reak

out B

ox

Car

tridg

e N

ozzl

e D

uxse

al

Ext

ensi

on, 4

in

Filte

r, W

aste

Wat

er D

ump

MA1

6D

(Con

t) IF

M F

aste

ner R

etai

ner C

ushi

on

Kits

Foam

App

licat

or (2

) R

MS

D&

C IF

M

Lubr

ican

t Tu

rnbu

ckle

(3)

MA1

6F

Bag

, CH

eCS

M

A16G

Au

dio

Dos

imet

er

Bat

ts

AA

(30)

Li

-ION

(10)

B

ends

Tre

atm

ent A

dapt

er (B

TA)

Cam

era,

D2X

S w

/Car

d C

OA

S

Bra

cket

Ada

pter

(2)

Filte

r, N

I-CR

Li

ght S

hade

(2)

Wor

klig

ht (2

)

MA1

6J

ISS

Foo

d | I

SS

Foo

d M

A16L

IS

S F

ood

| IS

S F

ood

MA1

6N

BA

L/U

NB

AL

Tran

sfor

mer

B

att C

ap/F

use

(LID

AR

) B

atts

A

A

BP

SM

U (2

) LI

DA

R (2

) B

PS

MU

(2)

Cab

les

BN

C to

BN

C

BP

SM

U to

CC

U A

dapt

er (2

) LI

DA

R I/

F (2

) P

CS

-PD

IP 1

553

Orb

iter

PG

SC

Pw

r, 6

ft S

SV

to P

DIP

/CIP

(2)

Kits

Med

ical

Acc

esso

ry

SS

V F

use

LID

AR w

/Nig

htsc

ope

SS

V C

ompr

essi

on E

ncod

er

MS

G 0

06 -

STS

-127

MID

DE

CK

STO

WA

GE

UP

DA

TES

EN

D O

F P

AG

E 2

OF

5, M

SG

006

21

Page 23: STS-127/2JA - NASAJul 16, 2009  · In preparation for the FD2 surveys, INCO would like to verify that the VTR is powered on and that its clock is set to GMT time. If required the

STS-

127

MID

DEC

K S

TOW

AG

E (C

ont)

06/0

3/09

FS

1-1

1 R

EF/

127/

FIN

LiO

H V

OL

(MD

52M

) C

anis

ters

AT

CO

Li

OH

(29)

G

love

s, N

itrile

(40)

G

-Sui

t (6)

M

ask,

Sur

gica

l Filt

er (3

0)

EXTE

RN

AL A

IRLO

CK

P

OR

T E

MU

– E

V2

(see

EV

A C

/L)

STB

D

EM

U –

EV

1 (s

ee E

VA

C/L

) A

IRLO

CK

FLO

OR

BA

G

Cre

w C

are

Pkg

(4)

Cre

w P

refe

renc

e H

ygie

ne, K

opra

IS

S F

ood,

Hal

f CTB

(7)

VO

L H

(MD

23R

) IN

BO

AR

D

See

EV

A C

/L

OU

TBO

AR

D

See

EV

A C

/L

MA

12B

(WIN

DO

W S

HA

DE

BA

G)

Bag

, Win

dow

Sha

de

Bag

, IFM

Con

t Hos

e an

d C

able

Kit

Ada

pter

, Red

/Yel

low

C

able

s A

C P

wr C

ont T

rans

fer,

15 ft

A

VIU

Ada

pter

, 1 ft

D

C H

arne

ss, 2

4 ft

(2)

DC

Pig

tail

Con

nect

or (2

) M

CIU

Dat

a, 1

0 ft

MC

IU to

PN

L L1

5, 6

ft

Min

icam

Ext

ensi

on, 1

3 ft

Min

icam

Orb

it, 1

0 ft

OC

A S

pare

P

PO

V T

eac

Wye

C

lam

p, V

ario

us S

izes

(14)

C

onne

ctor

, S

prin

g (3

) C

onne

ctor

, Spr

ing/

flang

e (3

) G

love

s, C

lean

Roo

m

Hos

es

1/4

in (6

ft)

3/8

in (6

ft)

Con

t Blu

e/B

lue

Con

t Red

/Red

C

ont Y

ello

w/Y

ello

w (S

teril

e), 8

ft w

/3/8

in M

ale/

Mal

e “-0

02”

Ada

pter

(2)

CW

C C

ontin

genc

y, 2

0 ft

(2)

O2

Con

tinge

ncy

Kit,

Par

achu

te R

epac

k (2

) P

rote

ctiv

e C

over

Wire

way

(3)

MA

12B

(WIN

DO

W S

HA

DE

BA

G)

(Con

t) B

ag, W

indo

w S

hade

(Con

t) S

hade

, CC

TV M

onito

r (2)

S

crew

, Soc

ket H

ead

Cap

(3)

Spr

ing

(3)

VP

MP

Pan

el C

over

(2)

Wat

er E

quip

men

t Fi

lter,

Wan

d E

xten

der

Gal

ley

Nee

dle

(Spa

re)

Sep

arat

or, W

ater

/Gas

(2)

Supp

ly W

ater

Dum

p Li

ne P

urge

D

evic

e W

ater

Dis

pens

er, C

ontin

genc

y W

indo

w S

hade

, Ovh

d (2

) W

indo

w S

hade

, Aft

(2)

Win

dow

Shi

eld,

Ovh

d (2

) Zi

ploc

ks fo

r CW

C, 3

6x36

(10)

MS

G 0

06 -

STS

-127

MID

DE

CK

STO

WA

GE

UP

DA

TES

EN

D O

F P

AG

E 3

OF

5, M

SG

006

22

Page 24: STS-127/2JA - NASAJul 16, 2009  · In preparation for the FD2 surveys, INCO would like to verify that the VTR is powered on and that its clock is set to GMT time. If required the

STS-

127

MID

DEC

K S

TOW

AG

E (C

ont)

06/0

3/09

FS

1-1

2 R

EF/

127/

FIN

M

IDD

EC

K C

EIL

ING

B

AG

E (P

ort 1

) A

CE

S (M

S5

DN

) B

ag, S

uit S

tow

age

Boo

ts

CC

A

Glo

ves

G-S

uit

Har

ness

LC

G

Cha

ir, N

AD

A

Clo

thin

g, C

DR

C

loth

ing,

MS

4 C

loth

ing,

MS

5 P

HK

, Com

mun

ity

RSK

Rai

l 6

Bus

hing

H

eadr

est,

RS

K

ICU

Bra

cket

(2)

ICU

Stra

p To

wel

s, L

intle

ss (2

4)

Was

hclo

ths

(100

) B

AG

F (P

ort 2

) C

ard,

PC

MC

IA (5

) IE

LK

Sho

es, A

thle

tic

Sho

es, C

yclin

g

MID

DE

CK

CE

ILIN

G

(Con

t) B

AG

G (S

tbd

1)

Bag

, Jet

tison

Sto

wag

e D

iscr

ete

Jum

per C

able

s 1

& 2

K

its Blo

od C

olle

ctio

n U

rine

Col

lect

ion

(UC

K)

Wat

er

Wire

Har

ness

B

att,

EM

U (3

) C

harg

er, B

att

Cab

les

BD

S P

wr

EFBM

Con

tinge

ncy

Sens

or C

able

JE

M B

EP

Jum

per

Cam

era,

D2X

S

CC

C (6

) C

WC

-I (8

) FR

ED

G

laci

er F

an/S

crew

s G

laci

er B

low

er

SAFE

R H

and

Con

trol M

ount

W

ire T

ies,

32i

n (2

0)

MID

DE

CK

CE

ILIN

G

(Con

t) B

AG

H (S

tbd

2)

AR

ED

Das

h P

ot

CA

P IS

S2,

LTA

B

CC

A (E

MU

) C

over

, Arm

Wris

t Leg

Pro

tect

ive

(8)

DO

SIS

E

CO

K

EV

A R

ecep

tacl

e C

over

(2)

Glo

ves,

Pha

se V

I (2

pr)

Hex

Driv

e, ¼

in w

/6 in

ext

ensi

on

ISS

Foo

d LC

VG w

/Bio

med

LW

R A

rm (2

) M

UT

EE

MS

G 0

06 -

STS

-127

MID

DE

CK

STO

WA

GE

UP

DA

TES

EN

D O

F P

AG

E 4

OF

5, M

SG

006

23

Page 25: STS-127/2JA - NASAJul 16, 2009  · In preparation for the FD2 surveys, INCO would like to verify that the VTR is powered on and that its clock is set to GMT time. If required the

STS-

127

MID

DEC

K S

TOW

AG

E (C

ont)

06/0

3/09

FS

1-1

3 R

EF/

127/

FIN

M

IDD

EC

K F

LOO

R

BA

G A

(Por

t 1)

Con

tinge

ncy

UC

D (6

) C

over

, Arm

Wris

t (8)

D

IDB

(16)

E

CO

K (2

) E

ntry

Gar

men

ts

Equ

ipm

ent T

ethe

r, A

djus

tabl

e w

/Slid

e Lo

ck (6

) E

quip

men

t Tet

her,

Ret

ract

able

w

/Slid

e Lo

ck (1

1)

ER

AD

K

Eye

glas

ses

Feca

l Col

lect

ion

(2)

Glo

ves,

Pha

se V

I (4

pr)

Kit,

Con

tact

Len

s LC

VG w

/Bio

med

M

MW

S T

ool S

tow

age

Cad

dy

Mod

ular

Min

i Wor

ksta

tion

(MW

S)

Key

Stra

p M

WS

(2)

PE

EL

(4)

Saf

ety

Teth

er, 8

5 ft

(2)

Teth

er, B

ody

Res

train

t Te

ther

, Wai

st w

/Slid

e Lo

ck (2

) Tr

ash

Bag

, Lar

ge E

VA

W

olf A

/L C

loth

ing

MID

DE

CK

FLO

OR

(C

ont)

BA

G B

(Por

t 2)

CTB

, Wat

er T

rans

fer

CW

C-I

(7)

OG

A F

SE

BA

G C

(Stb

d 1)

A

ir S

ampl

e B

ottle

s C

loth

ing,

Kop

ra

Cre

w P

refe

renc

e, IS

S

Flag

, ES

A

ISS

Foo

d (4

) LI

DAR

w/N

ight

Sco

pe

Man

ifold

, Pro

duct

Tee

R

FTA

Con

tinge

ncy

Hos

e B

AG

D (S

tbd

2)

CW

C-I

(5)

ISS

Foo

d (2

) R

ecyc

le F

ilter

Tan

k

MS

G 0

06 -

STS

-127

MID

DE

CK

STO

WA

GE

UP

DA

TES

EN

D O

F P

AG

E 5

OF

5, M

SG

006

24

Page 26: STS-127/2JA - NASAJul 16, 2009  · In preparation for the FD2 surveys, INCO would like to verify that the VTR is powered on and that its clock is set to GMT time. If required the

MSG 007 - ORB OPS CNTL ACC CHANGES

Due to the launch slips, the Russian vehicle configuration during docked operations is different than documented in the ORB OPS FS. As a result, the following pen and ink changes need to be made prior to docking. Changes are underlined

1

2

. 3

4

5

6

7

8

9

10

11

Note: SPEC 20 updates are not required. Onboard I-Loads are correct for current vehicle configuration. On pages FS3-5, FS3-7, and DAP Config. CC:

DAPs A11, A12, A13, B12, B13 CNTL ACC:

Was: 4(5)2 Is: 2(3)2 (Note: These are the I-load values.) 12

13

14

15

16

17

18

At the bottom of the DAP Table, two changes per line:

Was: 2 CA4 - MT/SSRMS/ICC not at Worksite 8, RS vehicle SM AFT CA5 - MT/SSRMS/ICC at Worksite 8, RS vehicle SM AFT

Is: 2 CA2 - MT/SSRMS/ICC not at Worksite 8, No RS vehicle SM AFT 19

CA3 - MT/SSRMS/ICC at Worksite 8, No RS vehicle SM AFT 20

21

22

23

24

On page FS4-4:

Was: Configuration 1 is ALT PRCS only (Pitch, X=17°)

Is: Configuration 1 is ALT PRCS only (Pitch, X=19°) 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

END OF PAGE 1 OF 1, MSG 007 25