stuck pipe prevention & fishing operations -...

6
Stuck Pipe Prevention & Fishing Operations 12 - 16 Mar 2017 19 - 23 Nov 2017 Dubai, United Arab Emirates This course is Designed, Developed, and will be Delivered under ISO Quality Standards

Upload: lamcong

Post on 15-Mar-2018

384 views

Category:

Documents


18 download

TRANSCRIPT

Page 1: Stuck Pipe Prevention & Fishing Operations - …petroknowledge.com/.../12/Stuck-Pipe-Prevention-Fishing-Operations.pdfThis Stuck Pipe Prevention & Fishing Operations course provides

Stuck Pipe Prevention & Fishing Operations

12 - 16 Mar 201719 - 23 Nov 2017Dubai, United Arab Emirates

This course is Designed, Developed, and will be Delivered under

ISO Quality Standards

Page 2: Stuck Pipe Prevention & Fishing Operations - …petroknowledge.com/.../12/Stuck-Pipe-Prevention-Fishing-Operations.pdfThis Stuck Pipe Prevention & Fishing Operations course provides

www.petroknowledge.com

WHY CHOOSE THIS TRAINING COURSE?

This Stuck Pipe Prevention & Fishing Operations course provides a comprehensive coverage in the industry for understanding and preventing the underlying causes of Stuck Pipe, Wellbore Instability, Loss Circulation, and other sources of non-productive time (NPT) in drilling operations. The course also focuses on correct responses by individuals and teams, early warning signs, and minimizing the impact to drilling operations. Through world-class presentations, practical discussion, and the best reference and instructional materials available, delegates hone their knowledge of basic drilling technology and how it relates to avoiding NPT.

Preventing stuck pipe incidents can save thousands of dollars in non-productive time. Stuck Pipe Prevention covers topics to eliminate or greatly reduce stuck pipe incidents on your rig. This course emphasizes on the prevention of stuck pipe and the team concept is used throughout the course, explaining the contribution and value of every crewmember in the goal of keeping the pipe free.

This training course will feature:

• How to predict and make the contingency plan to prevent the stuck pipe

• How to write the proper report for the stuck pipe incidents

WHO IS THIS TRAINING COURSE FOR?

This training course is suitable to a wide range of professionals but will greatly benefit:

• Mud Engineers• Drilling Supervisors• Drilling Engineers• Tool Pushers• Senior Drillers• Drilling Superintendents

WHAT ARE THE GOALS?

By the end of this training course, participants will be able to:

• Identify mechanisms and risk factors that lead to stuck pipe incidents (Wellbore Instability, Hole Cleaning, Differential Sticking, and Wellbore Geometry)

• Assess mechanics of wellbore stresses and the impact on wellbore stability

• Analyze trends to identify early warning signs of developing wellbore problems

• Implement effective drilling and tripping practices• Makecost-effectivechoicesinplanningfishing

operations

HOW WILL THIS TRAINING COURSEBE PRESENTED?

This training course will utilize a variety of proven adult learning techniques to ensure maximum understanding, comprehension and retention of the information presented. The daily workshops will be highly interactive and participative. The course will include all types of stuck pipe and the recommended procedures for preventing by analyzing the operations, how to free the stuck pipe in case of occurrence, hole cleaning and impacton theproblems,andfishingtoolsand jarenergize.

QUALITY CERTIFICATION

A

PPROVED

P

RO V ID ER

Stuck Pipe Prevention & Fishing Operations

Page 3: Stuck Pipe Prevention & Fishing Operations - …petroknowledge.com/.../12/Stuck-Pipe-Prevention-Fishing-Operations.pdfThis Stuck Pipe Prevention & Fishing Operations course provides

DAY ONE

• Rock Mechanics » Stress –strain diagrams » Geo-mechanics and structural geology » Mechanics and causes of folding » Mechanics and causes of faulting and fractures » Factors affecting the bore hole stability » Induced factors affecting bore hole stability » Drilling fluid effect on bore hole stability » Shale stabilization

• Wellbore Stability » Mechanical conditions » Shale deposition and sedimentary rocks » Clay Chemistry » The Earth’s stresses » Mechanical stress failure » Chemical interactions » Physical interactions » Well site Analysis

DAY TWO

• What is Stuck Pipe? » Primary cause of downtime » See warning signs and respond » Stuck pipe is almost always preventable » Definition » Causes » Mechanical » Formation problems » Human error—lack of communication

• What causes Stuck Pipe? » Human factors » Lack of team work » Lack of communication » Lack of planning » Failure to read warning signs » Failure to follow procedures » Most stuck pipe situations happen at tour

change » Use tour change form to record conditions and

identify trends

• Types of sticking » Formational sticking » Differential sticking » Cause for most stuck pipe situations » Drilling overbalance most common cause » Geopressured formations » Reactive formations » Unconsolidated formations » Mobile formations » Fractured or faulted formations » Mechanical sticking » Key seating » Wellbore geometry » Under-gauge hole » Inadequate hole cleaning » Junk in the hole » Cement problems » Casing problems

• Differential sticking » Definition » Most common in sandstone and high

permeability formations » Why circulate fluids in hole? » Remove cuttings » Seal the wellbore » Control well pressure » Mud formulation » Drilledoverbalanceddefined » Filtercakedefined » Drillstringflexingdefined » Avoiding differential sticking » Rotate » Circulate » Move drill string up and down » Communicate » Differentialstickingdefinition

• Case Histories (workshop)

Daily Topics

QUALITY CERTIFICATION

A

PPROVED

P

RO V ID ER

The PMI® Registered Education Provider logo is a registered mark of the Project Management Institute, Inc.

Clear Concepts. Clean Environment.

Member of

Membership No.: 125094

Page 4: Stuck Pipe Prevention & Fishing Operations - …petroknowledge.com/.../12/Stuck-Pipe-Prevention-Fishing-Operations.pdfThis Stuck Pipe Prevention & Fishing Operations course provides

Stuck Pipe Prevention & Fishing Operations

DAY THREE

• Warning Signs » Threemechanisms—definitionsandcauses » Hole pack off or bridge mechanism » Differential mechanism » Geometry mechanism » Theholeistalking—definitionsanddescriptions » Torque changes » String weight changes » Circulation rate changes » Pump pressure changes » Mud properties » Changes at the shakers » Your records indicate changes » Name the mechanism—simulation » Talk to others around the rig » Gather clues » Come up with a diagnosis

• Prevention plan » Reviewthreestickingmechanisms—definitions

and causes » Differential » Wellbore geometry » Hole pack off/bridging

• Have a stuck pipe prevention plan » Team work and communication » Mud must be ready and conditioned properly

when it returns to the surface » Chemicals and mixing agents must be on hand

to avoid delays » Hydraulics are important » Shaker hand should communicate what’s

shaking to the driller » Mud logger examines cuttings communicate

with the driller• Case Histories (workshop)

DAY FOUR

• Fishing Operations » Twist Off Cases » Fracture of the drill pipe » Fractureofthethreadsjoiningthedrillcollarsor

the drill pipe » Overshot » Free point indicator » Reserve twist » Small explosive charge » Additionofjarsinthefishingstring » Washing over » Plugging the hole » Side tracked hole (dog-leg)

• Broken bit cases » Break away of one of the conical cutters & leg

down the hole with all the bearing » Usingmagnetforfishing » Using hollow basket » Using explosive charge for too large pieces of

metals » Using another bit

• Case Histories (workshop)

DAY FIvE

• Case Histories (workshop)• HSE related issues• General discussion and solving the client

problems

QUALITY CERTIFICATION

A

PPROVED

P

RO V ID ER

The PMI® Registered Education Provider logo is a registered mark of the Project Management Institute, Inc.

Clear Concepts. Clean Environment.

Member of

Membership No.: 125094

Page 5: Stuck Pipe Prevention & Fishing Operations - …petroknowledge.com/.../12/Stuck-Pipe-Prevention-Fishing-Operations.pdfThis Stuck Pipe Prevention & Fishing Operations course provides

Please use BLOCK CAPITALS to fill in this form. It is important that you read carefully through all information before starting to complete the form.

HOTEL ACCOMMODATIONHotel accommodation is not included in the Registration Fee. A reduced corporate rate and a limited number of rooms are available for attendees wishing to stay at the hotel venue.

Please make your request for accommodation at least 3 weeks prior to the commencement of the course.

REGISTRATION FEESUS$ 4,500/ - per participant

This fee is inclusive of Documentation, Lunch and Refreshments

CERTIFICATIONA Certificate of Completion will only be awarded to those delegates who attend the entire course

MODE OF PAYMENTq Please invoice my companyq Please invoice meq Cheque payable to “PetroKnowledge Limited”

WAYS TO REGISTERT: +971 2 5577 389F: +971 2 5577 128E: [email protected]: www.petroknowledge.com

COURSE SCHEDULEREGISTRATION DETAILSFamily Name...................................................................................................................................................................................First Name (Mr./Ms.)...................................................................................................................................................................................Position...................................................................................................................................................................................Company...................................................................................................................................................................................Mailing Address......................................................................................................................................................................................................................................................................................................................................................................Telephone.........................................................................Fax.........................................................................

Mobile.........................................................................Email.........................................................................

“Training & Development Servicesfor the Oil & Gas Industry”

PetroKnowledge LimitedP. O. Box 135120

Abu Dhabi, U.A.E.

AUTHORISATIONAuthorised by...................................................................................................................................................................................Position...................................................................................................................................................................................Mailing Address......................................................................................................................................................................................................................................................................................................................................................................Telephone..........................................................................Fax..........................................................................

Mobile........................................................................Email.......................................................................

CANCELLATIONS & SUBSTITUTIONS

You must notify the Registrar of cancellations at least 2 weeks before a scheduled seminar in order to be eligible for a credit. If you cannot attend, you may send a replacement from your organisation at no charge. There is a $250 handling charge for all cancellations or rescheduling. We reserve the right to cancel a seminar due to low enrolment. All registrants will be notified in advance and a full refund will be provided upon request.

DISCLAIMER

Circumstances beyond the control of PetroKnowledge may necessitate postponement, change of venue or substitution of the Instructor. As such, PetroKnowledge reserves the right to implement such amendments.

Stuck Pipe Prevention & Fishing Operations

12 - 16 Mar 2017

19 - 23 Nov 2017

Dubai, United Arab Emirates

Page 6: Stuck Pipe Prevention & Fishing Operations - …petroknowledge.com/.../12/Stuck-Pipe-Prevention-Fishing-Operations.pdfThis Stuck Pipe Prevention & Fishing Operations course provides

REGISTRATION FEESUS$ 4,500/ - per participant

This fee is inclusive of Documentation, Lunch and Refreshments

MODE OF PAYMENTq Please invoice my companyq Please invoice meq Cheque payable to “PetroKnowledge Limited”

WAYS TO REGISTERT: +971 2 5577 389F: +971 2 5577 128E: [email protected]: www.petroknowledge.com

Other Related Courses To Boost Your Career:

Course & Seminar ListAdvanced Casing Design

Advanced Drilling Best Practices

Advanced Well Completion Design

Advanced Well Integrity Management

Directional, Horizontal and Sidetrack Drilling

In-House TrainingMaximize your training budget and have several members of your staff, who require specific training, to attend with the advantage of not incurring additional travel costs when attending a ‘public’ training courses & seminars.

Would you like a PetroKnowledge training course delivered at a time or location to suit you? Would you like PetroKnowledge to tailor a course from our comprehensive library of programmes? Or would you like us to create an entirely new, bespoke course to suit the exact needs of your organisation?

Working in partnership with our clients, PetroKnowledge provides an enjoyable, creative learning experience that enables participants to develop their skills and knowledge. We can deliver not only generic, off-the-shelf courses from our extensive learning portfolio, but we can provide tailored as well as bespoke learning on any aspect of skill development or knowledge. Our in-house courses are conducted by the same expert trainers who conduct PetroKnowledge public courses so you can be assured they will fulfill the learning objective of any organisation

These will allow delegates to see how courses fit together, identify gaps, and customize their training needs to meet present and future job requirements. Training Managers can use the list of related courses for employees to ensure training progression meets the needs of the organization.

“Training & Development Servicesfor the Oil & Gas Industry”

PetroKnowledge LimitedP.O. Box 135120, Abu DhabiUnited Arab EmiratesTelephone: +971 2 557 7389Email: [email protected]: www.petroknowledge.com