studi koordinasi rele pengaman pada sistem...
TRANSCRIPT
![Page 1: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/1.jpg)
STUDI KOORDINASI RELE PENGAMAN PADA SISTEM
KELISTRIKAN PLTU EMBALUT, PT. CAHAYA FAJAR KALTIM
Oleh: Andi Nur Arief Wibowo2207 100 028
Dosen Pembimbing :1. Dr. Ir. Margo Pujiantara, MT.2. Ir. Sjamsjul Anam, MT.
![Page 2: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/2.jpg)
PENDAHULUAN
![Page 3: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/3.jpg)
Latar Belakang
• Pentingnya koordinasi proteksi pada sistempembangkit
• Setelah diadakan penghubungan denganjaringan sistem kelistrikan Mahakam 150kV, koordinasi rele belum ditera ulang secarakeseluruhan.
![Page 4: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/4.jpg)
Tujuan
• Memberikan gambaran mengenai koordinasisistem proteksi pada kondisi sistem kelistrikanPLTU Embalut, PT Cahaya Fajar Kaltim yang dihubungkan dengan jaringan distribusi 150kV Mahakam.
![Page 5: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/5.jpg)
Batasan Masalah
• Analisa koordinasi yang dilakukan adalahanalisa koordinasi proteksi arus lebih.
• Arus lebih yang dianalisa adalah arus lebihgangguan fasa.
• Simulasi menggunakan ETAP 7.0 dan STAR Coordination Device Protection.
• Studi kasus dilakukan di PLTU Embalut, PT. Cahaya Fajar Kaltim, Tenggarong, Kalimantan Timur.
![Page 6: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/6.jpg)
SISTEM KELISTRIKAN EKSISTING PLTU EMBALUT, PT .CAHAYA FAJAR KALTIM
![Page 7: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/7.jpg)
![Page 8: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/8.jpg)
Single Line Diagram
![Page 9: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/9.jpg)
Generator 1
Ke bebanauxiliary 1
![Page 10: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/10.jpg)
Generator 1 (Auxiliary)
![Page 11: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/11.jpg)
Generator 2
Ke bebanauxiliary 2
![Page 12: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/12.jpg)
Generator 2 (Auxiliary)
![Page 13: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/13.jpg)
Penyulang PLN 150kV
Dari Gen 1 Dari Gen 2
![Page 14: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/14.jpg)
Kapasitas Suplai Tenaga
• Sistem kelistrikan PLTU Embalut, terdiri dari :▫ Generator berkapasitas 2 x 25 MW, Pulverized
Coal▫ Power Grid 150kV PLN, 687MVASc▫ Bus Auxiliary masing masing generator▫ Bus Secondary Trafo untuk starting awal
![Page 15: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/15.jpg)
Kapasitas Beban Terpasang
No LUMP ID Kapasitas Beban(kVA)
1 Load AUX 1 10002 Load AUX 2 10003 Coal Conveyor 1 12504 Water Supply 6005 Coal Conveyor 2 12506 Load ESP 1000
No MOTOR ID Kapasitas Beban (kW)
1 Feedwater Pump 1 4402 Feedwater Pump 3 4403 Forced Draft Fan 1 3604 Fan Mill 1 3605 Fan Mill 2 3606 Fan Mill 3 3607 Circulating Water Pump 1 4508 Circulating Water Pump 2 4509 Circulating Water Pump 3 45010 Fan Mill 6 36011 Fan Mill 5 36012 Feedwater Pump 2 44013 Forced Draft Fan 2 40014 Fan Mill 4 360
•Pada pembangkit memiliki bebanauxiliary berupa beban motor dan bebanlump.•Beban terpasang untuk pemakaiansendiri sejumlah 4850 kVA untuk bebanlump, dan 5590 kW untuk beban motor
![Page 16: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/16.jpg)
Peralatan Rele Arus Lebih
• Peralatan pengaman yang digunakan pada PLTU Embalut adalah :▫ Untuk pengaman motor dan trafo : rele Nari MGT Karena keterbatasan library ETAP 7.0, maka pada
simulasi diasumsikan menggunakan rele Merlin Gerin .
▫ Untuk pengaman penyulang interkoneksi 150kV PLN : Siemens 7SJ46
![Page 17: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/17.jpg)
ANALISA DAN SIMULASI
![Page 18: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/18.jpg)
Analisa Arus Hubung Singkat
• Untuk perhitungan arus Hubung Singkat yang dibahas adalah :▫ Arus hubung singkat minimum (30 Cycle) Untuk arus hubung singkat minimum dihitung pada
kondisi hanya 1 generator bekerja.▫ Arus hubung singkat maksimum (1/2 – 4 Cycle) Untuk arus hubung singkat maksimum dihitung
pada kondisi semua generator bekerja.
![Page 19: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/19.jpg)
Tabulasi Hubung SingkatBus ISC MIN (kA) ISC MAX (kA)
ID kV
BUS GEN 1 6.3 10.23 42.22
BUS GEN 2 6.3 10.23 42.22
TR 1A 150 0.297 3.64
TR 1B 6.3 10.23 42.22
TR 2A 150 0.297 3.64
TR 2B 6.3 10.23 42.22
AUX GEN 1 6.3 5.794 12.82
AUX GEN 2 6.3 5.794 12.88
Bus Conv. 0.38 22.65 34.5
ESP 0.38 21.014 31.67
TO PLN 150 0.297 3.64
BUS 78 150 0.297 3.64
![Page 20: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/20.jpg)
Jalur TipikalTipikal 1 Tipikal 3 Tipikal 2
![Page 21: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/21.jpg)
Eksisting Tipikal 1
Pickup Relediluar kurva
damage
Time delay bersamaan
Isc Max = 31.71 kA
Isc Min= 5.794 kA
![Page 22: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/22.jpg)
RELAY 6112Manufaktur : Merlin GerinModel : SEPAM 1000Bentuk Kurva : SITCT : 200/5
Setting Low Set (I<)Current Set
Dipilih Iset sebesar 0.8In0.8In x 200 = 160A
Time Dial SetWaktu yang diinginkan, td = 0.1s
Setting Rele Tipikal 1
D = 0.11Dipilih time dial 0.2s
Setting High Set (I>)Instantaneous Current Set
Dipilih Iset sebesar 8In8In x 200 = 1600ATime delay = 0.1s
![Page 23: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/23.jpg)
RELAY 6012Manufaktur : Merlin GerinModel : SEPAM 1000Kurva : SITCT : 800/5
Setting Low Set (I<)Current SetFLA total pada AUX GEN = 609.59A
Dipilih Iset = 0.8In0.8In x 800 = 640 A
Time DialWaktu yang diinginkan = 0.1 + 0.3 = 0.4s
D = 0.52Time dial dipilih 0.6s
Setting High Set (I>)Instantaneous Current Set
Dengan memperhatikan kurva STAR ,dipilih Iset sebesar 5In5In x 800 = 4000ATime delay = 0.4s
![Page 24: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/24.jpg)
RELAY 6011Manufaktur : Merlin GerinModel : SEPAM 1000Kurva : SITCT : 4000/5
Setting Low Set (I<)Current SetFLA pada Generator 1 = 2864A
Dipilih Iset = 0.8In0.8In x 4000 = 3200A
Time DelayWaktu yang diinginkan = 0.4 + 0.3 = 0.7s
D = 0.78sDipilih time dial sebesar 0.8s
Setting High Set (I>)Instantaneous Current Set
Dengan memperhatikan kurva STAR, dipilih Iset sebesar 2In2In x 4000 = 8000ATime Delay = 0.7s
![Page 25: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/25.jpg)
Resetting Tipikal 1
0.1s
0.4s
0.7s
![Page 26: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/26.jpg)
Eksisting Tipikal 2
Isc Max = 26.05 kA
Isc Min= 5.794 kA
Setting Pickup d iluar kurva
damageSet Pickup terlalu jauh
Time delay bersamaan
![Page 27: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/27.jpg)
RELAY 177Manufaktur : Merlin GerinModel : SEPAM 1000Kurva : SITCT : 200/5
Setting Low Set (I<)Current SetFLA Trafo ESP = 114.6A
Dipilih Iset sebesar 0.65In0.65In x 200 = 130A
Time DelayWaktu yang diinginkan = 0.1s
Setting Rele Tipikal 2
D = 0.11sDengan memperhatikan kurva STAR, dipilihtime dial = 0.2s
Setting High Set (I>>)Instantaneous Current
Dipilih Iset sebesar 11In11In x 200 = 2200ATime delay = 0.1s
![Page 28: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/28.jpg)
RELAY 6022Manufaktur : Merlin GerinModel : SEPAM 1000Kurva : SITCT : 800/5
Setting Low SetCurrent SetFLA Total Aux Gen 2 = 577.59A
Dipilih Iset sebesar 0.9In0.9In x 800 = 720A
Time DialWaktu yang diinginkan = 0.1s + 0.3s = 0.4s
D = 0.5sDipilih time dial = 0.6s
Setting High SetInstantaneous Current Set
Dengan memperhatikan kurva STAR dipilihIset = 5In5In x 800 = 4000ATime delay 0.4s
![Page 29: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/29.jpg)
RELAY 6021Manufaktur : Merlin GerinModel : SEPAM 1000Kurva : SITCT : 4000/5
Setting Low Set (I<)Current SetFLA Generator 2 = 2695A
Dipilih Iset = 0.8 In0.8In x 4000 = 3200A
Time DialWaktu yang diinginkan = 0.4s + 0.3s = 0.7s
D = 0.80Dipilih time dial = 0.9s
Setting High Set (I>>)Instantaneous Current Set
Dengan memperhatikan kurva STAR, dipilihIset = 2In2In x 4000 = 8000ATime Delay = 0.7s
![Page 30: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/30.jpg)
Resetting Tipikal 2
0.1s
0.4s0.7s
![Page 31: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/31.jpg)
Eksisting Tipikal 3
Setting pickup jauh
dari FLA
Time delay berdekatan
Set Instant kurangoptimal
Isc Min = 0.296kA
Isc Min= 10.228 kA
Isc Min = 0.296kA
![Page 32: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/32.jpg)
RELAY 114Manufaktur : SiemensModel : 7SJ64Kurva : Normal InverseCT : 800/5
Setting Low Set (I<)Current Set
ISC kontribusi Gen 1 pada Bus 78 = 0.296kAFLA Trafo GEN 1 = 121.2 A
Dipilih Iset = 0.8In0.8In x 800/5 = 128A
Time DelayWaktu yang diinginkan = 0.1sISC Max kontribusi Generator 1 pada Bus 78 = 0.499kA
D = 0.01sTime dial dipilih sebesar 0.1s
Setting High Set (I>>)Instantaneous Current Set
Dengan memperhatikan kurva STAR dipilihIset = 1.2In1.2In x 160 = 192ATime Delay = 0.1s
![Page 33: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/33.jpg)
RELAY TR 1Manufaktur : Merlin GerinModel : SEPAM 1000Kurva : SITCT : 300/5
Setting Low Set (I<)Current SetISC Min kontribusi Generator 1 padaBus TR1A = 0.296kA
Dipilih Iset = 0.45In0.45In x 300 = 135A
Time DialWaktu yang diinginkan = 0.1s + 0.3s = 0.4sISC Max kontribusi Generator 1 pada Bus TR1A = 0.499kA
D = 0.22sDipilih time dial = 0.3s
Setting High Set (I>>)Instantaneous Current
Dengan memperhatikan kurva STAR dipilihIset = 0.7In0.7In x 300 = 210A
![Page 34: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/34.jpg)
Pada rele PMT TR1 ini settinginstantaneous tidak dapat diterapkanpada sistem, dikarenakan batasminimum pickup setting Rele yang digunakan (Merlin Gerin SEPAM 1000) adalah 1In. Selengkapnya dapatdilihat di gambar
Rele tidak dapatdiset kurang dari 1
In
![Page 35: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/35.jpg)
Berdasar analisis diatas, maka pada rele PMTTR1 ini dapat direkomendasikan penggantiancurrent transformer, dari 300/5 menjadi200/5. Perhitungan rele setelah dilakukanpenggantian current transformer adalahsebagai berikut
RELAY TR 1Manufaktur : Merlin GerinModel : SEPAM 1000Kurva : SITCT : 200/5
Setting Low Set (I<)Current SetISC Min kontribusi Generator 1 padaBus TR1A = 0.296kA
Dipilih Iset = 0.7In0.7In x 200 = 140A
Time DialWaktu yang diinginkan = 0.1s + 0.3s = 0.4sISC Max kontribusi Generator 1 pada Bus TR1A = 0.499kA
D = 0.57sDipilih time dial = 0.6s
Setting High Set (I>>)Instantaneous Current
Dengan memperhatikan kurva STAR dipilihIset = 1.1In1.1In x 200 = 220 ATime delay = 0.4s
![Page 36: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/36.jpg)
RELAY 6011Manufaktur : Merlin GerinModel : SEPAM 1000Kurva : SITCT : 4000/5
Setting Low Set (I<)Current SetFLA pada Generator 1 = 2864A
Dipilih Iset = 0.8In0.8In x 4000 = 3200A
Time DelayWaktu yang diinginkan = 0.4 + 0.3 = 0.7s
D = 0.78sDipilih time delay sebesar 0.8s
Setting High Set (I>)Instantaneous Current Set
Dengan memperhatikan kurva STAR, dipilihIset sebesar 2In2In x 4000 = 8000ATime Delay = 0.7s
![Page 37: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/37.jpg)
Resetting Tipikal 3
0.1s
0.4s
0.7s
![Page 38: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/38.jpg)
Tabel Eksisting dan ResettingRelay Tipe CT
Ratio
Existing Resetting
Curve Tap TimeDial Inst. Delay Curve Tap Time
Dial Inst. Delay
Tipikal 16112 SEPAM
1000200/5 SI 1.5 1 12 0.1 SI 0.8 0.2 12 0.1
6012 SEPAM 1000
800/5 SI 0.3 2.5 20 0.1 SI 0.8 0.6 5 0.4
6011 SEPAM 1000
4000/5 SI 1.15 3 3 0.5 SI 0.8 0.8 2 0.7
Tipikal 26221 SEPAM
1000200/5 SI 1.2 1 9.6 0.1 SI 0.65 0.2 11 0.1
6022 SEPAM 1000
800/5 SI 0.3 2.5 20 0.1 SI 0.9 0.6 5 0.4
6021 SEPAM 1000
4000/5 SI 1.15 3 5 0.5 SI 0.8 0.8 2 0.7
Tipikal 3114 SIEMENS
7SJ64800/5 NI 1.8 0.35 4 0.1 NI 0.8 0.1 1.2 0.1
TR 1 SEPAM 1000
200/5 SI 0.6 0.4 1 0.4 SI 0.7 0.2 1.1 0.4
![Page 39: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/39.jpg)
Tabel Eksisting dan Resetting (lanjutan)
Relay Tipe CT Ratio
Existing Resetting
Curve Tap TimeDial Inst. Delay Curve Tap Time
Dial Inst. Delay
6011 SEPAM 1000 4000/5 SI 1.15 3 3 0.5 SI 0.8 0.8 2 0.7
![Page 40: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/40.jpg)
PENUTUP
![Page 41: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/41.jpg)
Kesimpulan1. Pada beberapa rele arus lebih memiliki koordinasi
yang kurang optimal, yang sebagian besar padatipikal koordinasi seperti yang dianalisis padatugas akhir ini.
2. Pada koordinasi rele arus lebih, beberapa settingpickup terletak jauh dari Full Load Ampere bebanyang dilindungi. Pada setting time delay adabeberapa rele yang memiliki waktu kerja dekat/bersamaan.
3. Dilakukan beberapa penggantian setelan rele padatipikal yang dianalisa, penggantian yang dilakukanadalah sebagai berikut:
![Page 42: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/42.jpg)
• Tipikal 1 :- Rele 6112 : Tap 0.8In, Timedial 0.2s, Inst. 12In, Delay 0.1s- Rele 6012 : Tap 0.8In, Timedial 0.6s, Inst. 5In, Delay 0.4s- Rele 6011 : Tap 0.8In, Timedial 0.8s, Inst 2In, Delay 0.7s
• Tipikal 2 :- Rele 177 : Tap 0.8In, Timedial 0.2s, Inst. 11In, Delay 0.1s- Rele 6022 : Tap 0.8In, Timedial 0.6s, Inst. 5In, Delay 0.4s- Rele 6021 : Tap 1In, Timedial 0.8s, Inst. 2In, Delay 0.7s
• Tipikal 3 :- Rele 114 : Tap 0.8In, Timedial 0.1s, Inst. 1.2In, Delay 0.1s- Rele TR1 : Tap 0.7In, Timedial 0.2s, Inst. 1.1In, Delay 0.4s- Rele 6011 : Tap 0.8In, Timedial 0.8s, Inst. 2In, Delay 0.7s
4. Pada rele TR1 dilakukan penggantian CT (Current Transformer) menjadi200/5, karena saat digunakan CT 300/5 terlihat kurva terletak setelaharus hubung singkat pada Bus TR1A. Hal ini mengakibatkan rele kurangtanggap saat terjadi gangguan.
![Page 43: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/43.jpg)
Saran
• Pada setting low set (pickup current dan time dial) atau bagian inverse dari kurva relediperhatikan untuk mengoptimalkan koordinasisistem pengaman.
• Dilakukan penggantian current transformer pada Rele TR 1 dan TR 2, agar dapat mendeteksiarus hubung singkat pada bus yang dilindungi.
![Page 44: STUDI KOORDINASI RELE PENGAMAN PADA SISTEM …digilib.its.ac.id/public/ITS-paper-29781-2207100028-Presentation.pdfPENGAMAN PADA SISTEM KELISTRIKAN PLTU EMBALUT, ... • Pentingnya](https://reader030.vdocuments.net/reader030/viewer/2022013114/5d41d84188c9934b018c47c5/html5/thumbnails/44.jpg)
Terima Kasih