sub assembly verification presented by j.venkatesan date : 06.11.08

13
Sub Assembly verification Presented by J.Venkatesan Date : 06.11.08

Upload: rania

Post on 06-Jan-2016

27 views

Category:

Documents


0 download

DESCRIPTION

Sub Assembly verification Presented by J.Venkatesan Date : 06.11.08. Serial No & Subassembly verification. Applicability: Only SVC’s where WFM is accessible. Process - Subassembly verification. Go to the link given by Arup.. https://houprp.cce.hp.com/estwd/tracking/ - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Sub Assembly verification Presented by J.Venkatesan Date : 06.11.08

Sub Assembly verificationPresented by J.Venkatesan

Date : 06.11.08

Page 2: Sub Assembly verification Presented by J.Venkatesan Date : 06.11.08

Serial No & Subassembly verification

• Applicability:– Only SVC’s where WFM is accessible

Page 3: Sub Assembly verification Presented by J.Venkatesan Date : 06.11.08

Process - Subassembly verification

• Go to the link given by Arup..– https://houprp.cce.hp.com/estwd/tracking/

You will get the following screen

Page 4: Sub Assembly verification Presented by J.Venkatesan Date : 06.11.08

Process - Subassembly verification

• Go

Page 5: Sub Assembly verification Presented by J.Venkatesan Date : 06.11.08
Page 6: Sub Assembly verification Presented by J.Venkatesan Date : 06.11.08

If CT no is not matching ??

• Transfer the Main case to bin ..

IND_CR CT#VERIFY

As shown in next slide

Page 7: Sub Assembly verification Presented by J.Venkatesan Date : 06.11.08
Page 8: Sub Assembly verification Presented by J.Venkatesan Date : 06.11.08

Code-usage

Sl No Category Code1 Named A/c A012 Part replaced earlier A023 Reverse checking found valid A034 Data Not Available A045 TCE reasons A056 CT# match - Bench A06

Approved

Sl No Category Code1 CT # verification failed V012 Physicall Damage V023 Serial number Tampered V034 Customer not available/ Incomplete info V04

Void

Sl No Category Code1 OOW Q012 Internal Unit Q023 Carepack/contract Q03

Others(Despatch to cmg)

Page 9: Sub Assembly verification Presented by J.Venkatesan Date : 06.11.08

Codes to be used in WFM

• Where to put this code ??– Next slide you can see the WFM screen shot

on where to put this code.

Page 10: Sub Assembly verification Presented by J.Venkatesan Date : 06.11.08
Page 11: Sub Assembly verification Presented by J.Venkatesan Date : 06.11.08

Current Status

Slno Partner Name Location PAM Current Status Date of implementation1 Enn Ess Bangalore J.Venkatesan Implemented 3-Nov-082 Maha Electronics Bangalore Sukesh Singh Implemented 6-Nov-083 Maha Electronics Chennai Manoj K Prasad Implemented 10-Nov-084 Maha Electronics Hyderabad Sathis Kumar Implemented 6-Nov-085 RT Outsource Chennai Manoj K Prasad Implemented 6-Nov-086 RT Outsource Delhi Meena Tutu Implemented 12-Nov-087 RT Outsource Kolkata Debasis Maity Implemented 5-Nov-088 Simtech Mumbai Sanjay Raut Implemented 10-Nov-08

Implementation of Sub Assy Verification at Bench SVCs

Page 12: Sub Assembly verification Presented by J.Venkatesan Date : 06.11.08

Q & A

• Any questions

Page 13: Sub Assembly verification Presented by J.Venkatesan Date : 06.11.08

Thank you