. GMR Energy GMR Baioli Holi Hydmpower Priydte Ljmited old tldaan Bhawan 2nd floor, Terminal - I lGlAirport, Palam New Delhi-110037 | +91 II 47157625 F +91 rI 4716s722 w www.gmrgroup.in Ref. No. - GMRr/ BH1201711212889 Date - 1811212017 The Additional Pr. Ghief Conservator of Forest Ministry of Environment, Forest & Climate Change, Gol Central Regional Office, Pearson Road, FRI Campus P.O. New Forest Dehradun Uttarakhand - 248006 Sub: GMR Baioli Holi Hvdro Power Pvt. Ltd. (180 MW). District-Chamba. Himachal Pradesh -Environmental Clearance Compliance Status Ref: MoEF Approval Lefter No. J-'l2O1l/86/2007-lA.l Dt 24s Jan 2011 Dear Sir, Bajoli Holi HE Project (180MW is under execution by GMR in District Chamba, Himachal Pradesh. Environmental Clearance from MoEF, GOl, Delhi was accorded on 24th Jan 2011. As per the condition no. Vl (General) and 13 of the clearance letter, please find the point wise haff yearly compliance report (from April. 2017 to Sep., 20'17) is attached herewith as annexure - I'please. Yours faithfully, For GMR Bajoli Holi Hydro Power Private Limited g4t','1 , (S. P. Bansal) Chief Project Officer Encl: As Above Copy to: 1 . Ministry of Environment, Forest and Climate Change Indira Paryavaran Bhavan Jorbagh Road New Delhi - 110 003, INDIA Page 1 of2 Regd. offlcel Karthik House, vjllage Kuleth, sub Tehsil Holi, Tehsil tharmou r, , chamba 176309; Himachal Pradesh Airports I Energy I Highways I Urban Infrastructure I Foundation

Upload: others

Post on 22-Jan-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Sub - GMR Group · Environmental Clearance from MoEF, GOl, Delhi was accorded on 24th Jan 2011. As per the condition no. Vl (General) and 13 of the clearance letter, please find the

. GMR Energy

GMR Baioli Holi Hydmpower Priydte Ljmited old tldaan Bhawan

2nd floor, Terminal - IlGlAirport, Palam

New Delhi-110037

| +91 II 47157625

F +91 rI 4716s722

w www.gmrgroup.in

Ref. No. - GMRr/ BH1201711212889

Date - 1811212017

The Additional Pr. Ghief Conservator of ForestMinistry of Environment, Forest & Climate Change, Gol

Central Regional Office,

Pearson Road, FRI CampusP.O. New Forest DehradunUttarakhand - 248006

Sub: GMR Baioli Holi Hvdro Power Pvt. Ltd. (180 MW). District-Chamba. HimachalPradesh -Environmental Clearance Compliance Status

Ref: MoEF Approval Lefter No. J-'l2O1l/86/2007-lA.l Dt 24s Jan 2011

Dear Sir,

Bajoli Holi HE Project (180MW is under execution by GMR in District Chamba, Himachal

Pradesh. Environmental Clearance from MoEF, GOl, Delhi was accorded on 24th Jan

2011.As per the condition no. Vl (General) and 13 of the clearance letter, please find the point

wise haff yearly compliance report (from April. 2017 to Sep., 20'17) is attached herewith as

annexure - I'please.

Yours faithfully,

For GMR Bajoli Holi Hydro Power Private Limited

g4t','1 ,

(S. P. Bansal)Chief Project Officer

Encl: As Above

Copy to:

1 . Ministry of Environment, Forest and Climate Change

Indira Paryavaran Bhavan

Jorbagh RoadNew Delhi - 110 003,INDIA

Page 1 of2

Regd. offlcelKarthik House, vjllage Kuleth,

sub Tehsil Holi, Tehsil tharmou r,

, chamba 176309; Himachal PradeshAirports I Energy I Highways I Urban Infrastructure I Foundation

Page 2: Sub - GMR Group · Environmental Clearance from MoEF, GOl, Delhi was accorded on 24th Jan 2011. As per the condition no. Vl (General) and 13 of the clearance letter, please find the

@.R

2. Member SecretaryCentral Pollution Control Board,

Parivesh Bhawan, CBD-cum-Office Complex East Arjun Nagar,

DELHT - 110 032,

INDIA

3. Member SecretaryH.P.State Pollution Control Board

"Him Parivesh", Phase-l ll,

New Shimla-171 009.

Page 2 of2

Page 3: Sub - GMR Group · Environmental Clearance from MoEF, GOl, Delhi was accorded on 24th Jan 2011. As per the condition no. Vl (General) and 13 of the clearance letter, please find the

(o

o

o.)OD(!

o

o

F

N

o

t\

N

iL

o-(,

o

C'o

|!

3

ao

IJJ

o

o

o

oCL

cI

!

_o

o)

o

I(9

)

o0,,

U-

oooo

'6

3

(oc!c(u-(gC-osonrriLllO

ooJ ii! o.)

.w c)

3E>o_oc(l'_5a

,i' - .Yv)t:

irOJ-

.g^i?i-o0-r (o>-C.O!=oF.t(U

e .: j=_!;6

T:.'i oobt.=tr!PN0J

= o-ry o X YE<P9j:o_E;3^i€.;

-r o)_:- q

oa>d.;

91 (!6.=

bbO(qo.,

€ s >lc;'=:?3E.'c,:: ,.,,| { }1

E o io -Ptie!-o-=(oo-I : U aod

- L Ltrd

6O(l.)<'rlE ',= >

^- ;

-c (D o=X

^':L='-=.!lo'=-o.o:=,j:Fe<';r9O(oCEE:o-9,ts(o+N-oEc:; g;.9:.q9=6ooq=.=vt

:: > Y IF-^:i=O:=:=(J

tt

I

o

=

(u

oo-

@o)

(o

so-

c,c

C, vtF(g

o)

(l) ,^<.=

EC

_qo

g3oJ_>Y

(!

*cco9

j-: ;<*5:63ia6EcQ-,9 orfiie'0'6 l,/t

L qr ;l@-o L

I! (E

.oE9^-oo

:>o c6.o9

.!!;-

c,wd)-= : 9 .,g.#F-c Y .. o36FE,?= a:a 3 aE-Y:v3:;P=,rE^.FA E.Xq:d0J6gerE FIc I EU=s.,6(o >d 9?,=-^u d xq'=c.=x!: !!-g-.=x

&o9;crPi -=:uL:

5 t "; -o

(o" ? Oc9-E;

z

1\

h{'tt\=!:.'-'\

Page 4: Sub - GMR Group · Environmental Clearance from MoEF, GOl, Delhi was accorded on 24th Jan 2011. As per the condition no. Vl (General) and 13 of the clearance letter, please find the

LO

Nc)oo

1,\

\\

+\E.-

F

N

F

N

ts

IE

t!q)

o

uJ

ec.g

E

I

Zi ; ;=;f ;;==epHeE 3!E E F€E

r; € ! € 5 F-; E; E 5 ;E

=i*= l;

ge EIi+i;tllcg:Ef,;gi;iIt i=le

=i;gl:;;,= ;aE;ii

ec E;e:IEE;cqiEE;!;i€s1! rs:tE=tE;r;e€t;;:!s;i :'c ;;iFeet;;F; irEt a;i"; : rp.g:; i:q3:; ' 56 E E d r

€; aE F=* - *E;:E:=E ; HI'F;E E= : ; :: ; $:";€ E;: g::n;E:ig E}!; i5E ; * E; H$:F E$[E : ; E

* 3:e E; g ;H$:;E ;E: i g 3IE: s

o,

o(o

(.)a-

.9

E

(u

(o

o,)

oz

(J

(l)

o: >o o_ou(o_c().:J ; _. ! Or;9.Q7-uqXu E c+ 6oo(E o 5 *codroFo.r'=:n >-a PUi oG FoFc;P: (g;.9iP::Iin-oo rE oz "l.-,^,^.1 >,

^^ij;c.rc:'=f 3e 9;;=YPor,:-=!EoJ L- o 9 lE

! o = bD- dHl6.E=2Eo:s.99E E 3ae I'F E!;i'^oc: >- c F!E=!P09u --. tr(')

=o!a-Xo^;:c1!(J(J-

t (o; F ai:9; .iEfEooJc):ro

-=F.-Y4y=q.r=_q)ts,:59FE

3o

c

qr-

^qr^ P

:lo

ov^. l

'5scoLrl O)

oz

Page 5: Sub - GMR Group · Environmental Clearance from MoEF, GOl, Delhi was accorded on 24th Jan 2011. As per the condition no. Vl (General) and 13 of the clearance letter, please find the

(o

obo

o_

-{

t\

N

(u

t\

N

o,

oCL(u

l!

-}(!o

=t

B5@

o

CIco

o

q,

t!CL

E

I

< oi

F -.,\EE6o4oJ

ECOJ

.9qrl!^ oo lrJ

tE>(9>qHod=

P{= >

o {J a,rr- !! i

';vor: -->.:l ij o-9qJO: -!

33bOcod

o

3'Ez

(,xr'-- at>0i >-=

o.9p{oJ>-(LJo

>lf = >:!l,>

- c;..1-h E -";ir F

:(! C-r'o! - o

c; "

.i'6*XE.

': Ei >-

6 3i.,di:>"ii

dn d >E >.: -:PEEF ,= f ,',1

o.2o

c)

_c

=5c

o-co

o

.e

o

o

;o)

Cc)C

coCo

>. ::-o si!qJ

aool.(EE

U;

3f6a

'o =,:

9J -(J

,:l3O

; bo.=G, -y. tro- :t:.,e, 2. > ;

>6>9

E

>.!/

-d.cco)

.Y '-H! q

d =>

xJ6jNc-i:l*3n=(J\= >>-.o Q

out o;oPU.oo>c<:r;(9 .oi

cN o

E.-oc>c)

^= (./'

o-is(l)o

o

oI

q,CL

oNool>-o< |.- <l ;i <lJ

c o Hl iE'- 0r x=:U.E 3;! >oo X

-X_oN-:5': -.ts E:,,*'-.e:-.= 6

=C,-Y: aE;"*,i =; >

6 >: : E

E=oJI,=

P,9 b B:c 9= (J(oc9(l)c>'---c9- ! oJ ,^ eo.9 b6.-==.-r*iiF.-o-dFior:!l9d o i q6.=;921

"__ELrii:i: o- -> U'F 6 ep=t:d5.=.--6--!a5=cEo5

^:9.1 =inE;;f,=

o- -' bo c)

2:.=;

9FXo.,E(!coroY

o- g; oO -i: X-c::=i:(,

13 - oC

Ii:o.r!o=fg

6.9 -c 6UPYIE

99= to c,;: c *:= X

53-€Hcd = 9:;

in1-5:I srE+ E

E=E:0,o",oo":t- c o,):

-c = >= Y.e_E.9HEr!o\r,i:c

c)(E

I<u

IOJ

,9o

-c.9p-cgt^

-oJ

:>c6.9-5P-olEi

-co35t4!E.9

j-

-=-c o)

<E

rE == b-6",E38=+; >,! F -:-^-e--:z.:-6FPc9?*,E6.i.9;i!;"Ec:8,!-4.::-ot:_:-

t::'1 :tx=:E.!!o:?.!!;;I!:o"!-.-;= (/l ql+E6jESrEEoi; slE- E: r:OoJ\.!rf,i

P:r>.=_OC;s! c!- (o <

SeliE,rg;Plo.:-:1fi r o:E E glE (E! ! c X;O- ,^ 0,, r? L

= ;;

FEQ-co6XlH ; !a -Y -

(J;- v (o c .. --o99i-=E9c.= -S o oJ X(!oors?!1-l:

: =

F N g o;.ia;:.1 gtsr!-:z:-.D:-p 3 6i oi._e 3EE:iEsH:0rX-YL;-

Ytro 6 6or;--!?oD6 P 't3 -I = ia6d i d g;i F or'68 o)(g - ! >- IH r'< -N i5e : 3 "i aE6,sb&e:E:EE::o>o:€Y^::C\,t=_

:€E:igfiQ:; c

=9 .rt :Yl -qxs-u:"--.o(o,Yiit E d 3 !oo!E!i-€3sEI-^9-Jtr a

o -.!E i:tc:tGgv..l- F <D O,P -.= 6 : o6>tE.iu!dqr^"P?F* R0.<*3H.=: >! -59;!_Eg

z

Page 6: Sub - GMR Group · Environmental Clearance from MoEF, GOl, Delhi was accorded on 24th Jan 2011. As per the condition no. Vl (General) and 13 of the clearance letter, please find the

(o

q)oo

Q,\

=L\c5.'-'

t\

N

(u

F

N

tCLo

o

->(!q,

=l!

3

@

UJ

t!o

o

()

l!

coL'

'F

c

OJ

!

.9

oo

-o

!o)

00

!(u:oc

6I(J

dJ

o

I

-c

q)

.9

.9

=

=(oo<>c

vF;>'t

.c?

>lJ

QC)

-c:

>-=

=,FU

oc(J O-

=r!.go)o, -c

(!c

EEeE ie.=oi.= c-

oJ= I

,i (o c(lJ-o,)oocil

xlE!!6orXLC-

_ rO .:! ooE,t .: o

-(,/t o

-o(l)c

b:Fd9.g1(,++

o).=

(o

(u

o!oo

.=

-a.9

o

o

=

oa-=

{,)

d)

(o

.9q)

Eooc:Eo(L)

d

(u

;(!

Io(,cri

o<l)

=5oo

o

.9

(JI

ov

-arc

9:oozo

oa

cc)

C

!

o

OJ

o

;'to-.9

o

o

CJ

! r'i

zd

c)

E

o

oo.E

=E-o

E

=oooEc

ECJ

z

()

q,CL

>o c c:

ii ' c,EZ! o-9 qr'-_9-eu)_

-c XE >-P

;s.; F 3o-*oJ=!coj>.E'-iE6>>' ! OJ CJ O,)

F (5 a- =.=

=-c o y P

ii- I a9r, T, -92c>.qrdr

!(uoJ.:>:9qr",-(, -; x!l1(l)<D;j=!/

" ^ ue Fqi qr F &:--O: ^h 6_ r;acqn9?.-.;qr 9;;; s(Jbo-..=fo:

sn E e U E

X;9rh-.ioruhil'1: P >i E -0.rg;-Ya9fr9qJ>ori-: o<:!

I(!Q,)

q)(9

Yi

0., P

I-!E cJ

o-, 6'

E(l,Jlo

--OXYqr=5>EF?

6ool

a -E

lE.-F

f, tobtu oo=<dJ.:

!o

io)o)

,E3

EH9o ;'i d,J

OJ!PQ-Cr-o>i

-o (, -rlq;

es ^e

&e#";!

f>-9}U

E:i(o

6ti

YJ- =

.=

EEY.=--_: E\^FO)

=x""-o >- :'

=v;<!-a

! vi -9

E aEd:Ed !=

* f .!oo iIo?

'i ooit= >-r==!- Pqo on o-

iXe

{sEc

.9;3=u--

i- O 0.,

cZ oo

.Y-iXP.g lo -

;i (g c (E

o)

o o,)

00!

-oD

-a-. oD

E;rP_o

o)

EE

c

(l)

(,)

.=E

:t-oo

9.-i:Eoto

>.9--naqE.-.x:

oz oz

Page 7: Sub - GMR Group · Environmental Clearance from MoEF, GOl, Delhi was accorded on 24th Jan 2011. As per the condition no. Vl (General) and 13 of the clearance letter, please find the

to

OJoo

d-

11 \€l_ \+-/*

!(,)

c(u

EIa-

.E

.92

tiooz

o

c

OJ

'iioo

(!J

9"4

^,F;ts-c-qr 't>c'aN"'t

T;>- .9(o,^>imiooPo)ld: (-?

ze

o6.o)E

o(ua-

(,)

-c

.=ooo

.9d,

o,)

F!o)

z

o)(!co

!c,)

c)

Ec

!<l):q.)

OJ

a0,,

_c

cc.9

(J

(E.

.q c,;Ntr>d>

o

(o l,'l

.: oJ'60

;,>;3co

c.^

c9(L)(!c-cO(J

c(!

cl'E-

E>

-.: o)

.9roCLL

CJ JY

t\

N

OJ

F

N

o.

oo-.J

C,

->C,o

=t!

=

UJ

6o

t!

o

t!o.Eo

-c==c)

>t

(oo-OCY

F-=.nLI

9z IoJoo

==9^>:'6cZl!)-;.

q,= F >lie9o.tii -!. xE

l6^Lr! (o -o

= -:,v

9t:-l,6aiz J- u

c).=

E

==o)'-a-

OJ

o,)E

oOJ

a-o

o)-c

.goo!

o-(L)(E

.^ 99?;i .: =

PPE!;;9s..-co-!n;-cl=-y^-: Y !:X=:=: =;ipEE;E,v':E9>9: ot:;F.'ETi6,ic,E

=*-E*E:jjPij(,E oE Fa

6 E.0+:; >.: F Iv i /. .= 9-m6iY",'= a *.=:

YYf,(-J-(,:(uqc

::EE,9^E:. d,

=E--.qEE>^-} E o Xi-:L:Pc

,= or (rr (o I

>Eg:ior-6n.r.9f;E:3

oOJ

(o

(u

E}a-+o

;!-r5

oe

lE9l

-c

@0Jc.9

qJE

:qJ.2=

rs .g

:: l 0.,

gE o)

e6 =ag- 3

€8rE6.+s 3e-9 > or

;=c".",>.t0rnb*3=(ECi9€ (o c

b3d---a=Z.Y9N.Gg-E;filu >- - ;

u E-o I:dE;.::::o E x=do* (u

o:ro!4< u9;

c(lJ

C

a-

a-<lJ

Eo

q)

q)

i=-o

3OJ

-c

_o

I

c)

q)

o

I

c

oa-oo

o

(J

q,)

-f(lJ!_c i

9L or

' Y€

I Fo!t*e:, ro -\

-of

',. .; o

6oc

-. - >-.9u 5.= ts

o ji j: 6'

;tr.Y.-'-.:l

= a=

t,tr-Yv

tr:v=

ctsc.=FP.v 11 >O,9qf,o?6E;E-

od

i

o3

=o=

M(E

>o-

o-r .E

3fi

:(,

boOJ

E(u

E

o

co

o

(lJ

EOJ

E.E

=Eoo-OJ

cs

CL

-!lEC)

;OJ

99

{FOococ

-q)

o, -o

->-'L9

>fQ-

d7 0

(ubo!

-oc)

.=

(o

ooN

o(o

o

E

'6o

Page 8: Sub - GMR Group · Environmental Clearance from MoEF, GOl, Delhi was accorded on 24th Jan 2011. As per the condition no. Vl (General) and 13 of the clearance letter, please find the

(o

(0@oo

\\

a,- \S--t'

t\

N

o

F

N

o-

o-(u

o

->a!o

=t!

3

@Fl

UJ

o

o

c(,

Pir €=+ F- :.? .= q)

= 6i o>9!

FcE ';o hi .E

J5 -, Oa-0J:

>iic !l qF dg5, s h:

I P i.3;9:3xq-=o*!uuEz9i:fr-cPvr..Ee.=S.-mDD-/

;<-:!

.qPE.=.;q.E =; by - ""-:E e i't E

>=d'(u-]x<t.c (o P Fl

+.s =: ts 3=

.-r ! i'i >- NEs.;= 3+(Jc{=5(JF\

o-

=>tsq

o.9-6z>-_o -Y C-m

.ibg'==rY: r.r v.l

F>=>! qo

=:.=lEi(u

9P(9 o

". >(!Y=6

oots *.E3bE93

-;o(o(!c

z<-a

I

o)o.

-F+E-9_i P.: iL+:.=

= .=

o-Yq!.,fc

$; € E E iEEtg9E=eC(oO^,U.-'9rAE=tr:qE€:#:!: E lE i

= i

.=e=5*Egx;IE;=fiEEiEeH=5:€;E*:;3mEi-r:-*:Fs*E;95sliE^e;:*s H Ht:9EndEEP:q;!EE*Ec993Fx >n ! h > -

#E-#€g;

F= .E

E,tco- P qru

; g;H^::^ "X=:= o)

d9 9,92.-;,oi o >.Y

-:6U-:_ o

l(J 3 Y.= t! ,^ .'

d.o.:l+

;orgui5< 91

- v -=eu=:

X -.E Fa.q -;o; F.=^: -E U--Foc<9l -P or.5: E.= P

q')!;i:*ar

Ei;Eg=oz N

Page 9: Sub - GMR Group · Environmental Clearance from MoEF, GOl, Delhi was accorded on 24th Jan 2011. As per the condition no. Vl (General) and 13 of the clearance letter, please find the

Sample ID:47553 - Analysis Completion:03/10/2017

Power generation plant [except Wind and Solar renewable power

plants of all capacities and Mini Hydel power plant of capacity <25MW] /

LAB Inward : 6405

ANALYSIS REPORT FOR AIR

TYPE : Ambient

Himachal State Pollution Control Board

Dharamshala

Him Agrico Building, Jachh

Dharamshala, Distt. Kangra

Dharamshala-176215

Tele:01893226368

: AIR-Air Act(Legal) , (Insp Type : ROU-Routine Visit)

: Parveen Kumar Dhiman,JEE

: 10/09/2017, (0910 to 1330)

: 12/09/2017 & 03/10/2017

: # Ambient Sampling Point ~ Near Dam Site (180 MW HEP)

: Electricity

: Ambient Air

: MGF---429

: --- & Volume-Absord Media : Avg. Flow Rate: 1.21 m3/min

: 314

: 1 & Oper Time(Min) : 260

3. Nature of Sample

4. Sample Collected By

5. Date & Time of Collection & Receipt

6. Date of Start & Completion of Analysis

7. Sampling Point

8. Fuel

9. APCM

10. Filter No & Weight

11. Temperature on Collection

12. Volume-Gas Passed

13. Parameters

Range of TestingTest MethodSr ResultUnitParameter

---R.S.P.M 1 71.0 µg/M3

1. Name &

2. Address of the Unit

: Bajoli Holi Hydro Electric Project (180) - 20309

: -,GMR Bajoli Holi Hydro Power Pvt. Ltd.,Kartik House, PO-Holi, Tehsil Bharmour, Distt-Chamba

Holi - 176309,Taluka : Bharmour, District : Chamba, GIDC : Not in Any SIDC

06/10/2017

Dr. Ramakant Awasthi,SO

Laboratory Remarks : EMP Project Sample. By:22-lab_22 Dt.: 03/10/2017

n i c

Field Observation : under construction hep

Page 10: Sub - GMR Group · Environmental Clearance from MoEF, GOl, Delhi was accorded on 24th Jan 2011. As per the condition no. Vl (General) and 13 of the clearance letter, please find the

Sample ID:47552 - Analysis Completion:03/10/2017

Power generation plant [except Wind and Solar renewable power

plants of all capacities and Mini Hydel power plant of capacity <25MW] /

LAB Inward : 6404

ANALYSIS REPORT FOR AIR

TYPE : Ambient

Himachal State Pollution Control Board

Dharamshala

Him Agrico Building, Jachh

Dharamshala, Distt. Kangra

Dharamshala-176215

Tele:01893226368

: AIR-Air Act(Legal) , (Insp Type : ROU-Routine Visit)

: Parveen Kumar Dhiman,JEE

: 09/09/2017, (1320 to 1740)

: 12/09/2017 & 03/10/2017

: # Ambient Sampling Point ~ Near Adit-2 (180 MW HEP)

: Electricity

: Ambient Air

: MGF---428

: --- & Volume-Absord Media : Avg. Flow Rate: 1.23 m3/min3

: 319

: 1 & Oper Time(Min) : 260

3. Nature of Sample

4. Sample Collected By

5. Date & Time of Collection & Receipt

6. Date of Start & Completion of Analysis

7. Sampling Point

8. Fuel

9. APCM

10. Filter No & Weight

11. Temperature on Collection

12. Volume-Gas Passed

13. Parameters

Range of TestingTest MethodSr ResultUnitParameter

---R.S.P.M 1 85.0 µg/M3

1. Name &

2. Address of the Unit

: Bajoli Holi Hydro Electric Project (180) - 20309

: -,GMR Bajoli Holi Hydro Power Pvt. Ltd.,Kartik House, PO-Holi, Tehsil Bharmour, Distt-Chamba

Holi - 176309,Taluka : Bharmour, District : Chamba, GIDC : Not in Any SIDC

06/10/2017

Dr. Ramakant Awasthi,SO

Laboratory Remarks : EMP Project Sample. By:22-lab_22 Dt.: 03/10/2017

n i c

Field Observation : under construction hep

Page 11: Sub - GMR Group · Environmental Clearance from MoEF, GOl, Delhi was accorded on 24th Jan 2011. As per the condition no. Vl (General) and 13 of the clearance letter, please find the

Sample ID:47549 - Analysis Completion:03/10/2017

Power generation plant [except Wind and Solar renewable power

plants of all capacities and Mini Hydel power plant of capacity <25MW] /

LAB Inward : 6401

ANALYSIS REPORT FOR AIR

TYPE : Ambient

Himachal State Pollution Control Board

Dharamshala

Him Agrico Building, Jachh

Dharamshala, Distt. Kangra

Dharamshala-176215

Tele:01893226368

: AIR-Air Act(Legal) , (Insp Type : ROU-Routine Visit)

: Parveen Kumar Dhiman,JEE

: 08/09/2017, (1300 to 1730)

: 12/09/2017 & 03/10/2017

: # Ambient Sampling Point ~ Near GMR Colony cum office complex.

: Electricity

: Ambient Air

: MGF---425

: --- & Volume-Absord Media : Avg. Flow Rate: 1.21 m3/min

: 326

: 1 & Oper Time(Min) : 270

3. Nature of Sample

4. Sample Collected By

5. Date & Time of Collection & Receipt

6. Date of Start & Completion of Analysis

7. Sampling Point

8. Fuel

9. APCM

10. Filter No & Weight

11. Temperature on Collection

12. Volume-Gas Passed

13. Parameters

Range of TestingTest MethodSr ResultUnitParameter

---R.S.P.M 1 37.0 µg/M3

1. Name &

2. Address of the Unit

: Bajoli Holi Hydro Electric Project (180) - 20309

: -,GMR Bajoli Holi Hydro Power Pvt. Ltd.,Kartik House, PO-Holi, Tehsil Bharmour, Distt-Chamba

Holi - 176309,Taluka : Bharmour, District : Chamba, GIDC : Not in Any SIDC

06/10/2017

Dr. Ramakant Awasthi,SO

Laboratory Remarks : EMP Project Sample. By:22-lab_22 Dt.: 03/10/2017

n i c

Field Observation : under construction hep

Page 12: Sub - GMR Group · Environmental Clearance from MoEF, GOl, Delhi was accorded on 24th Jan 2011. As per the condition no. Vl (General) and 13 of the clearance letter, please find the

Sample ID:47544 - Analysis Completion:03/10/2017

Power generation plant [except Wind and Solar renewable power

plants of all capacities and Mini Hydel power plant of capacity <25MW] /

LAB Inward : 6396

ANALYSIS REPORT FOR AIR

TYPE : Ambient

Himachal State Pollution Control Board

Dharamshala

Him Agrico Building, Jachh

Dharamshala, Distt. Kangra

Dharamshala-176215

Tele:01893226368

: AIR-Air Act(Legal) , (Insp Type : ROU-Routine Visit)

: Parveen Kumar Dhiman,JEE

: 07/09/2017, (1000 to 1400)

: 12/09/2017 & 03/10/2017

: # Ambient Sampling Point ~ Near Power House Site (180 MW HEP)

: Electricity

: Ambient Air

: MGF---419

: ---- & Volume-Absord Media : Avg. Flow Rate: 1.21 m3/min

: 290

: 1 & Oper Time(Min) : 240

3. Nature of Sample

4. Sample Collected By

5. Date & Time of Collection & Receipt

6. Date of Start & Completion of Analysis

7. Sampling Point

8. Fuel

9. APCM

10. Filter No & Weight

11. Temperature on Collection

12. Volume-Gas Passed

13. Parameters

Range of TestingTest MethodSr ResultUnitParameter

---R.S.P.M 1 27.0 µg/M3

1. Name &

2. Address of the Unit

: Bajoli Holi Hydro Electric Project (180) - 20309

: -,GMR Bajoli Holi Hydro Power Pvt. Ltd.,Kartik House, PO-Holi, Tehsil Bharmour, Distt-Chamba

Holi - 176309,Taluka : Bharmour, District : Chamba, GIDC : Not in Any SIDC

06/10/2017

Dr. Ramakant Awasthi,SO

Laboratory Remarks : EMP Project Sample. By:22-lab_22 Dt.: 03/10/2017

n i c

Field Observation : under construction hep

Page 13: Sub - GMR Group · Environmental Clearance from MoEF, GOl, Delhi was accorded on 24th Jan 2011. As per the condition no. Vl (General) and 13 of the clearance letter, please find the

Sample ID:47557 - Analysis Completion:03/10/2017

ANALYSIS REPORT FOR

WATER / WASTE WATER SAMPLE

Power generation plant [except Wind and Solar

renewable power plants of all capacities and Mini Hydel

power plant of capacity <25MW] / LAB Inward : 6409

Himachal State Pollution Control Board, Dharamshala

Him Agrico Building, Jachh

Dharamshala, Distt. Kangra

Dharamshala-176215

Tele:01893226368

TEST REPORT

Test Report No. : 6409 Date: 03/10/2017

3. Nature of Sample

4. Sample Collected By

5. Quantity of Sample Received

6. Code No. of the Sample

7. Date & Time of Collection & Inwarding

8. Date of Start & Completion of Analysis

9. Sampling Point

10. Flow Details (Remarks)

11. Mode of Disposal

12. Ultimate Receiving Body

13. Temperature on Collection

14. Carboys Nos for

15. Water Consumption & W.W.G (KLPD)

1. Name of the Customer

2. Address

Range of TestingTest MethodSr ResultUnitParameter

---Suspended Solids 1 1.0 mg/l

--- 2 8.5 mg/l

--- 3 3.0 mg/l

---

--- 5 8.32

: WAT-Water Act(Legal), (Insp Type : ROU-Routine Visit)

: Parveen Kumar Dhiman,JEE

:

: 47557

: 11/09/2017 , (0940 to 0940) & 12/09/2017

: 12/09/2017 & 03/10/2017

: Bore Well Near Dam Site (180 MW HEP) ~

: Bore Well

: Bore Well

: ravi

: --- & pH Range on pH Strip :6-8

: 14 & Color & Appearance :Slightly Turbid

: Ind :6000.000 , Dom :5.250 & Ind :0.000 , Dom :4.280

: Bajoli Holi Hydro Electric Project (180) - 20309

: -,GMR Bajoli Holi Hydro Power Pvt. Ltd.,Kartik House, PO-Holi, Tehsil Bharmour, Distt-Chamba

Holi-176309, Taluka : Bharmour, District : Chamba, GIDC : Not in Any SIDC

Laboratory Remarks : EMP Project Sample. By:22-lab_22 Dt.: 03/10/2017

Dr. Ramakant Awasthi,SO

06/10/2017N I C

1. * - These parameters are covered under the scope of NABL.

2. The results refer only to the tested samples and applicable parameters. Endorsement of products is neither inferred nor implied.

3. Samples will be destroyed after 10 days from the date of issue of test report unless otherwise specified.

4. This report is not to be reproduced wholly or in part or used in any advertising media without the permission of the Board in writing.

5. The Board is not responsible for the authenticity for the samples not collected by the Board’s officials.

6. Total liability of our laboratory is limited to the invoiced amount. Any dispute arising out of this report is subject to

Himachal Pradesh Jurisdiction only.

7. Permissible Limits: as per Schedule VI of EPA Rules, 1986 as ammended by Second and Third ammendment 1993 for Effluents

bore well waterField Observation :

Page 14: Sub - GMR Group · Environmental Clearance from MoEF, GOl, Delhi was accorded on 24th Jan 2011. As per the condition no. Vl (General) and 13 of the clearance letter, please find the

Sample ID:47558 - Analysis Completion:03/10/2017

ANALYSIS REPORT FOR

WATER / WASTE WATER SAMPLE

Power generation plant [except Wind and Solar

renewable power plants of all capacities and Mini Hydel

power plant of capacity <25MW] / LAB Inward : 6410

Himachal State Pollution Control Board, Dharamshala

Him Agrico Building, Jachh

Dharamshala, Distt. Kangra

Dharamshala-176215

Tele:01893226368

TEST REPORT

Test Report No. : 6410 Date: 03/10/2017

3. Nature of Sample

4. Sample Collected By

5. Quantity of Sample Received

6. Code No. of the Sample

7. Date & Time of Collection & Inwarding

8. Date of Start & Completion of Analysis

9. Sampling Point

10. Flow Details (Remarks)

11. Mode of Disposal

12. Ultimate Receiving Body

13. Temperature on Collection

14. Carboys Nos for

15. Water Consumption & W.W.G (KLPD)

1. Name of the Customer

2. Address

Range of TestingTest MethodSr ResultUnitParameter

---Suspended Solids 1 1.0 mg/l

--- 2 12.8 mg/l

--- 3 2.0 mg/l

---

--- 5

: WAT-Water Act(Legal), (Insp Type : ROU-Routine Visit)

: Parveen Kumar Dhiman,JEE

:

: 47558

: 11/09/2017 , (1050 to 1050) & 12/09/2017

: 12/09/2017 & 03/10/2017

: Bore Well GMR Colony (180 MW HEP) ~

: Bore Well

: Bore Well

: ravi

: 13.6 & pH Range on pH Strip :6-8

: 15 & Color & Appearance :Slightly Turbid

: Ind :6000.000 , Dom :5.250 & Ind :0.000 , Dom :4.280

: Bajoli Holi Hydro Electric Project (180) - 20309

: -,GMR Bajoli Holi Hydro Power Pvt. Ltd.,Kartik House, PO-Holi, Tehsil Bharmour, Distt-Chamba

Holi-176309, Taluka : Bharmour, District : Chamba, GIDC : Not in Any SIDC

Laboratory Remarks : EMP Project Sample. By:22-lab_22 Dt.: 03/10/2017

Dr. Ramakant Awasthi,SO

06/10/2017N I C

1. * - These parameters are covered under the scope of NABL.

2. The results refer only to the tested samples and applicable parameters. Endorsement of products is neither inferred nor implied.

3. Samples will be destroyed after 10 days from the date of issue of test report unless otherwise specified.

4. This report is not to be reproduced wholly or in part or used in any advertising media without the permission of the Board in writing.

5. The Board is not responsible for the authenticity for the samples not collected by the Board’s officials.

6. Total liability of our laboratory is limited to the invoiced amount. Any dispute arising out of this report is subject to

Himachal Pradesh Jurisdiction only.

7. Permissible Limits: as per Schedule VI of EPA Rules, 1986 as ammended by Second and Third ammendment 1993 for Effluents

bore wellField Observation :

Page 15: Sub - GMR Group · Environmental Clearance from MoEF, GOl, Delhi was accorded on 24th Jan 2011. As per the condition no. Vl (General) and 13 of the clearance letter, please find the

Sample ID:47559 - Analysis Completion:03/10/2017

ANALYSIS REPORT FOR

WATER / WASTE WATER SAMPLE

Power generation plant [except Wind and Solar

renewable power plants of all capacities and Mini Hydel

power plant of capacity <25MW] / LAB Inward : 6411

Himachal State Pollution Control Board, Dharamshala

Him Agrico Building, Jachh

Dharamshala, Distt. Kangra

Dharamshala-176215

Tele:01893226368

TEST REPORT

Test Report No. : 6411 Date: 03/10/2017

3. Nature of Sample

4. Sample Collected By

5. Quantity of Sample Received

6. Code No. of the Sample

7. Date & Time of Collection & Inwarding

8. Date of Start & Completion of Analysis

9. Sampling Point

10. Flow Details (Remarks)

11. Mode of Disposal

12. Ultimate Receiving Body

13. Temperature on Collection

14. Carboys Nos for

15. Water Consumption & W.W.G (KLPD)

1. Name of the Customer

2. Address

Range of TestingTest MethodSr ResultUnitParameter

---Suspended Solids 1 2.0 mg/l

-- 2 1.0 mg/l

--- 3 8.0 mg/l

--- 4 Nil

---pH 5 8.30

: WAT-Water Act(Legal), (Insp Type : ROU-Routine Visit)

: Parveen Kumar Dhiman,JEE

:

: 47559

: 11/09/2017 , (1115 to 1115) & 12/09/2017

: 12/09/2017 & 03/10/2017

: Sewage Treatment Plants ~ Final Outlet of STP (Gammon)

: STP

: STP

: ravi

: -------- & pH Range on pH Strip :6-8

: 16 & Color & Appearance :Slightly Turbid

: Ind :6000.000 , Dom :5.250 & Ind :0.000 , Dom :4.280

: Bajoli Holi Hydro Electric Project (180) - 20309

: -,GMR Bajoli Holi Hydro Power Pvt. Ltd.,Kartik House, PO-Holi, Tehsil Bharmour, Distt-Chamba

Holi-176309, Taluka : Bharmour, District : Chamba, GIDC : Not in Any SIDC

Laboratory Remarks : All the parameters analysed are within limit. EMP Project Sample.

Dr. Ramakant Awasthi,SO

06/10/2017N I C

Note :

1. * - These parameters are covered under the scope of NABL.

2. The results refer only to the tested samples and applicable parameters. Endorsement of products is neither inferred nor implied.

3. Samples will be destroyed after 10 days from the date of issue of test report unless otherwise specified.

4. This report is not to be reproduced wholly or in part or used in any advertising media without the permission of the Board in writing.

5. The Board is not responsible for the authenticity for the samples not collected by the Board’s officials.

6. Total liability of our laboratory is limited to the invoiced amount. Any dispute arising out of this report is subject to

Himachal Pradesh Jurisdiction only.

7. Permissible Limits: as per Schedule VI of EPA Rules, 1986 as ammended by Second and Third ammendment 1993 for Effluents

stp sampleField Observation :

Page 16: Sub - GMR Group · Environmental Clearance from MoEF, GOl, Delhi was accorded on 24th Jan 2011. As per the condition no. Vl (General) and 13 of the clearance letter, please find the

Sample ID:47560 - Analysis Completion:03/10/2017

ANALYSIS REPORT FOR

WATER / WASTE WATER SAMPLE

Power generation plant [except Wind and Solar

renewable power plants of all capacities and Mini Hydel

power plant of capacity <25MW] / LAB Inward : 6412

Himachal State Pollution Control Board, Dharamshala

Him Agrico Building, Jachh

Dharamshala, Distt. Kangra

Dharamshala-176215

Tele:01893226368

TEST REPORT

Test Report No. : 6412 Date: 03/10/2017

3. Nature of Sample

4. Sample Collected By

5. Quantity of Sample Received

6. Code No. of the Sample

7. Date & Time of Collection & Inwarding

8. Date of Start & Completion of Analysis

9. Sampling Point

10. Flow Details (Remarks)

11. Mode of Disposal

12. Ultimate Receiving Body

13. Temperature on Collection

14. Carboys Nos for

15. Water Consumption & W.W.G (KLPD)

1. Name of the Customer

2. Address

Range of TestingTest MethodSr ResultUnitParameter

---Suspended Solids 1 2.0 mg/l

--Biochemical Oxygen Demand (BOD) 2 1.4 mg/l

---COD 3 12.0 mg/l

---Oil and Grease 4 Nil

---pH 5 8.26

: WAT-Water Act(Legal), (Insp Type : ROU-Routine Visit)

: Parveen Kumar Dhiman,JEE

:

: 47560

: 11/09/2017 , (1130 to 1130) & 12/09/2017

: 12/09/2017 & 03/10/2017

: Sewage Treatment Plants ~ Final Outlet of STP (GMR)

: STP

: STP

: ravi

: ---- & pH Range on pH Strip :6-8

: 17 & Color & Appearance :Slightly Turbid

: Ind :6000.000 , Dom :5.250 & Ind :0.000 , Dom :4.280

: Bajoli Holi Hydro Electric Project (180) - 20309

: -,GMR Bajoli Holi Hydro Power Pvt. Ltd.,Kartik House, PO-Holi, Tehsil Bharmour, Distt-Chamba

Holi-176309, Taluka : Bharmour, District : Chamba, GIDC : Not in Any SIDC

Laboratory Remarks : All the parameters analysed are within limit. EMP Project Sample.

By:22-lab_22 Dt.: 03/10/2017

Dr. Ramakant Awasthi,SO

06/10/2017N I C

Note :

1. * - These parameters are covered under the scope of NABL.

2. The results refer only to the tested samples and applicable parameters. Endorsement of products is neither inferred nor implied.

3. Samples will be destroyed after 10 days from the date of issue of test report unless otherwise specified.

4. This report is not to be reproduced wholly or in part or used in any advertising media without the permission of the Board in writing.

5. The Board is not responsible for the authenticity for the samples not collected by the Board’s officials.

6. Total liability of our laboratory is limited to the invoiced amount. Any dispute arising out of this report is subject to

Himachal Pradesh Jurisdiction only.

7. Permissible Limits: as per Schedule VI of EPA Rules, 1986 as ammended by Second and Third ammendment 1993 for Effluents