~~ MAHAVITARAN Maharashtra State Electricity Distribution Co. Ltd. Maharashtra State Electricity Distribution Co. Ltd. Prakashgad, Plot No.G-9, Sandra (East), Mumbai - 400 051 • (P) 26474753, (0) 26474211/26472131, Fax- 26472366,Website : www.mahadiscom.in No. Co-ord cell/Re-delegation of power/15311 Date :13/05/2011 COMMERCIAL CIRCULAR No. 135 , Sub: Re-delegation of powers in respect of load sanction. The State Govt. vide it's Resolution No. SAC-1093/CR-4445/NRG-5 dtd. 2.1.1995 has given full powers to all licensees for sanctioning the load without any upper limit. Now, MERC Electricity Supply Code and Standards of Performance are in force since 20-01-2005 in which specified voltage levels corresponding to load/contract demand and time bound policy of releasing the connections to the consumer have been mentioned. In order to maintain the time bound schedule of standards of performance (SoP) and to fulfill the power requirement of various consumers as per appendix "A" mentioned under SoP Regulation No.12, the existing delegation of powers have been modified / re-delegated by the Managing Director (MSEDCL). As per the powers conferred to the Managing Director (MSEDCL) vide Admn. Circular NO.1 dtd. 29.09.2005, the Managing Director (MSEDCL) has approved the re-delegation of powers in respect of load sanction as follows: Sr. Authority Existing delegation of Revised Remarks No. powers delegation of powers -1- -2- -3- -4- -S- Ol E.Es of O&M To sanction and release No Change Provided that the Divisions of loads upto and supply is extended on inclusive of 107 HP in all prescribed voltage areas except in Municipal levels as per MERC Corporation areas where Regulation 2005 such limit would be 201 (standards of HP . Inclusive of existing performance) load/demand, if any.

Upload: donhan

Post on 07-Jul-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

~~MAHAVITARANMaharashtra State Electricity Distribution Co. Ltd.

Maharashtra State Electricity Distribution Co. Ltd.Prakashgad, Plot No.G-9, Sandra (East), Mumbai - 400 051

• (P) 26474753, (0) 26474211/26472131, Fax- 26472366,Website : www.mahadiscom.in

No. Co-ord cell/Re-delegation of power/15311 Date :13/05/2011

COMMERCIAL CIRCULAR No. 135,

Sub: Re-delegation of powers in respect of load sanction.

The State Govt. vide it's Resolution No. SAC-1093/CR-4445/NRG-5 dtd. 2.1.1995 has

given full powers to all licensees for sanctioning the load without any upper limit.

Now, MERC Electricity Supply Code and Standards of Performance are in force since

20-01-2005 in which specified voltage levels corresponding to load/contract demand and time

bound policy of releasing the connections to the consumer have been mentioned. In order to

maintain the time bound schedule of standards of performance (SoP) and to fulfill the power

requirement of various consumers as per appendix "A" mentioned under SoP Regulation

No.12, the existing delegation of powers have been modified / re-delegated by the Managing

Director (MSEDCL).

As per the powers conferred to the Managing Director (MSEDCL) vide Admn. Circular

NO.1 dtd. 29.09.2005, the Managing Director (MSEDCL) has approved the re-delegation of

powers in respect of load sanction as follows:

Sr. Authority Existing delegation of Revised RemarksNo. powers delegation of

powers-1- -2- -3- -4- -S-Ol E.Es of O&M To sanction and release No Change Provided that the

Divisions of loads upto and supply is extended oninclusive of 107 HP in all prescribed voltageareas except in Municipal levels as per MERCCorporation areas where Regulation 2005such limit would be 201 (standards ofHP . Inclusive of existing performance)load/demand, if any.

02 S.Es.ofO&M To sanction and release No Change Provided that theCircles of loads to all supply is extended on

installations with contract prescribed voltagedemand above 107 HP levels as per MERCupto 5 MVA in all areas , Regulation 2005except in Municipal (standards ofCorporation areas where performance)such limit would beabove 201 HP upto 5MVA. Inclusive ofexisting load/demand, ifany

03 S.Es. of O&M To sanction and Provided that theCircles in release of loads supply is extended onconsultation to all installations prescribed voltagewith concern with contract levels as per MERCC.E. EHV ------ demand above 5. Regulation 2005(O&M) of MVA upto 10 (standards ofMSETCL MVA. Inclusive of performance)

existing demand/Ioad if any,provided thesupply isextended on EHVonly.

04 S.Es. of O&M To sanction and Provided that theCircles in release of loads supply is extended onconsultation to all installations prescribed voltagewith Executive ------- with contract levels as per MERCDirector demand above 10 Regulation 2005(Projects) MVA without any (standards ofMSETCL upper limit performance)

provided thesupply isextended on EHVonly.

05 C.Es. of O&M To sanction and release Powers are re-Zones in of loads to all delegated toconsultation installations with contract S.E.'s of O&Mwith C.E. EHV demand above 5 MVA Circles. ------

(O&M) of upto 10 MVA. InclusiveMSETCL of existing demand /Ioad

if any, provided thesupply is extended onEHVonly.

06 Regional Powers are re-Executive To sanction and release delegated toDirector in of loads to all S.E.'s of O&Mconsultation installations with contract Circles.with Executive demand above 10 MVA -------

Director without any upper limit(Projects) provided the supply isMSETCL. extended on EHV only.

.. 07 Director To sanction all the loads No change All cases where(Operations) where prescribed voltage specified norms ofin level corresponding to MERC Regulation 2005consultation the contract demand is (Standard ofwith Executive not being maintained

,Performance) is not

Director being maintained(Commercial)and ExecutiveDirector(Projects)MSETCL

Note: To expedite the load sanction process, the loads above 5 MVA contract

demand inclusive of existing demand without any upper limit will be dealt at

S.E.'s office provided the supply is extended on EHV level.

All the cases where specified norms of MERC Regulation 2005 (Standard of

Performance) is not being maintained will be dealt at Head Office only. The consumer seeking

the connections may be advised to submit their applications to concern offices along with

relevant documents.

All field officers are therefore, requested to note the above changes and finalize the

load sanction cases accordingly.

~r;Chief Engineer (cOmmercial)

Copy to: As per mailing list.