submit final report on wednesday design projects prepare ... · • all design group materials...

3
ME 481 Mechanical Engineering Design Projects Week 15 Submit Final Report on Wednesday Prepare Final Presentation & Poster Design Day Friday Dec 10th Participation Evaluation Flash Drives Design Day Awards Week 15 Report Hard Copy Due Wednesday Files Due Thursday Report(s), Presentation(s), Poster Edison Judging Poster Fabrication Prototype Move Practice Design Day Preparation Use Cover Sheet http://www.egr.msu.edu/classes/me481/radcliff/Docs/FinalReportCoversheetFa10.doc Due on Wednesday by 5 pm Look for the Box in ME Office (1) color copy for sponsor on top (5) B&W copies Everything in (1) envelope (provided) Final Report Hard Copy

Upload: others

Post on 03-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Submit Final Report on Wednesday Design Projects Prepare ... · • All Design Group materials loaded Progress Report #1 & Presentation Progress Report #2 & Presentation Final Report,

ME 481Mechanical Engineering

Design Projects

Week 15

• Submit Final Report on Wednesday• Prepare Final Presentation & Poster• Design Day Friday Dec 10th• Participation Evaluation• Flash Drives• Design Day Awards

Week 15

• Report Hard Copy Due Wednesday• Files Due Thursday

Report(s), Presentation(s), Poster• Edison Judging• Poster Fabrication• Prototype Move• Practice

Design Day Preparation• Use Cover Sheet http://www.egr.msu.edu/classes/me481/radcliff/Docs/FinalReportCoversheetFa10.doc

•Due on Wednesday by 5 pmLook for the Box in ME Office

(1) color copy for sponsor on top(5) B&W copies

Everything in (1) envelope (provided)

Final Report Hard Copy

Page 2: Submit Final Report on Wednesday Design Projects Prepare ... · • All Design Group materials loaded Progress Report #1 & Presentation Progress Report #2 & Presentation Final Report,

• Due by Thursday 5 pm

• All Design Group materials loadedProgress Report #1 & PresentationProgress Report #2 & PresentationFinal Report, Poster & Presentation

• Put in Box in ME Office available in Design Day presentation room

Flash Drive Files Design Day Setup• Prototype Transport

– Group movers 1:30pm Thursday in IPL– (Plan to go to the Union…)

• Poster & Prototype Setup by 8 am Friday– Table, Power + Easel provided– 1st Floor Lounge Available Thursday 3pm

• Fill out Special Request Sheets– Posters requested by Sponsors: make a 2nd copy

• Poster & Prototype Manned 1st Floor Lounge Friday 8am - Noon

• Presentations Lake Superior Room 8:00am-11:45am• Attend Other Presentations You have received assignments via MSU email Evaluation Forms at the Door (REQUIRED)• Lunch 12:15pm – 1:00pm• Attend Awards 1:15pm-2:00pm

Design Day Design Day Takedown

• Posters Collected at Noon–From easels–Do not remove your poster

• Prototypes Moved at Noon– Move it yourself … or– Group Movers required in Lounge

Page 3: Submit Final Report on Wednesday Design Projects Prepare ... · • All Design Group materials loaded Progress Report #1 & Presentation Progress Report #2 & Presentation Final Report,

• Due Monday Finals Week 5pm• Required for final grade http://www.egr.msu.edu/classes/me481/radcliff/Docs/StudentParticipationEval.pdf

Participation Evaluation