success and failure in implementing strategic plans...• a change‐ready and strategic...

60
9/13/2016 1 Success and Failure in Implementing Strategic Plans David Mitchell, Ph.D., University of Central Florida Scott Huizenga, City of Kansas City, Missouri Julia Novak, Novak Consulting Group

Upload: others

Post on 07-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

1

Success and Failure in Implementing Strategic Plans

David Mitchell, Ph.D., University of Central FloridaScott Huizenga, City of Kansas City, Missouri

Julia Novak, Novak Consulting Group

Page 2: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

2

Study Background• Second wave of research

• Examined the role of context in strategic plan implementation

• Based on 74 initiatives from 17 municipalities, data collection ongoing

• Survey of and project data from elected officials, city managers, and project leaders

Page 3: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

3

Study Background• Context defined as low and high levels of project

priority and implementation complexity

• Factors examined– Supportive stakeholder coalition– Change-conducive culture– Upfront implementation planning– Dedicated implementation resources– Strategic plan / budget link– Strategic plan / performance link

Page 4: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

4

Project Implementation • 51% of projects completed

– 58% on time– 84% within budget

Success Rates

Complexity High Low Moderate

Low Moderate High

Low  <=Priority=>  High

Typically staff‐driven, organizational improvement projects

Page 5: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

5

Supportive Stakeholder Coalition• Support must carry through from project

approval through implementation

• A supportive stakeholder coalition is not a critical element of success generally

• For high-priority projects, the success rate is 40% higher for those with supportive stakeholder coalitions

Page 6: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

6

Change-Conducive Culture• The organization values and is prepared for

change

• A change-conducive culture is not a critical element of success generally

• For low-priority projects, the success rate is 13% higher for those with change-conducive culture

Page 7: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

7

Dedicated Implementation Resources• Organizational capacity to implement multiple,

simultaneous change efforts

• Dedicated implementation resources are not a critical element of success generally– Dedicated project funding is the exception

• For low-priority projects, the success rate is 11% higher for those with dedicated implementation resources

Page 8: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

8

Strategic Plan / Performance Link• The ongoing outputs and outcomes of strategic

plan initiatives are tracked in a performance management system

• A link between the strategic plan and the budget is not a critical element of success generally

• For low-priority projects, the success rate is 16% higher for those with a link between the strategic plan and the performance management system

Page 9: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

9

Strategic Plan / Budget Link• Strategic plan initiatives receive adequate funding in adopted

budgets

• A link between the strategic plan and the budget is not a critical element of success generally

• For low-priority projects, the success rate is 17% higher for those with a link between the strategic plan and the budget

• For high-complexity projects, the success rate is 11% higher for those with a link between the strategic plan and the budget

Page 10: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

10

Upfront Implementation Planning• Creation of project plan, budget, schedule,

team, etc. ahead of implementation

• Upfront implementation planning is not a critical element of success generally

• For high-complexity projects, the success rate is 9% higher for those with upfront implementation planning

Page 11: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

11

Contextual Relationships with Implementation SuccessHigh‐Priority Low‐Priority High‐ComplexityStakeholder Coalition Change‐Conducive Culture Strategic Plan / Budget Link

Dedicated Implementation Resources

Upfront Implementation Planning

Strategic Plan / Performance Link

Strategic Plan / Budget Link

• Prominent projects require stakeholder support through implementation• A change‐ready and strategic organization provides support for less 

prominent projects• Planning and resource acquisition prior to implementation are key for 

complex projects

Page 12: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

12

CITYWIDE BUSINESS PLANCHALLENGES AND SUCCESSES

City of Kansas City

Page 13: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

13

Kansas City Process OverviewGoals

Strategic Objectives

Submitted Citywide 

Plan

Adopted Citywide 

Plan

Submitted Budget

Adopted Budget

Trends Analysis

Public Process

Page 14: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

14

Major Components1. City Strategic Plan2. Financial Strategic Plan3. Five Year Planning 

Model

Page 15: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

15

Citywide Business Plan

Citywide Business Plan

Department Strategic Plans

Division Business Plans

Key Performance Indicators

Financial Strategic Plan

Five‐Year Planning Model

Page 16: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

16

SUPPORTIVE STAKEHOLDER COALITION

Page 17: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

17

Partners• CEO (City Manager)• Business/Community Groups (Civic Council)• Elected Official Champion (Finance Chair)• Special interests • Neighborhood groups• Nonprofits

Page 18: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

18

18

Citizen Work SessionsContent: Emphasizes citywide objectives, and includes a budget‐related prioritization exercise

Focus groups:  Each table addresses the objectives for its assigned goal

Expanded participation:  Constituents from the grassroots level + representatives from stakeholder organizations

Page 19: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

19

Page 20: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

20

Social Media

Page 21: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

21

Balancing Act –kcmo.gov/balancingact

21

Page 22: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

22

Open Budget –budget.kcmo.gov

22

Page 23: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

23

LINK TO THE BUDGET

Page 24: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

24

Major Components

Adopted Financial Polices1. Fund Balance and Reserves2. Structurally Balanced Budget3. Revenue4. Debt5. Investment

Financial Strategic Plan

Page 25: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

25

Five Year Financial ModelBaseline Scenario Balanced Scenario

12.6% 14.3%14.9% 16.0% 16.5% 16.8%

0%

5%

10%

15%

20%

25%

2017incr(decr)

2019:$5.1

2021:$5.2

Reserves ‐ General Fund as a percent of operating expenditures

City Policy = two months' expenditures

12.4% 12.1% 10.8% 9.8% 8.4%7.2%

0%

5%

10%

15%

20%

25%

2017incr(decr)

2019:$‐4.7

2021:$‐6.2

Reserves ‐ General Fund as a percent of operating expenditures

City Policy = two months' expenditures

Page 26: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

26

Neighborhood Investment

26

Page 27: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

27

Neighborhood Investment• $1.3 million debt service for dangerous building remediation• $200,000 additional for Land Bank to add 6th mowing cycle• Transfer of Solid Waste Collection to Neighborhoods and 

Housing Services• Additional positions for receivership program and public 

engagement• $300,000 to Housing Court home repair program

27

Page 28: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

28

Infrastructure Investment• $162.5 million in capital improvements

– $13.7 million for street resurfacing– $850,000 for Bruce R. Watkins Drive– $3 million to Paseo Gateway to match $30 million grant– $2 million for Urban Youth Baseball Academy– $24.2 million to advance shovel‐ready projects

Over $10 million fleet replacement debt service

28

Page 29: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

29

LINK TO PERFORMANCE

Page 30: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

30

KCStat Dashboards kcstat.kcmo.org

Page 31: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

31

Council Goal Areas

Page 32: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

32

CHANGE CONDUCIVE CULTURE

Page 33: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

33

33

Partners and RolesPartner Role

Mayor and City Council Adopt citywide vision, mission, goals, and objectives

City Departments/Divisions Develop strategic objectives to accomplish the adopted City goals

Finance Department – Budget Office Manage and develop citywide business plan and annual budget 

Finance – Accounts Division Prepare Financial Trends report to build expert knowledge of factors that impact performance and funding levels

Office of Performance Management Draft, monitor, and report Key Performance Indicators

City Communications Office Coordinate public support and participation

Page 34: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

34

Connecting the Dots

Phase II Phase III

KCStat

Structured Change 

Management

Financial Trends

Annual Budget

Council Priorities

Financial Reports

Budget Forecasts

Citywide Business Plan

Phase I

Page 35: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

35

Values What we believe

Vision Statement What we strive to become

Mission Statement What we exist to do

Goals What we do to achieve themission

Objectives Howwe achieve each goal

KPI’s Howwe measure success

“Common Template”

Page 36: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

36

Decreased complexity• Fewer number of goals objectives

– SMART objectives– “How will we do that”– Deadlines

• Regular progress reports• Uses current comprehensive plan framework• Low investment: redirects existing resources

Page 37: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

37

Links• Citywide Business Plan

– http://kcmo.gov/finance/citywide‐business‐plan/• KCMO Budget Office

– http://kcmo.gov/budget– [email protected]– @KCMOBudget– @Scott_Huizenga

• Open Budget ‐ budget.kcmo.gov• Balancing Act ‐ www.kcmo.gov/balancingact

Page 38: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

38

A Consultant’s View

Page 39: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

39

What is a strategic plan?• Answers three basic questions

– What do we know to be true, today?• Where are we?  

– What do we hope will be true in the future?• What is our vision?

– How do we make it so?• What is the plan to move towards the vision

Page 40: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

40

What is a strategic plan• Three distinct phases

– Environmental Scan – what do we know to be true today?

– Visioning – where do we want to be in the future?– Action Planning – what is our plan

Page 41: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

41

What is a strategic plan• Nothing without implementation…• Execution is everything!

Page 42: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

42

WHAT IS THE SUBJECT OF THE PLAN

A single department?The local government jurisdiction?The community?

Page 43: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

43

Single Department• Typically lead by department leadership• Involves staff from the department• Can fall within the umbrella of an organization‐wide strategic plan if one exists

Page 44: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

44

Local Government Organization• Can be lead by the administration without input from the governing body

• Can be done by the governing body – ideally with support and input from the organization

– With or without input from the community

Page 45: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

45

Community• Best when multiple stakeholders are engaged and leadership is shared

• Can be “sponsored” by the local government• Subject is broader than City or County government – encompasses all sectors –public, private and non profit.

Page 46: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

46

THE ENVIRONMENTAL SCANWhat do we know to be true today?

Page 47: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

47

Ingredients of an Environmental Scan

• Strengths, Weaknesses, Opportunities and Challenges (SWOC)

• Customer and Stakeholder input• Demographic information• Financial information• Trend Analysis – Social, Economic, Political, Environmental, Technological

Page 48: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

48

VISIONINGWhat do we hope will be true in the future

Page 49: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

49

Vision• Comes in many forms

– Improved Quality of Life– Clear Description of the future– Simple words you may remember

Page 50: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

50

Vision StatementsWindsor, ColoradoWindsor is the hub of Northern Colorado; a safe, unique and special town that offers diverse cultural and recreation opportunities. Windsor is recognized as a regional leader that demonstrates fiscal responsibility, environmental stewardship and strategic excellence. A big town that never lost its hometown pride.

Fort Collins, ColoradoTo provide world class municipal services through operational excellence and a culture of innovation.

Midland, MichiganTogether – Forward – BoldAn exceptional place where everyone thrives!

Page 51: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

51

ACTION PLANNINGWhat must go well in order to make it so

Page 52: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

52

Critical Success Factors

Page 53: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

53

Action Planning: Critical Success Factors• Create the context for specific actions to take place

• These are the big buckets

Page 54: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

54

Critical Success Factors 

Page 55: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

55

Action Planning and Implementation

• Priority initiatives fit within the context of the “big buckets”

Page 56: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

56

SUCCESSDevelopment and Implementation

Page 57: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

57

Success in Plan Development• People developing the plan must be willing to engage (spend the time) to develop a plan

• If the governing body is to be engaged – they must engage

• If the governing body is engaged – the administration MUST commit to implement

Page 58: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

58

Success in Implementation• Must become part of the organizations conversation

• Routine updates on progress for each priority initiative is critical

• Leadership is critical

Page 59: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

59

Questions/Comments?

Additional Information…

Page 60: Success and Failure in Implementing Strategic Plans...• A change‐ready and strategic organization provides support for less ... • $1.3 million debt service for dangerous building

9/13/2016

60