successfully designed

Upload: girish-bhat

Post on 07-Apr-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/6/2019 Successfully Designed

    1/68

    Successfullydesigned, developed

    and implemented a

    complete regression

    test for the

    entiresystem.

    Used

    Quality Centerand

  • 8/6/2019 Successfully Designed

    2/68

  • 8/6/2019 Successfully Designed

    3/68

    the possibilities

    of system failurewith UAT.

    Involved inattending meetings

    with the businessusers and reviewing

    the developed

    scripts toensure that

  • 8/6/2019 Successfully Designed

    4/68

    they were in

    accordance to thebusiness users

    expectations.Environment: Java,

    AS400, Quality

    Center 9.0, Xml,

    TFS, Visual Studios

    2005, Office2000.Blockbuster

  • 8/6/2019 Successfully Designed

    5/68

    Inc, McKinney, TX

    May07 Aug07Role:QA Analyst

    The BlockbusterInc assists the

    media inproviding

    company specificand home

  • 8/6/2019 Successfully Designed

    6/68

    entertainmentindu

    stry related

    information. The

    Project was aonline application

    called ePAF(ElectronicPayrol

    l ApplicationForm) which

  • 8/6/2019 Successfully Designed

    7/68

  • 8/6/2019 Successfully Designed

    8/68

    change, and Pay

    change.Responsibilities:

    Reviewed the

    Business

    RequirementDocuments (

    BRD

  • 8/6/2019 Successfully Designed

    9/68

    ) and the Functional

    Specifications.

    Involved in writing

    Test Plansby going through the

    design andfunctional

    specifications.

  • 8/6/2019 Successfully Designed

    10/68

    Reviewed the

    Designs andspecifications and

    createdTest cases

    based on the

    content.

    Participated and

    coordinated in

  • 8/6/2019 Successfully Designed

    11/68

    Test Case

    Walkthroughs.

    Performed bothManual

    andAutomated Testing

    of the application.

  • 8/6/2019 Successfully Designed

    12/68

    Involved in

    preparing the Testdata for interpreting

    thePositive/Negative/R

    egression

    results based on the

    design requirements.

  • 8/6/2019 Successfully Designed

    13/68

    The Test sets that

    covered all aspectsof the application

    functionality werescheduled

    andexecuted using

    Quality Center

    .

  • 8/6/2019 Successfully Designed

    14/68

    Generated

    automated testscripts using

    WinrunnerTSL, based on

    system requirements

    for theweb-based

    application and

    added check pointson the new builds.

  • 8/6/2019 Successfully Designed

    15/68

    Created automatedtest scripts by using

    Winrunner for data

    verification andvalidations.

    Successfully

    designed, developed

    and implemented acomplete regression

  • 8/6/2019 Successfully Designed

    16/68

    test for the

    entiresystem.

    Used Rendezvous

    concept ofLoadRunner

    to generate peakload onto the server

    therebystressing it,

  • 8/6/2019 Successfully Designed

    17/68

    and measuring its

    performance.

    Ran the

    LoadRunnerScenarios with

    various user-mixincrementing in

    constant ratios,

    thusreaching the

  • 8/6/2019 Successfully Designed

    18/68

    peak load of 1500

    Virtual Users.

    Used

    Quality Centeras a Test

    management anddefect tracking tool.

    Interacted withBusiness users for

  • 8/6/2019 Successfully Designed

    19/68

    UAT (User

    AcceptanceTesting), and tested

    the possibilitiesof system failure

    with UAT.

    Involved in

    attending meetings

    with the business

  • 8/6/2019 Successfully Designed

    20/68

    users and reviewing

    the developedscripts toensure that

    they were inaccordance to the

    business users

    expectations.

    Environment:

    ASP.NET, Oracle8i,Java, Load Runner

  • 8/6/2019 Successfully Designed

    21/68

    9.0, Win Runner

    9.2, Quality Center9.0,Office

    2000.Sprint PCS,Overland Park, KS

    Aug 06

    April07QA

    AnalystResponsibilit

    ies:

  • 8/6/2019 Successfully Designed

    22/68

    Reviewed the

    BusinessRequirement

    Documents (BRD)and the Functional

    Specifications.

    Involved in writing

    Test Plans

  • 8/6/2019 Successfully Designed

    23/68

    by going through the

    design andfunctional

    specifications.Reviewed the

    Designs andspecifications and

    created

    Test cases

  • 8/6/2019 Successfully Designed

    24/68

    based on the

    content.

    Participated and

    coordinated inTest Case

    Walkthroughs.

    Performed bothManual

  • 8/6/2019 Successfully Designed

    25/68

    and

    Automated Testingof the application.

    Generatedautomated Test

    Scripts usingWin Runner

    TSL, based on

    system requirements

  • 8/6/2019 Successfully Designed

    26/68

    andadded check

    points on newbuilds.

    Extensivelyinvolved in testing

    CSM module withactivities like Billing

    account number

    (BAN)creation,

  • 8/6/2019 Successfully Designed

    27/68

    activate, suspend,

    cancel, restoresubscribers, and

    billing.

    As a team member

    was involved increating Detailed

    Test Cases (DTC).

  • 8/6/2019 Successfully Designed

    28/68

    Using DTCs

    createdTest scripts.

    Involved in testing

    MPS module forusage details.

    Backend testing

    by querying the

    database UsingToad

  • 8/6/2019 Successfully Designed

    29/68

    .

    Recorded Load

    Runner Vuser

    scripts implementingparameterization by

    data driven wizardsinVirtual User

    Generator.

  • 8/6/2019 Successfully Designed

    30/68

    Interacted with

    Business users forUAT

    (User AcceptanceTesting), Tested the

    possibilities

    of system failure

    with UAT

    Used

  • 8/6/2019 Successfully Designed

    31/68

    Test Director

    as a Testmanagement and

    defect tracking tool.Environment: HP-

    UX, Oracle8i,

    COBOL, TOAD 8.0,

    Java, Quick Test Pro

    8.2, Load Runner7.6,Win Runner 7.5,

  • 8/6/2019 Successfully Designed

    32/68

    Test Director 8.0,

    Office 2000.CapitalOne

    ,Richmond, VA, Feb

    06 July 06QA

    AnalystResponsibilit

    ies:

    Designed

  • 8/6/2019 Successfully Designed

    33/68

    Test Plans

    andTest cases

    by going through theDesign, Functional

    Requirements

    anduser (Business)

    Requirements

    Documentation.

  • 8/6/2019 Successfully Designed

    34/68

    Involved in

    Manual Testingthe application.

    PerformedFunctional Testing

    andScenario Based

    Testing

    .

  • 8/6/2019 Successfully Designed

    35/68

    Performed

    Regression Testingduring various

    phases ofdevelopment.

    Created data driventests using

    Win Runner

  • 8/6/2019 Successfully Designed

    36/68

    to run the script for

    varying data.

    Conducted

    Systemand

    Integration Testing, debugged the

    software errors and

    interacted

  • 8/6/2019 Successfully Designed

    37/68

    withDevelopers to

    resolve technicalissues.

    Created automatedtest scripts by using

    Quick Test Profor data verification

    and validations.

    Conducted

  • 8/6/2019 Successfully Designed

    38/68

    Backend Testing

    by queryingdatabases.

    The Test sets thatcover all aspects of

    applicationfunctionality were

    scheduled and

  • 8/6/2019 Successfully Designed

    39/68

    executedusing Test

    Director.

    Created test

    descriptions for allUse Cases kept

    underLoad test

    .

  • 8/6/2019 Successfully Designed

    40/68

    Creating and

    executingLOAD Test plans

    .Interacted with

    developers andreported the

    software bugs

    through

  • 8/6/2019 Successfully Designed

    41/68

    Test Director

    .

    Interacted with

    Business users forUAT

    (User AcceptanceTesting), Tested the

    possibilities

  • 8/6/2019 Successfully Designed

    42/68

    of system failure

    with UAT.

    Involved in project

    meetings with thebusiness users and

    reviewing thedeveloped scripts

    toensure that they

    were in accordance

  • 8/6/2019 Successfully Designed

    43/68

    to the business

    users expectations.Environment:

    WindowsNT/2000,Java, JavaScript,

    Oracle9i, TOAD 8.0,

    Quick Test Pro 8.2,

    LoadRunner 7.6,Win

    Runner 7.0, TestDirector 8.0ERIE

  • 8/6/2019 Successfully Designed

    44/68

    Insurance Group,

    Erie, PA July 05 Jan 06QA

    testerResponsibilities:

    CreatedTest Plans

    , and generated

    Test Cases

  • 8/6/2019 Successfully Designed

    45/68

    for the application.

    Performed

    Manual Testing

    on different modulesof the application.

    Performed

    Functional Testing

    ,Regression Testing

  • 8/6/2019 Successfully Designed

    46/68

    ,

    System Testingand

    Performance Testing.

    Involved inrequirement and

    development

  • 8/6/2019 Successfully Designed

    47/68

    walkthroughs and

    reviews.

    Created automated

    test scripts by usingWin Runner

    for data verificationand validations.

  • 8/6/2019 Successfully Designed

    48/68

    Developed SQL

    Queries to check thedatabase integrity.

    Evaluatedapplication testing

    results and recordedthe discrepancies

    using

    Test Director

  • 8/6/2019 Successfully Designed

    49/68

    to track,analyze and

    report on them.Generated detailed

    reports of Bugs,Pass-Fail report and

    ComparisonChart.

    Interacted with

    developers and

    reported the

  • 8/6/2019 Successfully Designed

    50/68

    software bugs

    through TestDirector.

    Involved in projectmeetings start of

    every week to keepup to the pace of the

    project.

  • 8/6/2019 Successfully Designed

    51/68

    Environment: Visual

    Basic 6.0, ASP 3.0,Test Director8.0,

    Win Runner 7.0,Oracle8i, Java,

    SQL,XML.

    Health Highway,

    Inc, Santa Clara, CA

    Jan 05 - June 05

  • 8/6/2019 Successfully Designed

    52/68

    QA TesterResponsibilities:

    Wrote detailed

    Test Plans

    outlining the test

    schedules, hardwareand software

    required, testdata, business

  • 8/6/2019 Successfully Designed

    53/68

    functionalities to be

    tested, testingstrategy to validate

    the key businessprocess.

    Involved in writingTest Cases for

    testing the

    functionality of the

  • 8/6/2019 Successfully Designed

    54/68

    application, which

    covered bothend toend test cases to test

    a specificfunctionality. Wrote

    Test Cases in Test

    Director.

    Executed the Tests

    manually to verify

  • 8/6/2019 Successfully Designed

    55/68

    the application

    functionality.

    Created automated

    scripts using TSL inWinrunner

    to performregression testing of

    the moduleslike task

    ID Creation.

  • 8/6/2019 Successfully Designed

    56/68

    Inserted

    synchronizationpoints to solve

    timing problembetween test and

    application.

    Tested GUI and

    functionality of the

    application using

  • 8/6/2019 Successfully Designed

    57/68

    multiple browsers

    such asNetscape Navigator,

    Microsoft Exploreron multi platforms

    and interpreted the

    negative/positive

    results..

  • 8/6/2019 Successfully Designed

    58/68

    Involved in

    checking hyperlinksof the application.

    Used SQL tovalidate backend

    database changesand updates.

    Tracked the defectsfound and sent them

  • 8/6/2019 Successfully Designed

    59/68

    to the Developer

    usingTest Director

    .To report the status

    of the softwaretesting through an

    analysis of reported

    defects.

  • 8/6/2019 Successfully Designed

    60/68

    Environment: Quick

    Test Pro(QTP), WinRunner 7.0, Test

    Director 8.0,Bugzilla, DB2, SQL,

    Java,HTML,

    Weblogic, Windows

    2000/XPDr.Reddys

    Labs, Hyderabad,India Nov 03 - Nov

  • 8/6/2019 Successfully Designed

    61/68

    04Software

    TesterResponsibilities:

    Analyzed thebusiness

    requirements andwrote a detail

    Test Plan

    .

  • 8/6/2019 Successfully Designed

    62/68

    Performed positive

    and negative testing.

    Performed security

    testing of theproduct.

    Generated various

    reports for

    Management about

  • 8/6/2019 Successfully Designed

    63/68

    Test Defects and

    Execution status.Environment: C++,

    CGI and HTML on aWindows

    Platform.NIIT,

    Hyderabad, India

    April 02 - Oct

    03Software

  • 8/6/2019 Successfully Designed

    64/68

    TesterResponsibilitie

    s:

    Involved in

    preparingtest plan

    andtest cases

  • 8/6/2019 Successfully Designed

    65/68

    based on the

    businessrequirements.

    Involved inManual Testing

    , for the GUI andFunctionality of the

    application.

    Performed

  • 8/6/2019 Successfully Designed

    66/68

    installation

    andconfiguration

    of software required

    for testing.Developed

    SQL queries

  • 8/6/2019 Successfully Designed

    67/68

    to check the data

    base integrity.

    Participated in

    weekly assessmentmeetings with

    business analystsand developers

    Environment:

    Windows 95, Java,

  • 8/6/2019 Successfully Designed

    68/68

    Jdk1.1.6, Java script,

    SQL Server, SQL.