summer internship project 2010 presentation

Upload: sandipa-malakar

Post on 09-Apr-2018

223 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/8/2019 Summer Internship Project 2010 Presentation

    1/28

    Peerless Integrated Information System (PIIS)

    Branch Online System Oriented Job

    THE PEERLESS GENERAL FINANCE ANDINVESTMENT CO. LTD.

  • 8/8/2019 Summer Internship Project 2010 Presentation

    2/28

  • 8/8/2019 Summer Internship Project 2010 Presentation

    3/28

    WHAT ARE SYSTEM S RE SOU R CE S ?

    Branch Server (high end PCs) runs on LINUX operatingsystem & loaded with J2SE softwareBranch Nodes (PCs) runs on LINUX & J2SE software,connected to the Server over LAN

    Routers & Modems for Wide Area connectivity over ISDN or Leased LineVSAT outdoor & indoor units for satellite connectivityOracle 9i Database

    PIIS Application Software

  • 8/8/2019 Summer Internship Project 2010 Presentation

    4/28

    HOW I AM C ONN ECTED W IT H DATA CE N TER ?

    Branch is connected to the Data Center by ISDN/ LeasedLine/ VSATService Center(SC) is connected to the parent Branch byISDN through out the customer service

    Generally the Branch will connect Data Center twice a day

    1. At the Start Of Day (SOD)- to check downloads2. At the End Of Day (EOD) to upload data

    Delink after SOD & relink for EOD

  • 8/8/2019 Summer Internship Project 2010 Presentation

    5/28

    AW AR N ESS AB OU T N ET WO RK

  • 8/8/2019 Summer Internship Project 2010 Presentation

    6/28

    T H E PIIS SYSTEM W IN DOW

  • 8/8/2019 Summer Internship Project 2010 Presentation

    7/28

    1 st Step :- ( Go to menu of Discharge Form Receiving )

    T H E PR O CESS OF DISC H ARGE FO RM RECEIVI N G I N PIIS SYSTEM

  • 8/8/2019 Summer Internship Project 2010 Presentation

    8/28

  • 8/8/2019 Summer Internship Project 2010 Presentation

    9/28

    1 st Step :- ( Go to Record Payment menu )

    T H E PR O CESS OF REC O RD PAYME N T I N PIIS SYSTEM

  • 8/8/2019 Summer Internship Project 2010 Presentation

    10/28

    2 nd Step :- ( Preparation for Cheque printing )

    T H E PR O CESS OF REC O RD PAYME N T I N PIIS SYSTEM

  • 8/8/2019 Summer Internship Project 2010 Presentation

    11/28

    F or Single Policy H older

    T H E PR O CESS OF C H EQ U E VERI F ICATI ON IN PIIS SYSTEM

  • 8/8/2019 Summer Internship Project 2010 Presentation

    12/28

    F or Group Policy H older

    T H E PR O CESS OF C H EQ U E VERI F ICATI ON IN PIIS SYSTEM

  • 8/8/2019 Summer Internship Project 2010 Presentation

    13/28

    T H E PR O CESS OF RE-ISS U E OF C H EQ U E I N PIIS SYSTEM

  • 8/8/2019 Summer Internship Project 2010 Presentation

    14/28

    T H E PR O CESS OF BRS I N PIIS SYSTEM

    1st

    Step :- (Go to menu for Cheque Encashment)

  • 8/8/2019 Summer Internship Project 2010 Presentation

    15/28

    2nd

    Step :- ( Enter the Date & Cheque No. followed by Bank Statement )

    T H E PR O CES S OF BRS I N PIIS SYSTEM

  • 8/8/2019 Summer Internship Project 2010 Presentation

    16/28

    3 rd

    Step :-( After Encashment the cheques, check the balance with Bank Statement)

    T H E PR O CES S OF BRS I N PIIS SYSTEM

  • 8/8/2019 Summer Internship Project 2010 Presentation

    17/28

    4 th

    Step :- ( Go to menu for Cheque Realization)

    T H E PR O CES S OF BRS I N PIIS SYSTEM

  • 8/8/2019 Summer Internship Project 2010 Presentation

    18/28

    5 th Step :- ( After clicking Show Cheques, click the field as per Bank Statement, then click on Save)

    T H E PR O CES S OF BRS I N PIIS SYSTEM

  • 8/8/2019 Summer Internship Project 2010 Presentation

    19/28

  • 8/8/2019 Summer Internship Project 2010 Presentation

    20/28

    1 st Step :- ( Get the advice no. from mail inbox, then go to menu for Fund Transfer entry)

    T H E PR O CESS OF FUN D TRA N SF ER E N TRY I N PIIS SYSTEM

  • 8/8/2019 Summer Internship Project 2010 Presentation

    21/28

    2nd

    Step :- ( Do entry in the particular fields)

    T H E PR O CESS OF FUN D TRA N SF ER E N TRY I N PIIS SYSTEM

  • 8/8/2019 Summer Internship Project 2010 Presentation

    22/28

    3rd

    Step :- ( Go to the General Ledger)

    T H E PR O CESS OF FUN D TRA N SF ER E N TRY I N PIIS SYSTEM

  • 8/8/2019 Summer Internship Project 2010 Presentation

    23/28

    4 th Step :- ( In the General Ledger enter date of a particular period )T H E PR O CESS OF FUN D TRA N SF ER E N TRY I N PIIS SYSTEM

  • 8/8/2019 Summer Internship Project 2010 Presentation

    24/28

    ( Enter the particular date and the total amount of deduction)

    T H E PR O CESS OF GE N ERATED BRS I N PIIS SYSTEM

  • 8/8/2019 Summer Internship Project 2010 Presentation

    25/28

    1 st Step :- ( Log in the PIIS with required ID & Password and particular EOD date to enter in EOD )

    T H E PR O CES S OF E O D I N PIIS SYSTEM

  • 8/8/2019 Summer Internship Project 2010 Presentation

    26/28

    2 ndStep :- ( For EOD, click on Perform EOD Process)

    T H E PR O CES S OF E O D I N PIIS SYSTEM

  • 8/8/2019 Summer Internship Project 2010 Presentation

    27/28

    T H E PR O CESS OF TDS VERI F ICATI ON IN PIIS SYSTEM

  • 8/8/2019 Summer Internship Project 2010 Presentation

    28/28

    Submitted by Arpan Dutta