summerhaven congestion management concepts study public

13
Summerhaven Congestion Management Concepts Study Public Meeting No. 1 August 16, 2018

Upload: others

Post on 24-Jan-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Summerhaven Congestion Management Concepts Study Public

Summerhaven Congestion Management Concepts

Study

Public Meeting No. 1

August 16, 2018

Page 2: Summerhaven Congestion Management Concepts Study Public

Agenda 1. Introductions 2. Study Purpose and Goals3. Work Plan Overview4. Discussion of Issues5. Next Steps

Page 3: Summerhaven Congestion Management Concepts Study Public

Study Purpose and Goals

• Need for the Study• Summerhaven is a popular

destination for residents and tourists in Pima County

• Town center and adjacent street system experience congestion, affecting all modes

• Traffic Action Requests are regularly received concerning congestion and parking issues

Page 4: Summerhaven Congestion Management Concepts Study Public

Study Purpose and Goals

• Study Goals• Engage stakeholders to identify

issues and possible solutions• Identify congestion relief

concepts to mitigate multi-modal congestion; concepts may include:

• Parking concepts• Improvements to the roadway

system• Transit/shuttle • Trailhead enhancements• Technology solutions• Others

Page 5: Summerhaven Congestion Management Concepts Study Public

Work Plan Overview

• Project Tasks• Data Gathering

• Gather existing information from Pima County• Initial stakeholder meetings• Site visits• First of two public open houses

• Current Network Assessment• Crash data analysis• Traffic data analysis• Needs assessment memorandum• Needs assessment and improvement brainstorming session

Page 6: Summerhaven Congestion Management Concepts Study Public

Work Plan Overview (cont.)

• Project Tasks• Recommendations

• Draft recommendations development• Follow-up stakeholder meetings• Second of two public open houses• Refined recommendations• Cost estimates and prioritization of improvements• Final recommendations

Page 7: Summerhaven Congestion Management Concepts Study Public

Project Schedule

• ≈6 month timeline• Meeting dates are approximate

Task Aug. Sep. Oct. Nov. Dec. Jan.Data GatheringNetwork AssessmentRecommendations

Public Open HouseStakeholder Meetings

Site Visits D Draft Plan

F Final Plan

D F

Page 8: Summerhaven Congestion Management Concepts Study Public

Discussion of Issues

• What are the issues related to congestion in the study area?• Parking• Multimodal mobility

• Bicycles• Pedestrians

• Congestion and Traffic Circulation• Other

Page 9: Summerhaven Congestion Management Concepts Study Public

Parking(30 minutes)

• What are the issues related to parking?• Limited parking• Location of available parking• Safety

• How often do the issues occur?• Seasonal / weekend / snow play

• What are potential solutions to parking issues?

Page 10: Summerhaven Congestion Management Concepts Study Public

Multimodal mobility and safety

(15 minutes)

• What are the issues related to walking and bicycling?

• How often do the issues occur?• Seasonal / weekend / snow play

• What are potential solutions to improve walking and bicycling?

Page 11: Summerhaven Congestion Management Concepts Study Public

Congestion and Traffic Circulation

(15 minutes)

• What are the issues related to congestion and circulation?

• How often do the issues occur?• What are potential solutions to

reduce congestion and improve circulation?

Page 12: Summerhaven Congestion Management Concepts Study Public

Additional Discussion(15 minutes)

• Transit• Shuttle• Transit circulator

• Technology• Travel information

• Other

Page 13: Summerhaven Congestion Management Concepts Study Public

Next Steps

• Summarize input from stakeholders and public meeting• Data Gathering

• Site visit• Mapping and research

• Needs memorandum• Draft Recommendations• Agency Stakeholder Meeting No. 2• Public Meeting No. 2• Final Recommendations