Summit Avenue Extension Montgomery County Department of Transportation Montgomery County Department of Transportation Project Purpose Improve mobility on Connecticut Ave (MD 185) and University Blvd (MD 193) Provide alternative route for Southwest-Northeast Travel Maintain and enhance community character Project Location 1 Montgomery County Department of Transportation (MCDOT) Division of Transportation Engineering (DTE) Project Website: http: //www.montgomerycountymd.gov/dot-dte/projects/summitave/index.html FACILITY PLANNING PHASE I STUDY Public Workshop #2 September 14, 2017

Upload: others

Post on 30-Apr-2022

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Summit Avenue Extension

Summit Avenue Extension Montgomery County Department of TransportationMontgomery County Department of Transportation

Project Purpose‒ Improve mobility on Connecticut

Ave (MD 185) and University Blvd (MD 193)

‒ Provide alternative route for Southwest-Northeast Travel

‒ Maintain and enhance community character

Project Location

1

Montgomery County Department of Transportation (MCDOT) Division of Transportation Engineering (DTE)

Project Website: http: //www.montgomerycountymd.gov/dot-dte/projects/summitave/index.html

FACILITY PLANNING PHASE I STUDY

Public Workshop #2September 14, 2017

Page 2: Summit Avenue Extension

Summit Avenue Extension Montgomery County Department of Transportation

• Life of a Transportation Project‒ 2012 Kensington Sector Plan and goals of project

• June 13, 2017 Workshop & Why are we here?

• Facility Planning Phase I (we are here…) - funded‒ Public Outreach; Data, Master Plan; Conceptual alternatives including No Build

‒ Planning Board and County Council’s Transportation, Infrastructure, Energy & Environment (T&E) Committee Review

• Facility Planning Phase II (35% Design) – funded, if T&E / Council directed‒ Public Input; preliminary engineering; soils; geometries; alignments; minimize and mitigate noise and

environmental; detailed scope, schedule & costs

• Final Design (PE), Right-of-way (RW), and Construction (CO) – NOT funded

• Project Data Analysis Overview

• Comments Received to Date & Next Steps9/7/2017

Welcome & Project Overview

2

Page 3: Summit Avenue Extension

Summit Avenue Extension Montgomery County Department of Transportation

3’

3

• Potential Improvements:‒ Construct extension of Summit

Avenue from Plyers Mill Road to

Connecticut Avenue

‒ Add a 125’ Plyers Mill Rd.

westbound left-turn lane at Summit

Ave.

‒ Extend Knowles Ave. eastbound left-

turn lane at Summit Ave. to 250’

Page 4: Summit Avenue Extension

Summit Avenue Extension Montgomery County Department of Transportation

Conceptual Design

3’

11’ 7’7’

4’ 4’

TRAVEL LANE WITHSIGNED SHARED ROADWAY

LOCAL BIKEWAY

TRAVEL LANE WITHSIGNED SHARED ROADWAY

LOCAL BIKEWAY

SIDEWALKSIDEWALK

Typical Section Option A

CONCRETEPAVEMENT

CONCRETE PAVEMENT

4

Page 5: Summit Avenue Extension

Summit Avenue Extension Montgomery County Department of Transportation

11’ 6’

3’

TRAVEL LANETRAVEL LANE SIDEWALK

Typical Section Option B

CONCRETE PAVEMENT

CONCRETE PAVEMENT

ASPHALT PAVEMENT

10’ 6’

3” HIGH CONCRETE MOUNTABLE CURB

3’

TWO-WAY SEPARATED BIKE LANE

SIDEWALK

Conceptual Design

3’

5

Page 6: Summit Avenue Extension

Summit Avenue Extension Montgomery County Department of Transportation

MD 185 and MD 193 Intersection Alternatives

6

Perry Ave

MD

18

5

• Summit extension added as west leg to Connecticut / University intersection

• Full set of movements allowed to/from Connecticut and University for Summit extended

• Modify median and adjust signal timings

Alternative 1

Page 7: Summit Avenue Extension

Summit Avenue Extension Montgomery County Department of Transportation

Alternative 2MD 185 and MD 193 Intersection Alternatives

7

Perry Ave

MD

18

5

• Summit extension added as west leg to Connecticut / University intersection

• University, Connecticut, and Perry become one-way

• Full set of movements allowed to/from Connecticut and University for Summit

• Property impacts along Perry Ave.• Modify median, adjust signal

timings, remove or reallocate excess pavement

Page 8: Summit Avenue Extension

Summit Avenue Extension Montgomery County Department of Transportation

Alternative 3

MD 185 and MD 193 Intersection Alternatives

8

Perry Ave

MD

18

5

• Summit extension added as west leg to Connecticut/University intersection

• University and Perry become one-way• Full set of movements allowed to/from

Connecticut and University for Summit

• Property impacts along Perry Ave.• Modify median, adjust signal

timings, remove or reallocate excess pavement

Page 9: Summit Avenue Extension

Summit Avenue Extension Montgomery County Department of Transportation

9

• Projected 2040 level of service

• Signalized intersections on Connecticut

• No-Build vs. Alts 1-3

• LOS the same or minor improvement with 10% diversion of traffic

Page 10: Summit Avenue Extension

Summit Avenue Extension Montgomery County Department of Transportation

10

Plyers Mill Rd

860 (

2755)

2615 (

905)

155 (410)

300 (195)

Connecticut

Ave

Perry

Ave

Plyers Mill Rd

655 (

1870)

2940 (

1040)

180 (475)

345 (225)

Connecticut

Ave

Perry

Ave

Existing 2040 No Build

Plyers Mill Rd

660 (

1870)

2935 (

1035)

160 (360)

295 (185)

Connecticut

Ave

Perry

Ave

2040 Alt. 1

Traffic Volumes – Existing and Future AM (PM) Peak Hours

• Volumes in 2040 No-Build forecast to be higher than Existing – Operations will be worse• Heaviest southbound in morning and northbound in evening• Approximately 10% of peak direction Connecticut traffic diverts to Summit extended

Page 11: Summit Avenue Extension

Summit Avenue Extension Montgomery County Department of Transportation

Summit Ave Bridge Widening AnalysisBuild Alts - Summit Ave Bridge Section with

Additional Northbound Right-Turn Lane)Build Alts: Summit Ave Bridge Section

11

• Additional lane provides minimal traffic benefit

• Estimated cost (~$600K) for adding one lane only

• Additional costs for bicycle and pedestrian accommodations

• Prefer consistency with thru section

Page 12: Summit Avenue Extension

Summit Avenue Extension Montgomery County Department of Transportation

Summary – Property Impacts

Alt 1,2,3

Alt 2 Alt 3

Potential Displacements

(EA)

Fee Simple(Acres)

Alt 1 7 2.64

Alt 2 8 2.76

Alt 3 7 2.70

No Build 0 0.012

Page 13: Summit Avenue Extension

Summit Avenue Extension Montgomery County Department of Transportation

Note: Estimated costs do not include design and construction management.

Estimated Right-of-Way (ROW) and Construction Costs

No Build

Alternate 1

Alternate 2

Alternate 3

ROW and Relocation Cost

$0 $14.0M $14.6M $14.3M

Roadway Cost $0 $4.1M $7.0M $5.9M

Bridge Widening Cost $0 $0.6M $0.6M $0.6M

Total $0 $18.7M $22.2M $20.8M

13

Page 14: Summit Avenue Extension

Summit Avenue Extension Montgomery County Department of Transportation

1. Maintain and enhance community character and enhance neighborhood access

2. Improve walking and bicycle access across MD 185

3. Coordinate with Fire and Rescue Coordination

4. Discourage cut-thru and high speed traffic (Summit Ave., Knowles Ave., east of MD 185 / MD 193 etc.)

5. Grid concepts

6. Roundabout at MD 185 / MD 193

7. Consider interim connection to Dupont

8. No need for Parking on Summit Avenue Bridge

9. Transit Stop Improvements at Safeway and Turn lanes along MD 1859/7/2017

General Comments Received to Date

14

Page 15: Summit Avenue Extension

Summit Avenue Extension Montgomery County Department of Transportation

• Comment period EXTENDED from June 30, 2017 to October 16, 2017

• Review and summarize comments – Fall 2017

• Prepare Study Summary Report – Spring 2018

• Planning Board & Council T&E Overview – Spring / Summer 2018

• Phase II – Facility Planning, if approved – Fall 2018

• PE, RW and CO not funded at this time

9/7/2017

Schedule & Next Steps

Contact:John B. “JT” Thomas, Planning Section ManagerMCDOT Division of Transportation Engineering

100 Edison Park Drive, 4th Floor, Gaithersburg, MD [email protected] 240.777.7240

15

Page 16: Summit Avenue Extension

Summit Avenue Extension Montgomery County Department of Transportation

9/7/2017

Questions???

E-mail or mail in written comments until October 16, 2017

https://www.montgomerycountymd.gov/dot-dte/projects/summitave/index.html