sunguide sm software development project test readiness review (trr) meeting november 1, 2005
DESCRIPTION
SunGuide SM Software Development Project Test Readiness Review (TRR) Meeting November 1, 2005. Agenda. Introductions. Agenda. Logistics. Test location: FDOT Lab Meetings: Conf Room: B block Break: C2C Lab Lunch SwRI Cafeteria Internet: Available in the lobby (100baseT connection). - PowerPoint PPT PresentationTRANSCRIPT
SunGuideSunGuideSMSM Software Development Project Software Development Project
Test Readiness Review (TRR) MeetingTest Readiness Review (TRR) MeetingNovember 1, 2005November 1, 2005
November 1, 2005SunGuide TRR Meeting 2
AgendaAgenda
Time Item Lead
1:30 – 1:35 Introductions Liang Hsia
1:35 – 1:40 Logistics Steve Dellenback
1:40 – 1:55 Testing ProcessTest Procedures
Steve Dellenback /Robert Heller
1:55 – 2:00 Hot Wash-up Meeting Steve Dellenback
2:00 – 2:15 Questions / Comments All
November 1, 2005SunGuide TRR Meeting 3
Introductions
November 1, 2005SunGuide TRR Meeting 4
AgendaAgenda
Time Item Lead
1:30 – 1:35 Introductions Liang Hsia
1:35 – 1:40 Logistics Steve Dellenback
1:40 – 1:55 Testing ProcessTest Procedures
Steve Dellenback /Robert Heller
1:55 – 2:00 Hot Wash-up Meeting Steve Dellenback
2:00 – 2:15 Questions / Comments All
November 1, 2005SunGuide TRR Meeting 5
LogisticsLogistics
Test location:
– FDOT Lab Meetings:
– Conf Room: B block Break:
– C2C Lab Lunch
– SwRI Cafeteria Internet:
– Available in the lobby (100baseT connection)
November 1, 2005SunGuide TRR Meeting 6
November 1, 2005SunGuide TRR Meeting 7
Document StatusDocument Status
Documents delivered to FDOT over the last month:– Software Requirements Specification (SRS)– Software Integration Plan (SIP)– Software Integration Case Procedures (SICP)– Database Design Document (DBDD)– Software User’s Manual (SUM)– Version Description Document (VDD)– Training Plan (TP)
Other deliverables:– Rational RequisitePro database– Source CDs– Installation CDs
Outstanding Deliverable:– Software Design Document (SDD)
November 1, 2005SunGuide TRR Meeting 8
AgendaAgenda
Time Item Lead
1:30 – 1:35 Introductions Liang Hsia
1:35 – 1:40 Logistics Steve Dellenback
1:40 – 1:55 Testing ProcessTest Procedures
Steve Dellenback /Robert Heller
1:55 – 2:00 Hot Wash-up Meeting Steve Dellenback
2:00 – 2:15 Questions / Comments All
November 1, 2005SunGuide TRR Meeting 9
Purpose of TRRPurpose of TRR
Purpose:– Review preparations for testing– Walk through the test procedures at a very high level and
determine if anyone has any comments
Ground Rules:– Testing will not depart from the written procedures– Any requested “ad hoc” testing will occur after the formal
testing process
Approvals:– FDOT/SwRI will witness each test case (on “Master SICP”)– At the conclusion, FDOT will sign SICP cover page to
acknowledge all tests were executed as written/noted in the “Master SICP”.
November 1, 2005SunGuide TRR Meeting 10
Schedule for TestingSchedule for Testing
Date / Time Item Lead
November 11:30 – 2:00
Test Readiness Review (TRR) Meeting:Discuss testing processReview test procedures
Steve Dellenback
November 12:00 – 6:00
Testing using the Software Integration Case Procedures document (“rolling” breaks) SwRI Team
November 28:30 – 5:00
Testing using the Software Integration Case Procedures document (1 hour lunch and “rolling” breaks) SwRI Team
November 38:30 – 2:00
Testing using the Software Integration Case Procedures document(1 hour lunch and “rolling” breaks)
SwRI Team
November 32:00 – 3:30
Retest of any previously identified test failures SwRI Team
November 33:30 – 4:30
Hot Wash-up Meeting (to discuss testing results)Steve Dellenback / Robert Heller
“Free Play” in the lab if we are done early
November 1, 2005SunGuide TRR Meeting 11
Test Case ExampleTest Case Example
November 1, 2005SunGuide TRR Meeting 12
Release 1.1 Integration CasesRelease 1.1 Integration Cases
IC-1: Core Processes:– User (AS)– Status Logger (SL)– Executive Handler (EH)– Data Distribution (DD)– Operator Map (OM)
IC-2: Dynamic Message Sign (DMS) IC-3: Video (CCTV) IC-4: Transportation Sensor Subsystem (TSS) IC-5: Incident Management (IM) General Requirements
November 1, 2005SunGuide TRR Meeting 13
Release 2.0 Integration CasesRelease 2.0 Integration Cases
IC-6: Subsystem Updates:– Graphical User Interface (GUI)– Closed Circuit Television (CCTV)– IM
IC-7: Trailblazer IC-8: Safety Barrier (SB) IC-9: Roadway Weather Information System (RWIS) IC-10: Highway Advisory Radio (HAR) IC-11: Ramp Metering Subsystem (RMS) IC-12: Center-to-Center (C2C) IC-13: Web Server (WS) IC-14: Emergency Evacuation (EE) IC-15: Inventory and Maintenance Subsystem (IMS) IC-16: Data Archiving (DA) IC-17: Travel Times (TvT) General Requirements (not attributed to any one IC)
November 1, 2005SunGuide TRR Meeting 14
Questions About Test Cases?
November 1, 2005SunGuide TRR Meeting 15
Computer LayoutComputer Layout
November 1, 2005SunGuide TRR Meeting 16
Documents Available in the LabDocuments Available in the Lab
Paper:– Concept of Operations (ConOps)– Software Requirements Specification (SRS)– Software User’s Manual (SUM)– Functional Configuration Audit (FCA)– Software Integration Plan (SIP)– Software Acceptance Test Plan (SATP)– Software Integration Case Procedures (SICP): master copy
and individual copies for all participants– Contractual Documents (Scope of Services, Requirements,
ECO #1, draft ECO #1.1)
Electronic:– All
November 1, 2005SunGuide TRR Meeting 17
Environment NoteEnvironment Note
Note that SwRI has both “real” equipment and simulators in the lab
There are times that the simulators “mis-behave” and we find ourselves “re-testing” to achieve the results
The “re-tests” do NOT require software modifications
For example, a drunk driver took out the power (actually causes a short on the power lines and toasted a number of devices such as voice mail) to SwRI last week and the Cortec Codecs have never been the same.
November 1, 2005SunGuide TRR Meeting 18
Next Steps… (after this week)Next Steps… (after this week)
Deployment to District 6– Scheduled to start the week of Nov 7th – Training during the week of Nov 15th and/or 21st based
on D6 staff availability– Factors to simplify installation:
• Recent milestone demonstration overcame a number of communication issues
• SunGuideSM D6 database is fairly mature
Future development– Based on FDOT approval– Planned enhancements will be 2.x (no formal FAT)
November 1, 2005SunGuide TRR Meeting 19
Test PreparationTest Preparation
Document cleanup– Published final versions of Release 2.0 documents
Prepared VSS and Clear Case repository of Release 2.0 software (source code and installer) to the FDOT Central Office
Test director led several dry runs through the SICP– Anomalies within the SICP corrected– Anomalies within the Release 2.0 software corrected
November 1, 2005SunGuide TRR Meeting 20
Project FactoidProject Factoid
Development activities (25 months):– Began October 7, 2003– Ended November 3, 2005– Initial project schedule requested by FDOT: 25 months– Staff time: 48,577 hours
Costs: – Release 1: $4,335,554 (spent $4,321,459)– Release 2: $2,732,303 (projected $2,307,432)– Development under-run: $225K
Lines of code: 925K SLOC (generic framework saved SLOCs)
November 1, 2005SunGuide TRR Meeting 21
AgendaAgenda
Time Item Lead
1:30 – 1:35 Introductions Liang Hsia
1:35 – 1:40 Logistics Steve Dellenback
1:40 – 1:55 Testing ProcessTest Procedures
Steve Dellenback /Robert Heller
1:55 – 2:00 Hot Wash-up Meeting Steve Dellenback
2:00 – 2:15 Questions / Comments All
November 1, 2005SunGuide TRR Meeting 22
Hot Wash-Up MeetingHot Wash-Up Meeting
Purpose:– Anomalies identified during testing are discussed and
everybody agrees on what happened – Results are captured in a Hot Wash-Up minutes (one set
of minutes for the entire week of testing)
After the testing period, SwRI will develop a Software Test Reports which contains:– Summary narratives of the test results– Identification of problems or failures– Recommended resolutions of anomalies observed– Copies of witnessed data sheets
November 1, 2005SunGuide TRR Meeting 23
AgendaAgenda
Time Item Lead
1:30 – 1:35 Introductions Liang Hsia
1:35 – 1:40 Logistics Steve Dellenback
1:40 – 1:55 Testing ProcessTest Procedures
Steve Dellenback /Robert Heller
1:55 – 2:00 Hot Wash-up Meeting Steve Dellenback
2:00 – 2:15 Questions / Comments All
November 1, 2005SunGuide TRR Meeting 24
Bonus Material:Bonus Material:Comments received on SICP on 11/1 at 9:20Comments received on SICP on 11/1 at 9:20
Comments in “need to look at XML” category:– SwRI was told emphatically by FDOT to not show XML
(using client tester) during FAT 1.0– SwRI wrote tests that “did not show XML” based on
FDOT’s direction - SwRI is happy to show XML Changes:
– Several “pen and ink” changes are being made: SwRI will distribute color coded changes as single sheets during the testing
No changes needed:– Some comments were already “corrected” by the most
recent version of the SICP Editorial:
– Several comments editorial in nature (no response needed)
November 1, 2005SunGuide TRR Meeting 25
Bonus Material:Bonus Material:TemplatesTemplates
During testing you will see sign and response plans with a variety of message formats
These are “template” driven and configurable by the administrator.
November 1, 2005SunGuide TRR Meeting 26
Bonus Material:Bonus Material:Issue Tracking / Knowledge BaseIssue Tracking / Knowledge Base
During July meetings SwRI was asked for a better FAQ / Knowledge base solution
SwRI evaluated a number of products, have procured “FootPrints” (web based)
Will demo on Thurs afternoon
November 1, 2005SunGuide TRR Meeting 27
Questions / Answers