Page 1: Sunrise JTA Project Jobs and Transportation Act. Project Vicinity I-205 Downtown Portland Oregon City

Sunrise JTA ProjectSunrise JTA ProjectJobs and Transportation ActJobs and Transportation Act

Page 2: Sunrise JTA Project Jobs and Transportation Act. Project Vicinity I-205 Downtown Portland Oregon City

Project VicinityProject Vicinity

I-205

DowntownPortland

Oregon City

Page 3: Sunrise JTA Project Jobs and Transportation Act. Project Vicinity I-205 Downtown Portland Oregon City

Sunrise Corridor BackgroundSunrise Corridor Background

Began planning in 1980s – I-205 to US 26DEIS 1993, paused for regional land use

considerations (Damascus)Clackamas County adopted Preferred

Alternative 1996ODOT and Clackamas County acquired land:

◦“Superfund” site and other properties◦Camp Withycombe property, ODOT District Office

Page 4: Sunrise JTA Project Jobs and Transportation Act. Project Vicinity I-205 Downtown Portland Oregon City

Sunrise FEISSunrise FEIS

Clackamas County $19 million earmark

ODOT $20 million OTIA III

SDEIS began 2004 – I-205 to Rock Creek Junction

SDEIS published – October 2008

Preferred Alternative selected July 2009 - $1.4 billionFinal Environmental Impact Statement (FEIS)

published December 2010

Record of Decision (ROD) February 2011

Page 5: Sunrise JTA Project Jobs and Transportation Act. Project Vicinity I-205 Downtown Portland Oregon City

Sunrise FEISSunrise FEIS

Rock Creek Junction

122nd. Avenue

I-205

Page 6: Sunrise JTA Project Jobs and Transportation Act. Project Vicinity I-205 Downtown Portland Oregon City

Jobs and Transportation ActJobs and Transportation Act2009 Legislature: HB 2001 / Jobs and

Transportation Act or JTA, dedicated $100 million towards the design and construction of the Sunrise

$130 million total available

$30 million Right of Way acquired / available

Practical Design emerged

Multiple Design Exceptions will be necessary

Page 7: Sunrise JTA Project Jobs and Transportation Act. Project Vicinity I-205 Downtown Portland Oregon City

Rock Creek Junction

122nd. Avenue

I-205

JTA Projects compared to FEISJTA Projects compared to FEIS

Page 8: Sunrise JTA Project Jobs and Transportation Act. Project Vicinity I-205 Downtown Portland Oregon City

Coordination ComplexityCoordination Complexity

ODOT 2B Maintenance Facility Modification

OIW Streetcar Test Track Accomodation

Relocate Industrial (Minuteman) Way

OIW Access Structure Former NW Pipe & Casing

Site (CERCLA) EPA Well Relocation Local Access Road Building Demolition UST Removal Early Tree Removal

Page 9: Sunrise JTA Project Jobs and Transportation Act. Project Vicinity I-205 Downtown Portland Oregon City

StakeholdersStakeholders

EPA/DEQ – Superfund Cap ManagementUSACE - Unexploded OrdnanceUPRR - crossing closure, a proposed 4th UPRR

Rail line, and a pier protection wallDEQ – Wetland fill / RemediationWES – Stormwater approvalDEQ – Solid waste encapsulationMilitary – Access/securityClackamas County Development Agency –

public land managementODOT District 2B

Page 10: Sunrise JTA Project Jobs and Transportation Act. Project Vicinity I-205 Downtown Portland Oregon City

Value Engineering AdjustmentsValue Engineering Adjustments

How much of the FEIS Preferred Alternative do we stage or construct for◦82nd Over I-205 Bridge◦122nd Interchange Embankment

R/W impacts: FEIS acquisition, JTA partial, or a retaining wall

◦Soundwalls - FEIS or JTABicycle/Pedestrian Connections

◦SUP 1 and SUP 2

Page 11: Sunrise JTA Project Jobs and Transportation Act. Project Vicinity I-205 Downtown Portland Oregon City

““Design Excursions”Design Excursions”

Soundwall #2 Location at Camp Withycombe

ODOT District 2B ReconfigurationDesign Speed ConcernsStormwater Design “approval”UXO remediation project stalled“What would it take to keep the at-grade

railroad crossing at Lawnfield Road”

Page 12: Sunrise JTA Project Jobs and Transportation Act. Project Vicinity I-205 Downtown Portland Oregon City

Procurement/BiddingProcurement/Bidding

Industrial Way ExtensionAlternative Contracting

◦Disadvantaged Business Enterprises◦Oregon Firms

Right of Way HoldoutsAdditive Alternative Work Options

◦SUP 1 - I-205 to Lawnfield◦SUP 2 - Mather Road to 122nd

Page 13: Sunrise JTA Project Jobs and Transportation Act. Project Vicinity I-205 Downtown Portland Oregon City

ConstructionConstruction

Station and OffsetStaging & Erosion ControlEmbankment constructionDesign Excursions Continue

◦Widening to 4 lanes◦Tolbert Overcrossing◦“What would it take to remove the OIW

structure”◦Higher and best use

Page 14: Sunrise JTA Project Jobs and Transportation Act. Project Vicinity I-205 Downtown Portland Oregon City

Looking EastLooking East

Page 15: Sunrise JTA Project Jobs and Transportation Act. Project Vicinity I-205 Downtown Portland Oregon City

8282ndnd over I-205 Bridge over I-205 Bridge

Page 16: Sunrise JTA Project Jobs and Transportation Act. Project Vicinity I-205 Downtown Portland Oregon City

8282ndnd over I-205 Bridge over I-205 Bridge

Page 17: Sunrise JTA Project Jobs and Transportation Act. Project Vicinity I-205 Downtown Portland Oregon City

Emmert InternationalEmmert International

Page 18: Sunrise JTA Project Jobs and Transportation Act. Project Vicinity I-205 Downtown Portland Oregon City

Looking WestLooking West

Page 19: Sunrise JTA Project Jobs and Transportation Act. Project Vicinity I-205 Downtown Portland Oregon City

UXO, Mud & KerrUXO, Mud & Kerr

Page 20: Sunrise JTA Project Jobs and Transportation Act. Project Vicinity I-205 Downtown Portland Oregon City

QuestionsQuestions