SUNRISE SOLUTIONS Relocatable Housing Solutions for Construction Worker Deployments

SCALABLE RELOCATABLE TRANSPORTABLE C O M F O R TA B L E

1521 Azalea Road, AL 36693 USA • 251.660.8582 • www.SunriseSolutions.org • [email protected]

Page 2: Sunrise Solutions, Inc. Housing for Construction

SUNRISE SOLUTIONS

Base Operations and Life Support • Facilities Mfg & Installation • Site Prep & Infrastructure Power Generation • Information Technology Systems • Operations and Maintenance •

Mo

Flat-Pack Modules Housing Units Kosovo Camp Project

Sumter Regional Hospital

Past Sunrise Projects

Page 3: Sunrise Solutions, Inc. Housing for Construction

SUNRISE GLOBAL REACH

Page 4: Sunrise Solutions, Inc. Housing for Construction

SELECTED PRIOR SUNRISE GROUP O ECTS

USA IRAQ KOSOVO & BOSNIA OTHER U.S. OP’S FEMA – Hurricanes Katrina

& Rita Seven (7) First Responder Support Camps – 9000 PAX

FEMA – Hurricane Ike Two (2) First Responder Support Camps – 2500 PAX

FEMA – North Dakota Floods First Responder Support Camp – 500 PAX

FEMA – Hurricane Katrina Hospital Staff Modular Housing Units – 100 PAX

FEMA – Hurricane Sandy Four (4) First Responder Support Camps – 8000 PAX

Nasiriya – Int’l Military Coalition Mission Support Facilities – 4600 PAX

Basra – ENI Contingency Operating Base Const’n Workers Camp – 100 PAX

Baghdad Airport Airfield – Iraqi Intelligence Agency Mission Support Camp – 500 PAX

Adnan Palace & Ext’n Site – Turn-Key Mission Support Camps – 2000 PAX

Basra & Tallil – Int’l Military Coalition Mission Support Camps – 1000 PAX

Belo Poljie (Kosovo) – Italian + NATO Military Operations Camp (NATO Maint & Supply Agency [NAMSA]) – 3000 PAX camp with expansion to 5000 PAX during 2 year facilities program. All life support facilities design, mfr, installation and camp operations & maintenance services provided.

Bosnia – NAMSA Three (3) Peace-keeping operations camps, including: Design, Build, O&M Mgmt Services – 2000 PAX

DHS / USACE – Temporary Housing Sites Infastructure – Wastewater Treatment Systems Design & Install

FEMA – Temporary Housing Sites Modular Units Deployment and Installation

Sumter Regional Hospital Authority – Fast-track design build of 75,000 sf, 77-Bed, Full-service hospital, including: OR, ER, ICU, Trauma, MRI, Pre-Op, Recovery, Exam, Dialysis, Rehab, Lab, Central sterile, etc.

Page 5: Sunrise Solutions, Inc. Housing for Construction

SELECTED PRIOR SUNRISE GROUP O ECTS

Workers Camp Kitchen Deployable Ablution Units

Sumter Regional Hospital

FEMA First Responders Support Camp Flat-Pack CHU Modules Set-Up

Workers Camp Dining Facility First Responder Camp D’Fac

CHU’s w/ Transportable Utilities Mgmt Sys

Page 6: Sunrise Solutions, Inc. Housing for Construction

SUNRISE SOLUTIONS, INC.

• Sunrise provides complete projects for all of your housing needs, from design through procurement, manufacture, logistics, site preparation, engineering, construction and operations.

• Sunrise has worked in some of the most challenging countries and environments in the world, working for the US military, as well as, oil and gas companies and major engineering and construction companies.

• Sunrise has experience in Latin America and ready to support HIA’s needs for portable housing in South America and anywhere in the world.

Page 7: Sunrise Solutions, Inc. Housing for Construction

RELOCATABLE WORK FORCE HOUSING PROGRAM

• Sunrise will design & build each relocatable housing

complex on the Owner provided site. • Sunrise will evaluate & prepare prospective sites

and intermodal truck access to include consideration for design / build of access roads and camp structures.

• Sunrise will incorporate all Owner directed structures & support services as needed, including: Perimeter & Access Control, Accommodations, Admin/Operations Ctr, Armory & Munitions Storage, Kitchen / Dining Facility, Medical Clinic, Ablutions, Laundry, Recreation Ctr, Power Gen & Dist’n, Potable Water Provision & Distribution, Wastewater Mgmt & Treatment, Fuel Storage and Maint. & Workshop Fac’s.

• Sunrise will provide full on-going Camp

Operations & Maintenance services.

Page 8: Sunrise Solutions, Inc. Housing for Construction

DESIGN, DEPLOY,

BUILD, OPERATE &

RELOCATE

k F e

Complex

Page 9: Sunrise Solutions, Inc. Housing for Construction

IF YOU BUILD IT, THEY WILL COME! Movie: “Field of Dreams”

Program Kick-Off and Mobilization (Equipment & Logistics Plan) – Phase 1 o Sunrise will work with the Owner/Prime Contractor to determine the complete scopes of supply,

scheduling and program execution parameters – Soft to Hard &/or Soft/Hard Hybrid Complex. o Mobilization includes deployment of project executives, managers, supervisors & equipment.

Site Evaluation, Access Road Construction/Re-build & Site Preparation – Phase 2 o As a component of mobilization, Sunrise will deploy a site evaluation team to develop best solutions &

best management practices approach(es) for the prospective sites & to vet prospective local suppliers, vendors & subcontractors in order to establish reliable supply chains & project cost savings.

o Sunrise will develop & execute all necessary steps to construct/improve roads into each project site and perform necessary excavation, fill & grading, etc., to prepare each site for installation of the Complex.

Complex Design & Build – Phase 3 o Design, Manufacture & Acquisition of all Facilities Complex structures & support materials. o Construction / Installation of all Facilities Complex structures, infrastructure & support materials.

Operations & Maintenance Program – Phase 4 o Sunrise will deploy &/or hire local support personnel to manage & operate all life support functions for

ongoing operations, maintenance and administration of the Complex and Owner required deliverables.

Page 10: Sunrise Solutions, Inc. Housing for Construction

DESIGN, DEPLOY, BUILD & OPERATE Phased Program Approach

Phase 1 Phase 2 Phase 3 Phase 4 Relocation

Notification to Proceed - Begin

Mobilization

Mobilization Ends

Construction Begins

Construction of Staff Camp

Construction

Phase Begins Turnover

Phase Begins

Operational Phase

Begins

Demobilization & Relocation

Program

Staff Arrives

Set Up DFAC

Receive Deliveries

Menus Approved

Prep all areas for Phase 4

Food & Life Support

Services and Complex O&M

Demobilization, Relocation Completed,

O&M Restored at New Site

Page 11: Sunrise Solutions, Inc. Housing for Construction

PHASE 1 – Program Kick-Off & Mobilization Design Charrette & Logistics

Program Kick-Off and Mobilization (Equipment & Logistics Plan) – Phase 1

o Sunrise will work with the Owner/Prime Contractor to determine the complete scopes of supply, scheduling and program execution parameters – Soft to Hard Structures &/or Soft/Hard Hybrid Complex determinations.

Design & Engineering Plan o The Design Team will support the project from their home office & field sites incorporating our facilities in the U.S., Italy,

Switzerland and UAE. SSI and our Team Members have adequate design, engineering and support staff in our combined operations offices to support the project.

o The Design Project Manager will coordinate and lead the Design Team effort, providing management, oversight, and direction of the complete design. Upon notification of the award, we will finalize the engineering, architectural, and design needs and identify and mobilize design team personnel that have already been identified to match their skills, capabilities, experience, and availability with the requirements.

o The Design Project Manager (DPM) will coordinate all technical resources used to develop the design including Sunrise Solutions key subcontractor personnel assigned to support the design. This integration will insure that our construction approach, techniques and experience are incorporated throughout the design process and not only for our internal bidding, construction, operation and environmental practices functions. All design resources will report to the DPM.

Mobilization Plan o Mobilization includes deployment of: Project executives, Managers, Supervisors & Equipment (construction & facilities).

Logistics Program o Our Logistics Plan ensures timely and value added acquisition, transportation, country clearance, and delivery of materials

required for the Project. One of the most important functions for program success, the logistics effort starts with the contract award to Sunrise Solutions and terminates after the handover of the completed project to the client.

o The logistics manager, in Phase 2 (Construction) evaluates the scope of work with the project engineer to identify logistics requirements and in Phase 4 the operation and maintenance phase the logistics manager evaluates the scope of work with the camp manager to identify logistics requirements. Subsequent logistics analysis identifies the most efficient means to deliver goods and materials to meet the mission milestones time line.

Page 12: Sunrise Solutions, Inc. Housing for Construction

PHASE 1 – Program Kick-Off & Mobilization Design Charrette & Logistics

Site Plan Approach

o As a component of a design charrette program to determine final project scopes of supply & program execution protocols, we will develop solutions specific site plan(s).

o We will develop the best, most cost-effective solution approach for each Complex to include considerations for: Site Prep & Complex Installation Workers temporary Fly camp Complex facilities including all ‘Hard wall’ structures as necessary to meet the Program’s accommodations & life

support requirements. Consideration for integrating ‘Soft wall’ structures as appropriate to meet the Program’s accommodations & life

support requirements. It may be most cost-effective to deliver a mobile kitchen (including all food storage [dry, refrigerated, frozen, etc.], preparation & storage equipment and soft-wall mobile dining structure.

Many support structures such as: Dining, Laundry & Recreation, etc., could utilize soft membrane structures which are designed, delivered & erected so as to reduce total facilities & operating costs. Such structures may be utilized as a ‘Fly Camp’ to support the Site Preparation & Complex Construction Phase

o Because our modular units & support structures are scalable, we can develop a plan for expansion readiness. o Following are several typical Construction Workers Camp Complex Site Plans for initial consideration.

Page 13: Sunrise Solutions, Inc. Housing for Construction

PHASE 1 – Program Kick-Off & Mobilization Design Charrette & Logistics

Sample Facilities / Structures

o As a component of a design charrette program we will develop function-specific structures to include: Accommodation Units – VIP (Single Occupant Units) & Worker (2-Person Units) Kitchen – Food storage, Meals preparation, Clean-up & Consumables storage space & equipment Laundry – Options may include: Clean & Fold Services and/or Self-Serve Facilities Medical Care – Complexes can be designed / built to offer care ranging from: First Aid to Triage Care, depending on

Owner designations Recreation Facilities – May be fitted with exercise equipment, relaxation areas (game tables, TV/Movie viewing, etc.) Administrative Support Areas – Owner offices, Complex operations offices, Occupant services, etc. Maintenance, Op’s & Security Personnel Support Areas – Supplies storage, Equipment shelters, Armory & Munitions,

Guard stations, Access Control Points, etc. Communications Support Facilities – Telecommunications, CCTV, WiFi, etc.

o Sample floor plans of Modular Complex Structures are provided on the following pages.

Equipment List

o A list of equipment anticipated to prepare the site & install the facilities follows the Sample Structures Floor Plans. o Equipment will be mobilized for specific construction tasks. When the task is completed, the equipment will be demobilized.

When the schedule dictates that a specific piece or group of equipment be held on site until it is needed for another task, a cost analysis will be performed and provided to the Client / Owner.

Page 14: Sunrise Solutions, Inc. Housing for Construction

PHASE 1 – Program Kick-Off & Mobilization Design Charrette & Logistics

Sample VIP (Single Occupant) Accommodation Modules

Sample Worker (Double Occupant) Accommodation Modules

Page 15: Sunrise Solutions, Inc. Housing for Construction

PHASE 1 – Program Kick-Off & Mobilization Design Charrette & Logistics

Sample Kitchen & Dining Facilities Modular Structure – Designed for 100 PAX Complex, Expandable for 200 PAX

Page 16: Sunrise Solutions, Inc. Housing for Construction

PHASE 1 – Program Kick-Off & Mobilization Design Charrette & Logistics

Sample Modular Laundry Facilities

Sample Medical Care Modular Facilities

Page 17: Sunrise Solutions, Inc. Housing for Construction

PHASE 1 – Program Kick-Off & Mobilization Design Charrette & Logistics

Sample Recreation Facilities Structure

Page 18: Sunrise Solutions, Inc. Housing for Construction

PHASE 1 – Program Kick-Off & Mobilization Design Charrette & Logistics

Sample Modular Administrative Support Facilities Structures

Page 19: Sunrise Solutions, Inc. Housing for Construction

PHASE 1 – Program Kick-Off & Mobilization Design Charrette & Logistics

Sample Modular Storage & Support Facilities

Sample Modular Guard / ECP Bldg

Armory – Weapons Storage Unit May be Divided/Furnished As Nec’y

Ammunition Storage Unit May be Divided/Furnished As Necessary

Page 20: Sunrise Solutions, Inc. Housing for Construction

PHASE 1 – Program Kick-Off & Mobilization Design Charrette & Logistics

Logistics Plan Flow Chart

Page 21: Sunrise Solutions, Inc. Housing for Construction

PHASE 1 – Program Kick-Off & Mobilization Design Charrette & Logistics

Sample Camp Complex Program Deliverables List

Page 22: Sunrise Solutions, Inc. Housing for Construction

PHASE 2 – Site Evaluation, Access & Prep Initial Construction Program

Site Evaluation, Access Road Construction/Re-build & Site Preparation – Phase 2

o As a component of mobilization, Sunrise will deploy a site evaluation team to develop best solutions & best management practices approach(es) for the prospective sites & to vet prospective local suppliers, vendors & subcontractors in order to establish reliable supply chains & project cost savings.

o Site Survey: SSI will survey the proposed site, ensuring suitability of the land, and identifying the actual camp configuration. This will then be diagramed into industry acceptable prints, so all parties associated can collectively review, contribute and approve, again a systematic and uniformed approach, which will enable SSI to identify a viable material list, ensuring accountability of material cost.

o Sunrise will develop & execute all necessary steps to construct/improve roads into each project site. o Sunrise will perform necessary excavation, fill & grading, etc., to prepare each site for installation of the Complex. o Procurement: All vendors will be vetted and be held accountability to DFAR’s and FAR regulations, ensuring that materials

meet Western / European construction standards. Procurement officers will provide verification and record applicable documentation for auditing.

o Sunrise Solutions and our Affiliates are capable to perform many primary functions of the identified projects. o We will integrate local vendors, subcontractors, suppliers & resources wherever possible in order to keep costs down while

maintaining compliance with Program QA/QC and Health, Safety & Environmental requirements.

Page 23: Sunrise Solutions, Inc. Housing for Construction

PHASE 2 – Site Evaluation, Access & Prep Initial Construction Program

PROGRAM SITE EVALUATION, ACCESS & PREPARATION DELIVERABLES INCLUDE:

Manufacture of Pre-Engineered & Rapidly Deployable Modular Structures – Hard &/or Soft Wall Systems Manufacture of Modular and Expandable Water Management Systems

o Potable Water Systems o Wastewater Treatment & Effluent Disposal Systems (including containerized & larger package plants)

Installation of Site Infrastructure Components in Compliance with Program Design Designations o When both Client design and cost objectives are met with our proprietary products we will manufacture, deliver and install

them. In the event our own systems are not best suited for some or all of a specific project, Sunrise Solutions is prepared to design, incorporate and install alternative systems in order to accomplish the Owner’s total best value of cost & facilities systems.

Page 24: Sunrise Solutions, Inc. Housing for Construction

PHASE 3 – Complex Design & Build Construction Program

Design, Manufacture & Acquisition of all Facilities Complex structures & support materials. o Role of Construction Team in the Design stage: Members of the Construction Team - the Project Site Manager,

Construction Managers, Quality Control Manager, SHE Manager, and principle subcontractors – are integrated into the design effort. Their comments will be incorporated into the design prior to being submitted to the customer. Our Project Site Manager/DB Manager, is responsible for this horizontal integration.

o The Design QC Manager holds primary responsibility for ensuring all customer and user review comments are captured and incorporated into the design.

o The Sunrise Team will participate in Pre-work site visits and conferences, Design Charrette, and Design Review conferences. o The Pre-Work conference will include key Using Agency points of contact as appropriate to participate in pre-design

discussion items. o In the Design Charrette process, the Sunrise Team will conduct extensive interviews and problem solving discussions with

the individual users, base personnel, and customer representatives. This information will be documented and used by the Design Team to review user options and discuss user needs, and finalize the design. Upon notification, our Design Build/Site Project Manager will notify key project staff including the Construction Managers, Quality Control, Procurement and the Design Team.

o Our Construction personnel work closely with the Design Team to identify cost and schedule drivers, especially “long lead items” and to seek ways to streamline construction and efficiently manage our labor resources. Sunrise will implement an optimized design which will result in a streamlined and shortened design period.

o The Design Project Manager, will coordinate, lead, and manage the complete design effort. He will provide instant access throughout the design process for the Owner and the installation. He will lead all telephone conference meetings and face-to-face meetings during the design phase when the scope and design are being discussed.

o The DPM will coordinate the appropriate discipline leads to address issues associated with the specific disciplines. These leaders will attend our periodic reviews, as required to receive comments and articulate design thought.

o The Project Office and facility personnel will participate in regular, scheduled design review meetings to assure design compliance and installation requirements are incorporated into the final design.

Page 25: Sunrise Solutions, Inc. Housing for Construction

PHASE 3 – Complex Design & Build Construction Program

Construction / Installation of all Facilities Complex structures, infrastructure & support materials

o Sunrise Solutions is ideally suited to perform the Project as our past performance demonstrates. We maintain a database of skilled professionals available to ensure success. We are confident we can fulfill the requirements of this contract with the highest quality personnel due to our proven ability to protect & empower our people for their Program role(s).

o Sunrise Solutions will mobilize selected team members and deploy to the Project Site as required. We will ensure our personnel meet the following critical criteria:

All required security and background checks are complete and acceptable. All personnel are medically and physically fit and have received all required vaccinations. All personnel have all necessary passports, visa, entry permits, and other documents required for contractor

personnel to enter and exit the foreign country, including those required for in-transit countries. All personnel have received personal security training. All personnel have received isolated personnel training. All personnel are registered with the U.S. Embassy.

o Sunrise will administer the day-to-day project management of the construction phase. These personnel will meet all the requirements of the SOW.

o All personnel have extensive military and professional experience to perform the Project. They are experienced in construction, ongoing life support and O&M services as well as project management to ensure Program timelines are met.

o Sunrise Solutions personnel will exceed the requirements of the SOW and the expectations of the Owner. o Following is a sample Construction Phase Organization Chart which demonstrate our Project Management Approach.

Page 26: Sunrise Solutions, Inc. Housing for Construction

PHASE 3 – Complex Design & Build Construction Program

Sample Construction Phase Organization Chart

Page 27: Sunrise Solutions, Inc. Housing for Construction

OPERATIONS,

MANAGEMENT

& MAINTENANCE

SERVICES

Environmental

Quality Control

Quality Assurance

Page 28: Sunrise Solutions, Inc. Housing for Construction

PHASE 4 – Operations & Maintenance Life Support, Facilities Mgmt, Operations & Maintenance Program

Operations & Maintenance Program Overview o Sunrise will deploy &/or hire local support personnel to manage & operate all life support functions for ongoing operations,

maintenance and administration of the Complex and Owner required deliverables. Our services include: Complex Administration & Occupant Support, Facilities Maintenance, Utilities Supply (fuel, water, etc.), Waste Management (handling & disposal of solid waste & wastewater, etc.), Cleaning & Housekeeping, Food service, Medical Clinic Staffing and Owner Support Services.

o Facilities & Equipment Maintenance Services Will Include: Generator & electrical distribution equipment Fitness & Recreation facilities Water purification equipment / systems Communications systems – CCTV, WiFi / Ethernet, Voice & Data, etc. Wastewater treatment systems

o Complex Operations Support Services Will Include: Administration services, i.e., registration, check-in, check-out, badging, camp reports Food Preparation & Serving – Based on Owner approved menu program Janitorial services – Grounds-keeping & cleaning, etc. Housekeeping services – Cleaning & Sanitation, Re-stocking consumables, etc. Laundry services – Clean & fold worker clothing, linens & bedding, and/or Camp occupant self-serve facilities. Ablution (shower & toilet) facilities support – Soaps, detergents, supplies, etc.

Page 29: Sunrise Solutions, Inc. Housing for Construction

PHASE 4 – Operations & Maintenance Life Support, Facilities Mgmt, Operations & Maintenance Program

Operations & Maintenance Program – Food Services Overview o Sunrise will deploy &/or hire local support personnel to manage & operate all life support functions for ongoing

operations, maintenance and administration of the Complex and Owner required deliverables. o Sunrise Solutions provides healthy and consistent menu programs to suit any dietary requirement. Our services

feature culturally preferred meals and offer a variety of dishes and flavors to suit virtually any palate. Our meal services also include a balanced diet of proteins, starches, dairy, fruits, vegetables and breads, all prepared to HAACP standards.

o We are happy to customize the menu to suit Client requests and consistently offer Camp occupants outstanding, healthy and flavorful foods meeting all local health codes & regulations.

o Our food services include a full-service kitchen providing 3 hot meals per day. Boxed/prepared lunches are also available for occupants who are not in the camp during lunch hours.

o Each facility is operated in accordance with (IAW) USDA Food Codes. We provide and post a 14-day rotational menu. A sample of this menu will be provided and may be adjusted to accommodate specific requests. A salad bar is provided for all lunch & dinner menus.

o The food service program is overseen by trained chefs and food service supervisory personnel. o All associated equipment to operate the kitchen and dining facility are provided. o Equipment includes; refrigerated and dry storage, washing and preparation areas, baking areas and serving areas. o Dining Facilities are also provided with hand washing stations, tables & chairs, doors, lights, fire prevention devices,

and climate controls. The flooring in the kitchen and dining facility meets FDA requirements. o All associated equipment to operate the kitchen and dining facility are provided, including: place settings, condiments,

and napkins, etc. o Kitchen & Dining Facilities are available for meetings during non-operational periods. o 24-hour beverage service (coffee, juice, etc.), may also be provided, if requested. o Both kitchen & dining facilities include hand washing stations & are stocked with soap and paper towels. o Kitchen and Dining Facilities conform with 29 CFR 1910.6.

Page 30: Sunrise Solutions, Inc. Housing for Construction

HOUSING & LIFE SUPPORT

SOLUTIONS FOR CONSTRUCTION

WORKER DEPLOYMENTS