Design  Workgroup  Call  

August  16,  2016  9:00  AM  PDT  

 

SunSpec  Alliance  oSDX  

2  

An@trust  &  Intellectual  Property  Policy  

•  All  SunSpec  mee@ngs  are  conducted  in  accordance  with  the  SunSpec  An@trust  Policy  and  Intellectual  Property  Provisions  defined  in  the  SunSpec  Member  Agreement  and/or  the  SunSpec  Limited  Par@cipant  Agreement.  

•  Each  par@cipant  company  in  this  mee@ng  has  executed  either  one  or  the  other  of  these  agreements  and  all  par@cipants  must  comply  with  the  policy  and  provisions.  

•  Confiden@al  or  proprietary  informa@on  should  not  be  discussed  in  open  session.  Please  contact  SunSpec  management  if  you  have  any  ques@ons.  

3  

Agenda  

– Orange  BuUon  overview  – Describe  Workgroup  Process,  Schedule,  Roles,  Enrollment,  Logis@cs  

– Outline  mission  and  goals  of  the  Workgroup  – Derive  consensus  on  appropriate  topics    – Lay  out  roadmap  for  ordering  topics  – Review  relevant  standards  and  documents  that  should  inform  this  work  

4  

Standards  For  Solar  Bankability  

4  

Convene  

DS  

Data  Taxonomy  

Solar Industry

   

   

• Document  requirements  to  meet  industry  needs  • Manage  Stakeholder  Engagement  •  Strategy    

Data  Taxonomy  

 

Define  Integrate  • Data  Taxonomy  •  APIs  •  Tes@ng/Interoperability  

•  User-­‐friendly  so[ware  tools  and  capabili@es  

•  Data  Transla@on  and  Exchange  

5  

SGIP  and  SunSpec  Working  Groups  

               SunSpec  

SGIP  Opera9ons   Feasibility   Finance   Design   Construc9on  

Grid  Integra9on   ü      ü     Solar  O&M   ü     Deployment   ü      ü      ü     Financing   ü        ü     Real  Estate     ü      ü     

5  

6  

SunSpec  Open  Specifica@on  Development  Process  

6  

Market  Requirements  

Technical  Workgroup  Forma@on  

Use  Case  Priori@za@on  

Standards  Evalua@on  

Detailed  Gap  

Analysis  

Intellectual  Property  

Contribu@ons  

Taxonomy  &  Data  Model  Development  

Cer@fica@on  Test  

Development  

API    Mapping  &    Adapta@on  

Specifica@on  Development  

Open  Data  Interchange  Specifica9on  

Market  Adop@on  

7  

Workgroup  Roles  

•  Workgroup  Chair  o  Runs  calls,  records  issues,  assigns  tasks,  writes  agendas,  compile  

contribu@ons,  master  of  the  specifica@on  o  Taesung  Kim  ([email protected])  

•  Co-­‐Chair  o  Assist  Chair  o  TBD  

•  Authors/Contributors  o  Write  sec@ons  of  specifica@ons  

•  Reviewers  o  AUend  calls,  comment  on  workgroup  deliverables  

•  SunSpec  o  Coach  Chair  &  Co-­‐Chair,  host  and  compile  documents,  manage  

par@cipants,  outreach,  record  mee@ng  notes  and  aUendance  during  calls  

8  

Workgroup  Planning:  Enrollment    

•  Par@cipants  must  have  a  completed  IP  Agreement  o  hUp://sunspec.org/par@cipate-­‐sunspec-­‐osdx-­‐program/  

•  Or  be  a  member  of  SunSpec  Alliance  o  hUp://sunspec.org/join-­‐sunspec-­‐today/  

•  Forward  enrollment  ques@ons  to  [email protected]  OR  send  to  above  link  

9  

Workgroup  Outreach  

•  SunSpec  will  host  standing  calendar  invita@ons    •  SunSpec  will  also  send  emails  at  least  2  business  days  prior  to  mee@ng  

 •  Both  will  include  agenda  and  mee@ng  coordinates  

10  

Workgroup  Tools  

•  Teamwork  o  Repository  for  working  documents  o  Accessible  by  formally  enrolled  par@cipants  

– SunSpec  manages  access  •  SunSpec  Website  

o Workgroup  specific  pages  o  Links  to  Teamwork  o  Host  content  ready  for  public  consump@on  

•  Microso[  Word,  Excel,  PDF  

11  

Workgroup  Schedule  

•  Opera@ons  -­‐  Monday,  August  15  @  8:00  am  PT  o  hUps://[email protected]/join/690132277  

•  Project  Feasibility  -­‐  Monday,  August  15  @  9:00  am  PT  o  hUps://[email protected]/join/771605509  

•  Finance  -­‐  Monday,  August  15  @  10:00  am  PT  o  hUps://[email protected]/join/257567365  

•  Design  -­‐  Tuesday,  August  16  @  9:00  am  PT  o  hUps://[email protected]/join/126583301  

•  Construc@on  -­‐  Tuesday,  August  16  @  11:00  am  PT  o  hUps://[email protected]/join/383550005  

12  

First  Mee@ngs  

•  All  workgroups  will  open  with  a  series  of  at  least  3  calls  that  are  open  to  the  public  

•  Workgroup  Road  Map  of  Topics  

•  Compiling  relevant  documents,  technology  and  standards  that  should  inform  the  work  

13  

Workgroup  Topics  

14  

Design  Workgroup  Mission  

Dra[  to  be  discussed    Develop   and   publish   DER   design   data   taxonomy,  informa@on   models   and   interchange   standards,  based  on  the  SWG-­‐generated  Market  Requirements  Document   (MRD),   harmonized   with   each   of   the  func@onal   categories   of   Feasibility,   Construc@on,  Opera@ons  and  Finance,  resul@ng  in  a  specifica@on  that   is   ready   to   use,   allows  data   portability   across  the  value  chain,  increases  solar  bankability  through  data   transparency,   allows   for   richer   analy@cs,   and  will  enable  the  industry  to  grow  fast  and  thrive.    

15  

Ques@ons  to  be  Answered  

•  The  Six  Topics  Iden@fied  as  part  of  Design  Data  are  on  the  previous  slide.      o  Is  this  the  correct  way  to  compartmentalize  this  work  group?  o  Priori@ze  or  ordering  of  topics  

•  Design  documenta@on  is  very  important  to  the  process.    Should  we  keep  some  of  these  documents  in  electronic  storage,  or  should  we  just  try  to  capture  certain  important  data  from  them?  

•  We  encourage  all  in  this  WG  to  be  ac@ve  in  A-­‐group  mee@ngs,  input  and  review  to  help  produce  a  complete  and  meaningful  Market  Requirements  Document  (MRD).  o  While  the  SGIP  Deployment  WG  is  most  per@nent  to  Design  Data,  all  SGIP  WGs  are  important.  

16  

Goals  –  Major  Milestones  

 •  Review  MRD  and  perform  standards  evalua@on  and  GAP  analysis  

o  Ini@al  review  by  November  1,  2016  •  Develop  Product  Requirements  Document  (PRD)  

o  Ini@al  dra[  by  December  1,  2016      •  Develop  data  standards  and  technical  dra[s    

o  Ini@al  dra[s  by  January  1,  2017  •  Develop  API’s  and  compliance  test  framework    

o  Ini@al  release  by  February  1,  2017  •  Itera@ve  process  running  through  November  2017  

o  Work  in  close  coordina@on  with  SWG  while  MRD  is  being  developed  o  Address  as  many  use  cases  from  MRD  as  is  feasible  

17  

Interna@onal  Standards,  Best  Prac@ces,  and  Exis@ng  Taxonomies  (par@al  list)  

o  Design  and  equipment  standards  from  IEC  o  Construc@on  standards  from  ASTM  o  Codes,  regula@ons  (and  the  version  used),  such  as  NEC  (2011)  and  local  AHJ’s  

o  IEC  RE  concep@on  through  final  acceptance  Cer@ficate  data  

o  SunSpec  documents  – Best  Prac@ces  in  Solar  PV  Installa@on  – Best  Prac@ces  in  PV  Performance  Assessment  – SunSpec  Plant  Informa@on  Exchange  specifica@on  

 

18  

Homework  

•  Review  and  compile  further  relevant  data,  documents  and  standards  

•  Consider  the  topics,  propose  other  topics  •  Consider  the  ques@ons,  propose  other  ques@ons  •  Study  the  IECRE  Cer@ficate  data  set  •  Join  one  or  more  SGIP  WGs  •  Enroll:  hUp://sunspec.org/par@cipate-­‐sunspec-­‐osdx-­‐program/