sunway university- banker presentation
TRANSCRIPT
SUNWAY UNIVERSITY
NEW UNIVERSITY BUILDING
Project Brief
Project Title : Cadangan Tambahan dan Ubahsuai Sebuah University
(Sunway University) yang Mengandungi :-
1) 1 Blok Institusi Pendidikan dan 2 Tingkat Sub-Besmen
2) Sebuah Pondok Pengawal
3) Sebuah Pusat Pembuangan Sampah
4) Sebuah Pusat Pencawang Elektrik
Di Atas Lot-Lot PT. 28, PT. 1904, Dan PT. 1905, Bandar Sunway,
Mukim Damansara, Daerah Petaling, Negeri Selangor Darul Ehsan,
Untuk Tetuan Sunway Destiny Sdn. Bhd.
Date of Commencement : 15th August 2012
CCC Date (Phase 1- Car Park) : 26th Dec 2013
CCC Date (Phase 2- Tower Block) : 5th March 2015
CPC Date : 5th March 2015
Contract Sum : RM 203 917 687.49
Project Brief
List of Client & Consultants:
Client : Sunway Destiny Sdn Bhd
Architect : SA Architects Sdn Bhd
C & S Engineer : Perunding ACE Sdn Bhd
M & E Engineer : KTA Tenaga Sdn Bhd
Post Tension Engineer : PT Solutions Sdn Bhd
Interior Designer : Sunway Design Sdn Bhd
Quantity Survey : Langdon & Seah Sdn Bhd
Project Brief
Additional Information
Total Land Size : 68, 121m2
Land Area (Tower) : 10, 660m2
Floor Area : 52, 530m2
Lecture Theater Seating Capacity : 112 nos.
Auditorium Seating Capacity : 452 nos. (Auditorium 1)
: 610 nos. (Auditorium 2 & 3)
Laboratory : 22 nos.
(Animal Lab, Toxicology Lab, Cell / Molecular Lab, Industrial Incubator Lab, Virology Lab, Physiology Lab, Medical Biotech Lab)
Kitchen : 5 nos.
New University Building
• World Class as brand new state-of-the-art university
building
• equipped with excellent facilities and infrastructure
• easy access to all of the facilities of Sunway Resort
City via canopy walkway.
Overview of Building (Day View)
Overview of Building (Evening View)
Overview of Building (Night View)
Drop Off 1,Concourse
Bird Sculpture, Concourse
Cafeteria, Concourse
Cafeteria, Concourse
Lounge, Concourse
Lounge & Library Search, Library
Computer Area, Library
Library (Help Desk)
Library (Book Shelves)
Library (Study Area)
Basement Library (Water Feature)
Student Center, B1 Link
Dance Studio, B1 Link
Common Lift Lobby
Exec. Lift Lobby, Level 12
Cafeteria, Mezzanine Floor
Open Deck, Mezz Cafe
Pre Function, Level 1
Auditorium 1 (JC 1)
Auditorium 2 (JC 2)
Auditorium 3 (JC 3)
Lecture Theatre
IT Services, Comp Labs, Level 2
Public Search Area, Comp. Lab
Computer Labs, Level 2
Classrooms
Laboratories, Level 4
Mock-Up Room SHTLM, Level 5
Mock-Up Room SHTLM, Level 5
Kitchens, Level 5
Training Restaurant SHTLM, Level 6
Restaurant, Level 6
Pre-Function, Level 12
Pre-Function, Level 12
Meeting Room, Level 12
Board Room, Level 12
Executive Offices, Level 12
Lift Car
Toilet (Male)
Toilet (Female)
Link Bridge 1 – External View
Corridor to Link Bridge 1
Link Bridge 2
Link Bridge 2 – Inner View
FIFA Football Field & Sport Court
Football Field & Sport Court
Football Field, Ground Floor
Sport Court (Inner View)
Jogging Track & Perimeter Fencing
Auditorium 1 (During Construction)
COB constructed,
ready for steel
structure installation
Brickwall ready for
plastering
Auditorium 1 (During Construction)
Sunway Red Fin and
Cladding In Progress
Perforated Panel
Installation in
Progress
Auditorium Façade (Day View)
Auditorium Façade (Night View)
Auditorium Façade (Night View)
Auditorium Façade (Night View)
Auditorium Façade (Night View)
Guard House (Day View)
Guard House (Night View)
Driveway, Ground Floor
Thank
You