Position : Production Engineer ( structural section )
P l D t il D t f Bi th A t 20 1982 A 29 YPersonal Detail : Date of Birth : August 20, 1982 Age: 29 Years. Nationality : Thai Religion : BuddhismMarital Status : Marries S M l
4 Sukhumwit Rd. Huaypong Muang, Rayong 21150
Sex : Male Height : 168 Cm. Weight : 68 Kg. Health : Excellent
Mobile 08-4249-5605 / 08-1723-1115Office 038-692643-5 # 116E-mail ; [email protected]
E il R S t@D liEducation : 2002~2005
Bachelor’s Degree Mechanical EngineeringInstitute : Phatumtani UniversityGPA 2 46
E-mail ; [email protected]
GPA 2.46
: 1998~2001Khumseanwittayasan School. NongbaulumphuSecondar schoolSecondary schoolGPA 2.13
Suparat Ratpech : Production Engineer
Skill : Language : Thai (native)
: English Listening (fair) Speaking (fair) Reading (good) Writing (fair)
Computer : Program Auto CAD 2002,2007,2008
MS. Word, MS. Excel, MS Project , Internet , E-mailj
Practical Training :
* June 2007 : Technical Petroleum Training Institute Helicopter Under water Escape Training
* 2008 : Safety (ระดับหัวหนางาน )
* 2008 : การทํางานในที่อับอากาศ ระดับผควบคมงาน Confine space 2008 : การทางานในทอบอากาศ ระดบผูควบคุมงาน Confine space
* May 2008 : Survey Training (DIGITAL) Leica Bland
* 29-30 January 2009 : Guideline for ISO 9001 : 2008 ( Documentation )
* 02/2011 คณะกรรมการความปลอดภัยระดับหัวหนางาน
* 05/2011 การทํางานในที่อับอากาศ ระดับผูอนุญาติ Confine space
Suparat Ratpech : Production Engineer
Certificate
Suparat Ratpech : Production Engineer
PAST EXPERIENCE
Years Project Name Scope of work PlatformYears Project Name Scope of work Q’ty
2007 Vincent FPSO Project(Si ga o e)
-Steel structure fabricate on shop deeline & separate part for transport to site install at Leamchabang Port Chonburi
Fab icatio la6
PositionProduction Engineer
(Singapore)WOODSIDE
- Fabrication plan- Lifting plan & lifting procedure- Site instruction( SI ) clarify & report ( all member of modify )- Fabrication report- Take of material / material balance / material shortag- Control schedule / manpower control
2007-2008 Aker FPSO Project
-Steel structure fabricate on shop deeline & separate part for transport to site install at Leamchabang Port Chonburi 42007 2008
PositionProduction Engineer
Aker FPSO Project(Singapore)
Chonburi- Fabrication plan & Erection plan- Lifting plan & lifting procedure- Site instruction( SI ) clarify & report ( all member of modify )
Fab icatio e o t
4
- Fabrication report- Take of material / material balance / material shortage- Control schedule / manpower control
Suparat Ratpech : Production Engineer
PAST EXPERIENCE
Years Project Name Scope of work Platformm
Q’ty
2008FPSO Cidade de Sao Meteus ProjectProsaft production services PTE ltd.
-Steel structure fabricate on shop deeline & separate part for transport to site install at Leamchabang Port Chonburi 5
PositionProduction Engineer
pSingapore
PETROBRAS
g- Fabrication plan & Erection plan- Lifting plan & lifting procedure- Site instruction( SI ) clarify & report ( all member of modify )- Fabrication reportFabrication report- Take of material / material balance / material shortage- Control schedule / manpower control- Fabrication & Erection shell Ø9m.& cone i l d li i l & l i ll
2008-2009
PositionProduction
MODIFY WHRU STACK 135M.Project – PTT
(PTT#5 Maptaphut)
include lining plate & nozzle install- Fabrication & Erection duct Ø4m.x40m. include lining plate- Fabrication & Erection pipe rack support of ducting
1
Engineerg
- Lifting plan & lifting procedure- Take of material / material balance / material shortage- Control Schedule / manpower control- Fabrication Header include Hydro test
2008‐2009
PositionP d i
DIGESTER UPPER TUBE NO.1 ( Thailand )
Header Ø1750x L9150
Fabrication Header include Hydro test
1
Production Engineer
Suparat Ratpech : Production Engineer
j S f k l fYears Project Name Scope of work PlatformQ’ty
-Steel structure fabricate on shop deeline & 2009-2010
PositionProduction
Pretrobras FPSO Cidade de Angra dos Reis MV22 Project / Modec
PETROBRAS
pseparate part for transport to site install at Leamchabang Port Chonburi- Fabrication plan & Erection plan- Lifting plan & lifting procedure- Site instruction( SI ) clarify & report ( all
10
Production Engineer
Site instruction( SI ) clarify & report ( all member of modify )- Fabrication report- Take of material / material balance / material shortage
C t l h d l / t l- Control schedule / manpower control
2010 Micro-GTL Demonstration Plant(Toyo Engineering Corporation / Japan)
-Complete fabrication steel structure & Equipment installation on shop deeline rayong- Lifting plan & lifting procedure- Site instruction( SI ) clarify & report ( all
2
PositionProduction Engineer
- Site instruction( SI ) clarify & report ( all member of modify )- Fabrication report-Take of material / material balance / material shortage- Control schedule / manpower control
2010Position
โครงการระบบขนสงมวลชนทางรางในพื้นที่
กรงุเทพมหานครและปริมณฑล โครงการระบบรถไฟ
ชานเมือง (สายสีแดง) ชวงบางซื่อ-ตลิ่งชัน
- Fabrication & Preassembly steel structure (Main truss) on shop deeline rayong- Control schedule / manpower control 26
Suparat Ratpech : Production Engineer
Production Engineer
ชานเมอง (สายสแดง) ชวงบางซอ-ตลงชน
j S f k l fYears Project Name Scope of work PlatformQ’ty
-Steel structure fabricate on shop deeline & 2010-2011
PositionProduction
FPSO Cidade de Sāo Paolo MV23
PETROBRAS
pseparate part for transport to site install at Leamchabang Port Chonburi- Fabrication plan & Erection plan- Lifting plan & lifting procedure- Site instruction( SI ) clarify & report ( all
20
Production Engineer
Site instruction( SI ) clarify & report ( all member of modify )- Fabrication report- Take of material / material balance / material shortage
C t l h d l / t l- Control schedule / manpower control2011-2012
PositionProduction
EPCh GUDRUN Project
( Statoil )
‐Steel structure fabricate on shop deeline & separate part for transport to site install at Laemchabang Port ChonburiTake of material / material balance / material
2
Production Engineer
‐Take of material / material balance / material shortage‐ Fabrication plan & erection plan‐ Fabrication report‐ Lifting plan & lifting procedure
f f‐ Site instruction ( SI ) clarify & report ( all member of modify )‐Control schedule / manpower control‐ Fare boom fabrication & Erection
Suparat Ratpech : Production Engineer
Past Experience at Deeline Construction Co., Ltd , Rayong
Vi biStack PTT Vicbirg
Vincent FPSO
Suparat Ratpech : Production Engineer
Prosafe FPSO Vicbirg plant (chevron )
Process Module at Deeline Construction Co., Ltd , Rayong
F b i ti & E ti f t l t t2007 Fabrication & Erection of steel structure
for VINCENT FPSO Project, Offshore module at Leamchabang port Chonburi. Total 6 module
Scope of work : Production engineer-Steel structure fabricate on shop deeline & separate part for transport to site install at Laemchabang Port p p p p gChonburi- Take of material / material balance / material shortage- Fabrication plan & erection plan- Fabrication report- Lifting plan & lifting procedure- Lifting plan & lifting procedure- Site instruction ( SI ) clarify & report ( all member of modify )- Control schedule / manpower control
Suparat Ratpech : Production Engineer
Process Module at Deeline Construction Co., Ltd , Rayong
2007‐2008 Fabrication & Erection of steel structure & Equipment installation for
AKER FPSO SMART#1 Project, Offshore module at Laemchabang Port Chonburi. Total 4 module.
Scope of work : Production engineerSt l t t f b i t h d li & t t f t t t it i t ll t L h b P t Ch b i-Steel structure fabricate on shop deeline & separate part for transport to site install at Laemchabang Port Chonburi- Take of material / material balance / material shortage- Fabrication plan & erection plan- Fabrication report- Lifting plan & lifting procedure- Site instruction ( SI ) clarify & report ( all member of modify )- Control schedule / manpower control
Suparat Ratpech : Production Engineer
Process Module at Deeline Construction Co., Ltd , Rayong
2008 Fabrication & Erection Steel structure
PROSAFE FPSO Project , Offshore module at Laemchabang Port Chonburi. Total 5 module.
Scope of work : Production engineer-Steel structure fabricate on shop deeline & separate part for transport to site install at Laemchabang Port Chonburi- Take of material / material balance / material shortage- Fabrication plan & erection plan- Fabrication reportFabrication report- Lifting plan & lifting procedure- Site instruction ( SI ) clarify & report ( all member of modify )- Control schedule / manpower control
Suparat Ratpech : Production Engineer
at Deeline Construction Co., Ltd , Rayong
Modify WHRU STACK Project : PTT, GSP#5 Maptaphut Rayong Total 1 set2008‐2009 Fabrication & Erection Stack 135 m.
fy j , p p y gScope of work : Production engineer
- Fabrication & Erection shell Ø9m.& cone include lining plate & nozzle install- Fabrication & Erection duct Ø4m.x40m. include lining plate & pipe rack support-Material take off & Balance - Control Schedule / manpower controlControl Schedule / manpower control
Suparat Ratpech : Production Engineer
Fabrication & Erection Stack 135 m.Modify WHRU STACK Project : PTT, GSP#5 Maptaphut Rayong
Suparat Ratpech : Production Engineer
Process Module at Deeline Construction Co., Ltd , Rayong
2009-2010 Fabrication & Erection Steel structure & Equipment installation for
b id d d d i j ( d j ) Off h d l t L h bPretrobras FPSO Cidade de Angra dos Reis MV22 Project (Modec FPSO Project), Offshore module at Laemchabang
Port Chonburi. Total 10 module
Scope of work : Production engineer-Steel structure fabricate on shop deeline & separate part for transport to site install at Laemchabang Port Chonburi- Take of material / material balance / material shortage- Fabrication plan & erection plan- Fabrication report- Lifting plan & lifting procedureLifting plan & lifting procedure- Site instruction ( SI ) clarify & report ( all member of modify )- Control schedule / manpower control
Suparat Ratpech : Production Engineer
Process Module at Deeline Construction Co., Ltd , Rayong
2010Complete fabrication Steel structure & Equipment installation on shop Deeline rayong.
Micro-GTL Demonstration Plant ProjectMicro-GTL Demonstration Plant Project(Toyo Engineering Corporation / Japan)
Scope of work : Production engineer- Complete fabrication steel structure & Equipment installation on shop deeline rayong- Take of material / material balance / material shortage- Fabrication plan- Fabrication reportp- Site instruction ( SI ) clarify & report ( all member of modify )- Lifting plan & lifting procedure- Control schedule / manpower control
Suparat Ratpech : Production Engineer
Steel structure at Deeline Construction Co., Ltd , Rayong
2010-Present โครงการระบบขนสงมวลชนทางรางในพื้นทีก่รุงเทพมหานครและปรมิณฑล โครงการระบบรถไฟชานเมือง
(สายสแีดง) ชวงบางซื่อ-ตลิ่งชัน(สายสแดง) ชวงบางซอ ตลงชน
Freyssinet (Thailand) Ltd. Bangkok Thailand / UneuqsScope of work : Production engineer- Fabrication & Preassembly steel structure (Main truss) on shop deeline rayong- Control schedule / manpower controlControl schedule / manpower control
Suparat Ratpech : Production Engineer
Steel structure at Deeline Construction Co., Ltd , Rayong
2010-2011 Fabrication & Erection Steel structure
P t b FPSO Cid d d Sā Pā l MV23 P j t (M d FPSO P j t) Off h d l t L h b P t Ch b iPretrobras FPSO Cidade de Sāo Pāolo MV23 Project (Modec FPSO Project), Offshore module at Laemchabang Port Chonburi.
Total 20 module
Scope of work : Production engineer-Steel structure fabricate on shop deeline & separate part for transport to site install at Laemchabang Port Chonburi- Take of material / material balance / material shortage- Fabrication plan & erection plan- Fabrication report- Lifting plan & lifting procedureg p g p- Site instruction ( SI ) clarify & report ( all member of modify )- Control schedule / manpower control
Suparat Ratpech : Production Engineer
2011-2012 Fabrication & Erection Steel structure2011 2012 Fabrication & Erection Steel structure
EPCh GUDRUN Project ( Statoil )
Scope of work : Production engineerSteel structure fabricate on shop deeline & separate part for transport to site install at Laemchabang Port Chonburi-Steel structure fabricate on shop deeline & separate part for transport to site install at Laemchabang Port Chonburi- Take of material / material balance / material shortage- Fabrication plan & erection plan- Fabrication report- Lifting plan & lifting procedure- Site instruction ( SI ) clarify & report ( all member of modify )
DEE LINE CONSTRUCTION LTD.,PART
- Control schedule / manpower control- Fare boom fabrication & Erection
2012 - Present Fabrication & Erection Steel structure2012 Present Fabrication & Erection Steel structure
OSX3 Leasing B.V FPSO Project ( Modec )
Scope of work : Production engineerSteel structure fabricate on shop deeline & separate part for transport to site install at Laemchabang Port Chonburi-Steel structure fabricate on shop deeline & separate part for transport to site install at Laemchabang Port Chonburi- Take of material / material balance / material shortage- Fabrication plan & erection plan- Fabrication report- Lifting plan & lifting procedure- Site instruction ( SI ) clarify & report ( all member of modify )
DEE LINE CONSTRUCTION LTD.,PART
- Control schedule / manpower control- Fare boom fabrication & Erection