SUPPLIER SCORECARD GUIDESpaceX Supply Chain ManagementMay 2016
November 2016 SpaceX Proprietary – Use or disclosure of this information is subject to SpaceX approval
Supplier Guide
• Purpose & Benefits
• Scope of Scorecard
• Functionality & Features
• Scorecard Explanation– Supplier Information
– Supplier GPA
– Supplier Performance
– Statistics
– Appendix Page
• Baseline and Target Scores
• Scorecard Hotline
• Scorecard Dispute Form– Policy Around Data Changes
– Acceptable Reason Codes
November 2016 SpaceX Proprietary – Use or disclosure of this information is subject to SpaceX approval
Purpose & Benefits
• One Stop Shop– Summarizes supplier relationship at the executive level
– Standardizes supplier valuation
• SpaceX and Supplier Relationship Transparency– Ranks supplier score against target requirements
– Monitors supplier trend and progress over time
– Drives data integrity and accountability
• Empowers supplier to create robust improvement plans and development activities
• Satisfies Customer and Industry requirements
Drives SpaceX Business Award Justification
November 2016 SpaceX Proprietary – Use or disclosure of this information is subject to SpaceX approval
Scope of Scorecard
Every supplier location/supplier code will have a single
supplier scorecard which will encompass all activity
with them, regardless of commodity or tier of purchase
November 2016 SpaceX Proprietary – Use or disclosure of this information is subject to SpaceX approval
Functionality & Features
Functionality
• Easy to Read, Printable PDF 8.5 x 11 ratio
• Historical data retrievable up to 2 years
Features
• Supplier and SpaceX Contact Information
• Supplier GPA
• Performance Scoring
• Statistics
• Appendix Page
November 2016 SpaceX Proprietary – Use or disclosure of this information is subject to SpaceX approval
November 2016 SpaceX Proprietary – Use or disclosure of this information is subject to SpaceX approval
Section 1: Supplier Information
Section A
Supplier Contact Information
Main and Quality Contacts
Supplier Since
Date of when supplier profile was created
Last Audited
Date of last audit completed and uploaded
Last Performance Review
Date of last review completed and uploaded
Payment Terms:
Debarred:
Flagged “Yes” Notification, if debarred
D&B Score:
Reflects public D&B score (updated quarterly),
if available
Section BApproval Status
• Approved: Active and passed quality evaluation
• Conditional: Active but has not yet undergone quality evaluation
• Probation: Active but has failed a quality audit or commercial requirement and is being monitored
• Under Consideration: Inactive, but is initially being considered by buyers teams
Supplier Type
• Flight: Provides flight parts to SpaceX
• Non-Flight: Provides non-flight parts to SpaceX, includes R&D, engineering development, machines, tools, etc.
Scope of Approval: General: Commodity
Special Process: Service ID, if applicable
Section C
SpaceX Contact Information
Supplier Quality
Supplier Performance
Primary Buyer
Supplier GPA
Explanation on
next slide
November 2016 SpaceX Proprietary – Use or disclosure of this information is subject to SpaceX approval
Supplier GPA
What makes up a Supplier GPA?
A Supplier GPA is an aggregate and equally weighted
score (25%) of Issue, SRI, HOLD, and OTTP.
Further explanation in subsequent slides. A = 4.00
B = 3.00
C = 2.00
D = 1.00
F = 0.00
Letter Grade
Scale
November 2016 SpaceX Proprietary – Use or disclosure of this information is subject to SpaceX approval
Section 2: Supplier Performance
Score Type Issue Score Hold Score SRI Score OTTP Score
Definition Vendor caused
nonconformance
escapes
Documentation
noncompliance
such receiving
anomalies (certs)
and overshipment
(qty mismatch)
Supplier called in
vendor caused
nonconformance
requests
On Time to Original
Promise Date
Score Percentage % of PO lines
delivered free of
Issues
% of PO Lines
delivered free of
HOLDS
% of PO lines
submitted free of
SRIs
% of PO lines
delivered to
Original PO date
Individual score
thresholds and
corresponding
letter grades
98% - A
90% - B
80% -C
50% - D
<50% - F
95% - A
90% - B
80% - C
50% - D
< 50% - F
90% - A
80% - B
70% - C
50% - D
<50% - F
90% - A
80% - B
70% - C
50% - D
<50% - F
Section A: Individual Performance Score
Section B: Infographics
Months and Corresponding # of lines
Blue Line: 6 Month Rolling
Grey Line: Instantaneous Average (for the month)
Section C: Top Impact Parts
List view of top three parts impacting each corresponding performance score
(Part Number, Part Description, % Part Score, PO Line)
November 2016 SpaceX Proprietary – Use or disclosure of this information is subject to SpaceX approval
Section 3: Supplier Statistics
Section B: Top 3 Spend Parts
List view of top 3 purchased parts within current open orders
(Part Number, Part Description, Part Score, Line)
Section C: Top 10 Open Orders by Spend
List view of top 10 current open orders by spend
(Purchase Order/Line, Part Number, Original and Current Promise Date,
QTY, Amount)
Section A
Spend: Total Open Spend, Total Spend 12 Month and Prior Year
Blue Line: 6 Month view of Spend
Open Orders: Current Open Orders, Total Orders Worked 12 Month
and Prior Year
Blue Line: 6 Month view of Orders in Open Status during that month
Part Count: 6 Month Rolling Distinct Part Numbers, Average for 12
Month and Prior Year
Blue Line: 6 Month view of Average Unique Part Number
November 2016 SpaceX Proprietary – Use or disclosure of this information is subject to SpaceX approval
Appendix Page
• Separate attachment of raw data driving scores
• The Score is reflective of the last 6 months viewable
by PO/Line, Part Number, Part Description, QTY, the
Passing or Failing status of each line, any reference
Issue Tickets and Date of when each Line was
received.
• Every PO/Line is an opportunity for Pass or Fail.
Any Fails are counted against the metric negatively.
Any Passes are not.
November 2016 SpaceX Proprietary – Use or disclosure of this information is subject to SpaceX approval
Appendix Page
PO/Line: Purchase Order and Line
Part Number: Part Number
Part Description: Part Description
Quantity: Quantity
Issue P/F: Status of whether line passed or failed to deliver free of Issue
Issue List: Reference Issue Ticket(s)
Hold P/F: Status of whether line passed or failed to deliver free of Hold
SRI P/F: Status of whether line passed or failed to deliver free of an SRI
SRI List: Reference SRI
OTTP P/F: Status of whether line passed or failed to deliver On Time to Promise
Last Received Date: Last date received captured by SpaceX
Promise Date: Original Promise Date on Purchase Order
November 2016 SpaceX Proprietary – Use or disclosure of this information is subject to SpaceX approval
Supplier Baseline and Target Scores
• Minimum Requirements (Baseline)
– Issue Score: 90% “B”
– Hold Score: 90% “B”
– SRI Score: 80% “B”
– OTTP Score: 80% “B”
November 2016 SpaceX Proprietary – Use or disclosure of this information is subject to SpaceX approval
Supplier Scorecard Point of Contacts
• Concerns regarding Issue, Hold, SRI
– Contact listed Supplier Quality Engineer
• Concerns regarding OTTP
– Contact listed Supplier Performance Coordinator
• Concerns regarding Statistics
– Contact listed Primary Buyer
November 2016 SpaceX Proprietary – Use or disclosure of this information is subject to SpaceX approval
Scorecard Dispute Form
Supplier
inputs PO
line and
scorecard
category
Supplier selects
scorecard
category
Supplier inputs
Issue list and/or
SRI list
Supplier indicates
if information is
requested
Supplier indicates
if they dispute
this item
and selects
reason code from
list
Supplier provides
detailed
justification and
whether delivery
was impacted
(Not shown) SpaceX indicates whether request is approved and provides notes if needed
November 2016 SpaceX Proprietary – Use or disclosure of this information is subject to SpaceX approval
Policy Around Data Changes
• Suppliers have the opportunity to dispute any Failing scores via a Dispute Form which can be downloaded from SpaceX.com/legal
• Note that all disputes must fall under one of the following Acceptable Reason Codes for the Category Score and every dispute must be submitted with Objective Evidence substantiating the dispute
• Suppliers have 30 days from each Scorecard receipt to dispute any new data, after 30 days the Supplier is in agreement that the SpaceX Supplier Scorecard is appropriately and accurately reflecting the Supplier’s Performance
November 2016 SpaceX Proprietary – Use or disclosure of this information is subject to SpaceX approval
Acceptable Reason Codes
Issue Hold SRI OTTP
Config Change -
Revision/Regrade/Deviation
Design - Electrical
Design - Firmware
Design - Mechanical
Design - Test
Limits/Requirements
Documentation - Design,
Drawing, Model
Documentation - Planning
Documentation - Procedure
Improper Handling/Transport
Invalid Issue
Material - Incorrect Material
Process - Process design
Procurement - Lacking
requirements
Tooling - Design
Tooling - Fabrication
Other
Configuration Management
Issue
Instructed by SpaceX to Ship
PO Revision Mismatch
Received Quantity
Discrepancy
Other
Config Change -
Revision/Regrade/Deviation
Design - Electrical
Design - Firmware
Design - Mechanical
Design - Test
Limits/Requirements
Documentation - Design,
Drawing, Model
Documentation - Planning
Documentation - Procedure
Improper Handling/Transport
Invalid Issue
Material - Incorrect Material
Process - Process design
Procurement - Lacking
requirements
Tooling - Design
Tooling - Fabrication
Other
Did not receive material on
time from SpaceX
SRI resulted in delayed
shipment
SpaceX reprioritized order
Drawing / Rev change
delayed shipment
Source inspection delayed
shipment
Our system shows parts
were delivered on time to
Original Promise Date
Unpredicted circumstances