supply,installation,testing&commissioning...

17
1 Supply, Supply, Supply, Supply, Installation, Installation, Installation, Installation, Testing Testing Testing Testing & Commissioning Commissioning Commissioning Commissioning of of of of 11KV 11KV 11KV 11KV Indoor Indoor Indoor Indoor Single Single Single Single Breaker Breaker Breaker Breaker Panel Panel Panel Panel at at at at SAMEER- SAMEER- SAMEER- SAMEER- Centre Centre Centre Centre for for for for Electromagnetics, Electromagnetics, Electromagnetics, Electromagnetics, Chennai-113 Chennai-113 Chennai-113 Chennai-113 Tender Tender Tender Tender Document Document Document Document SAMEER-CENTRE SAMEER-CENTRE SAMEER-CENTRE SAMEER-CENTRE FOR FOR FOR FOR ELECTROMAGNETICS ELECTROMAGNETICS ELECTROMAGNETICS ELECTROMAGNETICS Ministry of Comm. & Information Technology, Government of India 2 nd Cross Road, CIT Campus, Taramani Chennai - 600 113 2013 2013 2013 2013

Upload: others

Post on 27-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Supply,Installation,Testing&Commissioning ...3.imimg.com/data3/OS/MC/HTT-341/341_2013-06-25-16-57-07_1372… · Programme Director, SAMEER - Centre for Electromagnetics, Ministry

1

Supply,Supply,Supply,Supply, Installation,Installation,Installation,Installation, TestingTestingTestingTesting &&&&CommissioningCommissioningCommissioningCommissioningofofofof 11KV11KV11KV11KV IndoorIndoorIndoorIndoor SingleSingleSingleSingle BreakerBreakerBreakerBreaker PanelPanelPanelPanel atatatat SAMEER-SAMEER-SAMEER-SAMEER-

CentreCentreCentreCentre forforforfor Electromagnetics,Electromagnetics,Electromagnetics,Electromagnetics, Chennai-113Chennai-113Chennai-113Chennai-113

TenderTenderTenderTender DocumentDocumentDocumentDocument

SAMEER-CENTRESAMEER-CENTRESAMEER-CENTRESAMEER-CENTRE FORFORFORFOR ELECTROMAGNETICSELECTROMAGNETICSELECTROMAGNETICSELECTROMAGNETICSMinistry of Comm. & Information Technology, Government of India

2nd Cross Road, CIT Campus, TaramaniChennai - 600 113

2013201320132013

Page 2: Supply,Installation,Testing&Commissioning ...3.imimg.com/data3/OS/MC/HTT-341/341_2013-06-25-16-57-07_1372… · Programme Director, SAMEER - Centre for Electromagnetics, Ministry

2

SAMEER-CENTRESAMEER-CENTRESAMEER-CENTRESAMEER-CENTRE FORFORFORFOR ELECTROMAGNETICSELECTROMAGNETICSELECTROMAGNETICSELECTROMAGNETICSC.I.T Campus, Tharamani, Chennai - 600 113

TenderTenderTenderTender for:for:for:for: Supply, Installation, Testing & Commissioning of 11KV IndoorSingle Breaker Panel at SAMEER-Centre for Electromagnetics, 2ndCross Road, CIT Campus Taramani, Chennai-600 113

INDEXINDEXINDEXINDEX

SectionSectionSectionSection DESCRIPTIONDESCRIPTIONDESCRIPTIONDESCRIPTION PagePagePagePageNo.No.No.No.

I Tender Notice 3-4

II Check List 5

III Terms and Conditions 6-7

IV contents 8

V Specifications(Technical) 9-12

VI Specifications(General) 13

VII Technical Bid 14-15

VIIICommercial Bid 16-17

Page 3: Supply,Installation,Testing&Commissioning ...3.imimg.com/data3/OS/MC/HTT-341/341_2013-06-25-16-57-07_1372… · Programme Director, SAMEER - Centre for Electromagnetics, Ministry

3

SAMEER-CENTRESAMEER-CENTRESAMEER-CENTRESAMEER-CENTRE FORFORFORFOR ELECTROMAGNETICSELECTROMAGNETICSELECTROMAGNETICSELECTROMAGNETICSMinistry of Comm. & Information Technology, Government of India

2nd Cross Road, CIT Campus, Taramani, Chennai - 600 113

NOTICENOTICENOTICENOTICE INVITINGINVITINGINVITINGINVITING TENDERSTENDERSTENDERSTENDERS

TenderTenderTenderTender NoticeNoticeNoticeNotice No.:No.:No.:No.: S-CEM/EST(E)/11KV BREAKER/1-613

Sealed Tenders are hereby invited on behalf of the DIRECTOR, SAMEER, by theProgramme Director, SAMEER - Centre for Electromagnetics, Ministry of InformationTechnology, CIT Campus, 2nd Cross Road, Taramani, Chennai-600 113 from the Contractorson the approved list of government, CPWD, Railways, Military Engineering Services etc. forthe following work:-

Name of the work Supply, Installation, Testing & Commissioningof 11KV Indoor single Breaker Panel atSAMEER-Centre for Electromagnetics, 2nd

cross road,C I T campus, Taramani, Chennai-600 113

Approximate estimated value Rs.4,50,000/-(Rupees four lakhs and thirty thousand only)

Time allowed for completion 90 Days

Earnest money deposit Rs.9,000-(Rupees five thousand only)

Security deposit 5%

Cost of tender documents includingSales Tax(Not refundable)

Nil

TENDER DOCUMENTS CAN BE DOWNLOADED FROM OUR WEBSITE (CEM OROBTAINED ON WRITTEN REQUEST ON ANY WORKING DAY FROM 25.06.2013 onpayment of the cost of Tender Document in cash or by demand draft of any nationalized bankfrom the Programme Director, SAMEER-Centre for Electromagnetics, Ministry ofInformation Technology, 2nd Cross Road, CIT Campus, Taramani, Chennai - 600 113.

Tender will be received upto 15-00 Hrs. on 11.07.13 by the Purchase Officer, SAMEER -Centre for Electromagnetics, at his office, CIT Campus, 2nd Cross Road, Taramani, Chennai -600 113, and will be opened on the same day at 15.15 Hrs, before the attending tenders.

Page 4: Supply,Installation,Testing&Commissioning ...3.imimg.com/data3/OS/MC/HTT-341/341_2013-06-25-16-57-07_1372… · Programme Director, SAMEER - Centre for Electromagnetics, Ministry

4

TENDERS NOT ACCOMPANIED BY THE FOLLOWING ARE LIABLETO BESUMMARILY REJECTED....

(a) A deposit call receipt or Demand Draft or Guarantee bond for the specified valuefor a minimum value period of six months of a scheduled bank guaranteed by theReserve Bank of India for the Earnest Money Deposit indicated above in favour of“SAMEER -Centre for Electromagnetics, 2nd cross road, C I T campus, Taramani,Chennai-600 113.”Note:Note:Note:Note: CASH AND CHEQUES FOR E.M.D WILL NOT BE ACCEPTED.

(b) Evidence showing the Eligibility criteria according to the Terms & Conditions ofthe Tender document.

(c) A valid Income Tax Clearance Certificate in the latest approved form.(d) Permanent Account No. in their application for the tender document.(e) Programme director, SAMEER-Centre for Electromagnetics reserves the right to

issue tender document and to reject any or all tenders or to allot part of the work todifferent agents without assigning any reason therefore.

PROGRAMMEPROGRAMMEPROGRAMMEPROGRAMME DIRECTORDIRECTORDIRECTORDIRECTORSAMEER-Centre for Electromagnetics

This tender schedule should be returned with all papers intact without detaching any part ofthe document.

TENDERTENDERTENDERTENDER NOTICENOTICENOTICENOTICE NO.NO.NO.NO. S-CEM/EST(E)/11KV BREAKER/1-120

LastLastLastLast datedatedatedate &&&& TimeTimeTimeTime forforforfor ReceiptReceiptReceiptReceipt ofofofof TenderTenderTenderTender ::::

Date : 11/07/13

Time : 15-00 Hrs.

DateDateDateDate &&&& TimeTimeTimeTime ofofofof OpeningOpeningOpeningOpening thethethethe TechnicalTechnicalTechnicalTechnical BidBidBidBid TenderTenderTenderTender

Date : 11/07/12

Time : 15.15 Hrs.

Issued to:

Date of Issue:

Page 5: Supply,Installation,Testing&Commissioning ...3.imimg.com/data3/OS/MC/HTT-341/341_2013-06-25-16-57-07_1372… · Programme Director, SAMEER - Centre for Electromagnetics, Ministry

5

Signature of the Issuing Officer

CHECKCHECKCHECKCHECK LISTLISTLISTLIST

BeforeBeforeBeforeBefore submittingsubmittingsubmittingsubmitting thethethethe tendertendertendertender ,,,,TheTheTheThe tenderertenderertenderertenderer mustmustmustmust checkcheckcheckcheck thethethethe followingfollowingfollowingfollowing ::::

SaySaySaySay 'Yes''Yes''Yes''Yes' orororor 'No''No''No''No'

1. Have you enclosed the DD for earnestmoney?

::::

2. Have you filled up the specification andcompliance column and the quantitiescolumn of the technical bid?

::::

3. Have filled up the quantities and the unitprice with the break-up for supply andinstallation?

::::

4. Have you submitted the set of detaileddrawings?

::::

5. Do you agree to complete the workwithin the stipulated period?

::::

6. Have you submitted all tender drawingsand tender book along with thequotation?

::::

7. Are you registered with Central orState/PWD/ MES/DOT/ Railways or asspecified in the general terms andconditions of this tender?

::::

8. Have you enclosed list of customers asspecified in the Terms and Conditions ofthe tender document????

::::

Signature of the Tenderer

Address of the Tenderer: ………………………………………….

…………………………………………..

…………………………………………..

Page 6: Supply,Installation,Testing&Commissioning ...3.imimg.com/data3/OS/MC/HTT-341/341_2013-06-25-16-57-07_1372… · Programme Director, SAMEER - Centre for Electromagnetics, Ministry

6

GENERALGENERALGENERALGENERAL TERMSTERMSTERMSTERMS ANDANDANDAND CONDITIONSCONDITIONSCONDITIONSCONDITIONS

1. The tenderers shall place the Earnest Money instrument, Part I of Tender (Technical) andPart II of’ Tender (commercial) in three different sealed envelopes marked ‘EarnestMoney’: `Part I of Tender (Technical)’ and `Part II of Tender (Price schedule)’.Commercial terms and conditions, if any, shall be attached to Part-I. All the Three envelopsshall then be placed in another sealed envelop and submitted to the Purchase Officer,SAMEER-Centre for Electromagnetics, 2nd Cross Road, CIT Campus, Taramani, Chennai-600 113.

2. The officer opening the Tender shall first open the envelope marked ‘Earnest Money’. If theEarnest Money instrument is found to be in order, only then the officer shall proceedfurther with the opening of Part I of Tender (Technical). In case the Earnest Money is notdeposited or is not in order, the tender shall be returned to the tenderer unopened either onthe spot, if the tenderer is present, or later by post. Only a mention to this effect shall bemade in the tender opening register.

3. Part II of Tender (Price Schedule) will be opened only if the Part I of Tender (Technical) isin order. The date and Time of Part II of Tender opening will be intimated to thosetenderers who have been shortlisted by the evaluating committee..

4. Tender document in full should be returned along with the offer. No correction should bemade. No additional writing in Tender documents is permitted and it will lead to rejectionof the under. Only price bid and Format for submission of technical particulars should befilled as per instruction under Note I.

5. Format for submission of technical particulars should be filled in. The offer should besupported by Technical document to their claim. If alternate offer is made, technicalparticular and price for the same should be given separately.

6. PricePricePricePrice quotedquotedquotedquoted shouldshouldshouldshould includeincludeincludeinclude chargeschargeschargescharges forforforfor allallallall componentscomponentscomponentscomponents ofofofof ED,ED,ED,ED, ST,ST,ST,ST, WorksWorksWorksWorks contractcontractcontractcontracttax,tax,tax,tax, transport,transport,transport,transport, Insurance,Insurance,Insurance,Insurance, TestingTestingTestingTesting atatatat works,works,works,works, TestingTestingTestingTesting atatatat Site,Site,Site,Site, handling,handling,handling,handling, CommissioningCommissioningCommissioningCommissioningetc.etc.etc.etc. BreakupBreakupBreakupBreakup forforforfor allallallall thethethethe componentscomponentscomponentscomponents shouldshouldshouldshould accompanyaccompanyaccompanyaccompany thethethethe pricepricepriceprice bid.bid.bid.bid. VagueVagueVagueVaguestatementstatementstatementstatement suchsuchsuchsuch asasasas EDEDEDED &&&& otherotherotherother TaxesTaxesTaxesTaxes extraextraextraextra willwillwillwill leadleadleadlead totototo rejectionrejectionrejectionrejection ofofofof tender.tender.tender.tender.

7. Deviation if any can be brought out in a separate sheet with supporting document.

8. The complete system should be ready for acceptance testing at factory with in 60 days ofthe confirmed order / or better of indent.

9. All the equipments supplied should be under warranty for a minimum period of 12months from the date of final commissioning and all the faults, failures, malfunctioningetc. should be attended within 48 hours, including free replacement of components /devices.

10.The equipment is to be delivered and installed at CHENNAI and the vendor should clearlyindicate the spare and service support available at CHENNAI.

Page 7: Supply,Installation,Testing&Commissioning ...3.imimg.com/data3/OS/MC/HTT-341/341_2013-06-25-16-57-07_1372… · Programme Director, SAMEER - Centre for Electromagnetics, Ministry

7

11. All the tools, special tools, test instruments, labourers etc., for the installation andcommissioning to be arranged by supplier.

12. Acceptance tests at factory for the complete panel will be conducted by DepartmentEngineers for which supplier shall arrange for the same intimating the date for tests 15days in advance.

13. The price quoted should include packing, forwarding, insurance, transportation to site, alltypes of taxes and duties, loading, unloading and other handling charges, hire charges forcrane or any other loading / unloading and shifting machinery, labour charges, installation,testing, commissioning, other incidentals and technical support till acceptance, all suchcharges to be indicated as lump sum only.

14. No ‘C’ or ‘D’ form will be issued by SAMEER

15.Beyond warranty, list of consumables, spares and tools required for day-to-daymaintenance and servicing of BREAKER Panel may be enclosed with the offer.

16. Supplier should strictly follow the safety and security norms and regulations enforced bythe department at site.

17. The quote should be very clear about the specifications, scope of supply and scope ofwork and give a compliance statement serial number wise as given in the tenderdocument and also clearly indicate deviations if any.

18. Specification and performance details of the Single Breaker Panel offered shall beprovided as per the list enclosed, additional information / details also shall beincorporated wherever needed.

19. In respect of all labour directly or indirectly employed in the works for performance ofcontractor’s part, the contractor shall comply with the CPWD Contractor’s Labourregulations made by Government of India from time to time in regard to payment ofwages and implementation of safety norms and settlement of claims.

NOTE: ThisThisThisThis pagepagepagepage alsoalsoalsoalso mustmustmustmust bebebebe signedsignedsignedsigned forforforfor havinghavinghavinghaving acceptedacceptedacceptedaccepted thesethesethesethese termstermstermsterms &&&& conditionsconditionsconditionsconditions andandandandenclosedenclosedenclosedenclosed withwithwithwith thethethethe offer,offer,offer,offer, failingfailingfailingfailing whichwhichwhichwhich thethethethe offerofferofferoffer isisisis liableliableliableliable forforforfor rejection.rejection.rejection.rejection.

Page 8: Supply,Installation,Testing&Commissioning ...3.imimg.com/data3/OS/MC/HTT-341/341_2013-06-25-16-57-07_1372… · Programme Director, SAMEER - Centre for Electromagnetics, Ministry

8

SpecificationSpecificationSpecificationSpecification andandandand generalgeneralgeneralgeneral datadatadatadata forforforfor thethethethe 11KV11KV11KV11KV singlesinglesinglesingle BreakerBreakerBreakerBreaker PanelPanelPanelPanel

CONTENTSCONTENTSCONTENTSCONTENTS

1. Scope2. Project Data3. 11KV 630 Amps VCB4. Relays5. Panel6. Painting7. Preferred make of components8. Document approval, Inspection & Testing

12. Delivery13. Installation14. Final Drawings and documents15. Deviations17. Facilities available at site.18. Warranty19. Format for submission of Technical particulars20. Payment terms

Page 9: Supply,Installation,Testing&Commissioning ...3.imimg.com/data3/OS/MC/HTT-341/341_2013-06-25-16-57-07_1372… · Programme Director, SAMEER - Centre for Electromagnetics, Ministry

9

TECHNICALTECHNICALTECHNICALTECHNICAL DATADATADATADATA FORFORFORFOR 11KV11KV11KV11KV SINGLESINGLESINGLESINGLE BREAKERBREAKERBREAKERBREAKER PANELPANELPANELPANEL

1.1.1.1. Scope:Scope:Scope:Scope:

Assembly, Testing at manufacturer’s works, Transportation and Safe delivery to site,Disconnecting and shifting of existing 11KV breaker panel(with BOCB), Disconnectionand shifting of existing breaker panel, Installation, Testing and Commissioning of I No.11KV,630A 25KA Single Breaker Panel with VCB, Relays etc. as per specifications andsubmission of test and commissioning reports, operating manual, circuit diagrams anddrawings as given in the following paras. .

2.2.2.2. ProjectProjectProjectProject DataDataDataData2.1 Purchaser: : SAMEER-Centre for Electromagnetics2.3 Location : 2nd cross road, CIT campus, Taramani, Chennai-1132.4 Climatic conditions : The climate is tropical with high humidity and heavy

rainfall Conducive to fist and fungus growth.

2.5 Ambient Air Temperature : 17OC.to 45 OC

2.6 Installation : Indoor

2.7. Material Handling facility : The supplier shall make his own arrangements forunloading and handling the equipment at site.

3.03.03.03.0 Specifications:Specifications:Specifications:Specifications:1)1)1)1) TypeTypeTypeType :::: Indoor, metal clad, vertical isolation, horizontal

draw out.2) Rated maximujm voltage : 12KV.

Nominal current : 630Amps.Breaking capacity : 13KA at 12KV.Short time rating : 13KA for 3seconds.

3) ConstructionalConstructionalConstructionalConstructional features:features:features:features:i)i)i)i) The switchgear shall be floor mounting type. The bus bars shall be air

insulated. Bushings and support insulators shall be of cast epoxy resign.ii) Operation: Spring operated motorized as well as manual Closing. And

Tripping with 30V DC and manual.iii) The circuit breaker shall be raised and lowered in the switchgear housing to ‘Service’,

` isolated’ and `withdrawal’ position. The circuit breaker will be drawn outhorizontally at floor level in the withdrawal position.

iv) Inte4rlocks: It shall not be possible to raise the breaker when closed and can be closedonly when it is in the ‘Service ‘ or ‘isolated’ position.

Page 10: Supply,Installation,Testing&Commissioning ...3.imimg.com/data3/OS/MC/HTT-341/341_2013-06-25-16-57-07_1372… · Programme Director, SAMEER - Centre for Electromagnetics, Ministry

10

v) The switchgear/panel shall be complete with internal control wiring for metering,protection and annunciation.

vi) Provision to be made for earthing the switchgear.4) ProtectionProtectionProtectionProtection andandandand MeteringMeteringMeteringMetering.

i) A 11KV/110V 3 phase cast resin voltage transformer, 200VA, class 1 shall be providedalong with HT and LT fuses. It shall be possible to draw out the voltagetransformer from the switchgear cubicle. The voltage transformer shall be connected tothe incoming terminal of the switchgear.

ii) 3 Nos. of epoxy resin cast current transformers (one per phase) 30/5/5A with 2 cores;15VA class 1 and 15 VA class 5P10 shall be mounted in the switchgear.

iii) 1 No. combined over current and earth fault relay-CDAG51 (equivalent to Englishelectric Co.) with the following setting ranges shall be provided and shall have handresent indications.a) over current element 50-200%, in 7 equal steps.b) High set Over current element 200-800%, continuously variable.c) instantaneous earth fault element 10-400% in 7 steps. Shall have stabilizing resistor.

iv) 1 No 96 sq.mm voltmeter, 0-12KV, class 1 with selector switch shall be provided.v)) 1 No 96 sq.mm ammeter, 0-30 A, with Ammeter selector switch shall be providedvi) 1No. 8way or 6way facia annunciator with flashing /steady lamps, accept and reset

buttons and alarm hooter shall be provided for Transformer fault annunciation.vii) 1 set of ON/OFF indication lamps (30V DC) with dropper resistance shall be provided.viii) 1 No Aux. Relay type VAA with 6 nos. VAA 13 relay for tripping and annunciation of

transformer faults.ix) 1 No VAJH 13- High speed tripping relay.x) Multi function digital meter without MD recording

5) CableCableCableCable termination:termination:termination:termination:Cable termination facilities including cable box with suitable holes in the bottom platefor the following existing cables:i) Incoming and outgoing power Cable : Existing 11KV 3 Core 120 sq.mm Aluminium

conductor XLPE cable.ii) Controls: 2 Nos. 7 core 2.5 sq.mm. copper conductor PVCA/XLPE cableiii) Auxiliary supply: 2 Nos. 3core 2.5 sq.mm. copper conductor PVCA cable.

6) Standard Tests: The switchgear shall fully comply with the latest editions of IS: 2516 andIEC 56 and certificates to this effect from CPRI or equivalent body, shallbe furnished along with the offer. Routine tests shall be conducted in thepresence of the purchaser’s representative at works, before dispatch.

Page 11: Supply,Installation,Testing&Commissioning ...3.imimg.com/data3/OS/MC/HTT-341/341_2013-06-25-16-57-07_1372… · Programme Director, SAMEER - Centre for Electromagnetics, Ministry

11

7.07.07.07.0 DocumentDocumentDocumentDocument Approval,Approval,Approval,Approval, InspectionInspectionInspectionInspection &&&& TestingTestingTestingTesting

7.1 Test reports & Drawing Approval: The following Test reports / drawings shall besubmitted for our approval.

7.2 Factory test reports for the Circuit breaker, Potential Transformer , the panel and otherbought out items. (the VCB shall be from the latest batch of manufacturing)

7.3 Foundation plan details drawing

7.4 Operation, Maintenance and troubleshooting manual

8.08.08.08.0 InspectionInspectionInspectionInspection &&&& TestingTestingTestingTesting atatatat Works:Works:Works:Works:

The Panel shall be assembled and offered for inspection at factory before dispatch.The following tests shall be conducted at factory in the presence of the DepartmentEngineers or their authorized representative.

8.1.1. Physical verification of components

8.1.2 Insulation Resistance measurement for Power and Control circuits.

8.1.4 High voltage test for Power circuit (2.5 KV for one minute) and control circuits (250V)for 1 minute

8.1.5 Electrical parameters like frequency, voltage and current.

8.2.8.2.8.2.8.2. InspectionInspectionInspectionInspection andandandand TestingTestingTestingTesting atatatat site:site:site:site:

The following checks and tests shall be carried out at site after installation,

8.2.1 Physical verification of components

8.2.2 Visual examination for defects, transit damages, etc.

8.2.3 Checks for cabling, control wiring and earth connections including terminations

8.2.4 Insulation resistance measurement for breaker and PT

8.2.5 Insulation resistance measurement for Power and Control circuits.

8.2.6 High voltage test for Power circuit (2.5 KV for one minute)

9.0.9.0.9.0.9.0. PaintingPaintingPaintingPainting

9. Painting:Painting:Painting:Painting: The fabricated panel shall, be degreased and painted with one coat of redoxide primer before final painting with two coats of approved colour. The panel innersurface shall be given two coats of glossy White paint and the outer surface with lightgray shade 631 of IS 5.

10.0.10.0.10.0.10.0. DeliveryDeliveryDeliveryDelivery

10.1 The panel shall be delivered to site within 3 Months from the date of placement ofPurchase/work order, by road transport without transshipment enroute.

Page 12: Supply,Installation,Testing&Commissioning ...3.imimg.com/data3/OS/MC/HTT-341/341_2013-06-25-16-57-07_1372… · Programme Director, SAMEER - Centre for Electromagnetics, Ministry

12

10.2 Installation, testing and commissioning of the panel shall be completed in two

consecutive non working days preferably within 10 days from the date of delivery of

panel to the site.

11.011.011.011.0 InstallationInstallationInstallationInstallation

11.1. Initial charging of batteries

11.2 Inspection, testing and commissioning of the breaker panel

11.3 At site all civil works, necessary power and control cabling and earthing will beexecuted by the Supplier. Free Power and water will be provided by Departmant.

12.12.12.12. PreferredPreferredPreferredPreferred makemakemakemake ofofofof componentscomponentscomponentscomponents

12.1 Vacuum Circuit Breaker - Megavin / ABB or equivalent12.2. Potential transformer - --- “ -----

12.3 Current Transformers - AE / Jyoti / Kappa

12.4 Fuse switches - L&T/GE/BCH

12.5 Selector switches - L&T / Kaycee / Siemens

12.6 Contractors - L&T / BCH / Siemens

12.7 Timers - L&T / BCII / Siemens

12.8 Control fuse units - ALSTOM or equivalent

12.9 earth fault relay - ALSTOM or approved brand

12.12 Meters - AE / Rishab

12.13 Batteries - Exide

12. 15.Copper cables - Finolex

12.16. Push Buttons - L&T / Siemens

12.17. Indication lamps - BENOY - 22.5 Dia 0.500W, LED – or

equivalent

15.15.15.15. FinalFinalFinalFinal drawingsdrawingsdrawingsdrawings andandandand documentsdocumentsdocumentsdocuments

FOUR Sets of Operation, Maintenance and trouble shooting manual complete withdrawings and test reports shall be sent with the 11KV Breaker Panel. One set oftracing and a copy of drawing in CD form shall also be sent.

Page 13: Supply,Installation,Testing&Commissioning ...3.imimg.com/data3/OS/MC/HTT-341/341_2013-06-25-16-57-07_1372… · Programme Director, SAMEER - Centre for Electromagnetics, Ministry

13

GENERALGENERALGENERALGENERAL DATADATADATADATA ANDANDANDAND CONDITIONSCONDITIONSCONDITIONSCONDITIONS

16.016.016.016.0 DeviationsDeviationsDeviationsDeviations

Deviations contemplated by the tenderer, if any, from the specifications shall beclearly brought out clause wise in the offer.

17.017.017.017.0 FacilitiesFacilitiesFacilitiesFacilities availableavailableavailableavailable atatatat SiteSiteSiteSite

17.1 3 Phase, Electric Power Supply at 4 15 Volts, 50 Hz. required for the installation ofthe H T Panel will be provided by the Department free of cost.

17.2 Accommodation for the Technicians /Supervisors / Engineers of the Contractor willbe provided by the Department (subject to availability) in the Guest House onchargeable basis.

18.018.018.018.0 WarrantyWarrantyWarrantyWarranty

The complete Panel and accessories shall be guaranteed for satisfactory performanceagainst defective materials and workmanship for 12 months from the date ofcommissioning.

19. Format for submission of technical particulars is enclosed. Duly filled in format shallbe submitted for technical evaluation. Supporting documents containing technicalparticulars should accompany the offer.

20.20.20.20. PaymentPaymentPaymentPayment termstermstermsterms

50 % of the supply price on delivery and acceptance.95 % of overall price after completion of installation and successful testing &commissioning.

Page 14: Supply,Installation,Testing&Commissioning ...3.imimg.com/data3/OS/MC/HTT-341/341_2013-06-25-16-57-07_1372… · Programme Director, SAMEER - Centre for Electromagnetics, Ministry

14

TechnicalTechnicalTechnicalTechnical BidBidBidBid

NameNameNameName ofofofof thethethethe workworkworkwork: Supply, Installation, Testing & Commissioning of 11KV 25KA630Amps HT Single Breaker Panel comprising at SAMEER-SAMEER-SAMEER-SAMEER-

Centre for Electromagnetics, 2nd Cross Road, CIT CampusTaramani, Chennai-600 113

TenderTenderTenderTender NoticeNoticeNoticeNotice No.:No.:No.:No.: S-CEM/EST(E)/11KV BREAKER/1-120

Sl.Sl.Sl.Sl.NoNoNoNo NameNameNameName ofofofof thethethethe itemitemitemitem andandandand SAMEER'sSAMEER'sSAMEER'sSAMEER's

specificationsspecificationsspecificationsspecifications andandandand optionsoptionsoptionsoptions

Supplier/Supplier/Supplier/Supplier/ Manufacturer'sManufacturer'sManufacturer'sManufacturer'sspecificationsspecificationsspecificationsspecifications &&&&

compliancecompliancecompliancecomplianceQty.Qty.Qty.Qty. UnitUnitUnitUnit

I.

1.

ReplacementReplacementReplacementReplacement ofofofof existingexistingexistingexisting 11KV,11KV,11KV,11KV,630A630A630A630A BOCBBOCBBOCBBOCB HTHTHTHT IndoorIndoorIndoorIndoor SingleSingleSingleSingleBreakerBreakerBreakerBreaker PanelPanelPanelPanel withwithwithwith aaaa newnewnewnew 11KV11KV11KV11KV25KA25KA25KA25KA 630Amps630Amps630Amps630Amps VCBVCBVCBVCB HTHTHTHT IndoorIndoorIndoorIndoorSingleSingleSingleSingle BreakerBreakerBreakerBreaker PanelPanelPanelPanel ofofofof includingincludingincludingincludingSupply,Supply,Supply,Supply, installation,installation,installation,installation, testingtestingtestingtesting andandandandcommissioningcommissioningcommissioningcommissioning ofofofof aboveaboveaboveabove PanelPanelPanelPanelcomprisingcomprisingcomprisingcomprising

11KV 25KA 630Amps Draw out typeVacuum Circuit Breaker with bothmotorized and manual operated springcharge mechanism 30VDC shunt trip andclosing with-Rated short-time withstand current (SinglePhase to Earth) of 25KA

-Rated lightning impulse withstand voltageOf 75KVRated 1 min power frequency withstand

voltage r.m.s. value of 28KV

1 set

2. 3 phase, 3 limb 11KV/ 110V, 100VAClass 1 Resin Cast draw out type PotentialTransformer complete with HT/LT fuses.

1 each

3. Suitable Dual Core Current Transformersof 30/5 ratio, one core for protection 15VAand other core for metering 15VA classone

3 each

4. Protective relays:i. IDMT Over current relays(50-200%)ii. Earth fault relay(20-80%)iii. High speed Master trip relayiv. Aux. relays for transformer protection

2112

eacheacheacheach

Page 15: Supply,Installation,Testing&Commissioning ...3.imimg.com/data3/OS/MC/HTT-341/341_2013-06-25-16-57-07_1372… · Programme Director, SAMEER - Centre for Electromagnetics, Ministry

15

5 Meters:i. Ammeter with selector switchii. Voltmeter with selector switchiii. Multifunctional Digital Meter (Load

Manager ) with MD

111

Each

6 LED type indicators forRYB Phases/ON//OFF/Auto Trip/ Healthytrip/Spring Charged condition

7 6way or 8way facia annunciator 1 each

OPTIONAL

II Buy back offer for the existing old 11KV630A ‘Sothern switchgear Ltd.’s manualoperated single breaker panel with bulkbulkbulkbulk oiloiloiloilcircuitcircuitcircuitcircuit breakerbreakerbreakerbreaker and with all the abovefeatures except motorized closing.

1 set

Suppliers/ Contractors are requested to submit the enclosed document in the same format after filingthe right side column of the asked features and specifications for compliance with authorizedsignature and office seal on all the pages.

Note:Note:Note:Note:

1. The vacuum Circuit breaker shall be of ABB/MEGAWIN or equivalent make

2. All control / power cables shall be of UNIVERSAL/ICC/Finolex make

Your quotation may be sent to the undersigned at the earliest.

3. Dismantling/disconnecting of existing panel and shifting the same to suggestedlocation within the campus is in the scope contractor’s job with no extra charges.

4. Cable Terminations including all material like kits etc. is also in the scope of thecontractor’s job with no extra charges.

5. General Terms and conditions, Specifications, General Data and other conditions ofthe tender shall strictly be adhered to.

Yours faithfully,

Purchase Officer

Page 16: Supply,Installation,Testing&Commissioning ...3.imimg.com/data3/OS/MC/HTT-341/341_2013-06-25-16-57-07_1372… · Programme Director, SAMEER - Centre for Electromagnetics, Ministry

16

CommercialCommercialCommercialCommercial Bid:Bid:Bid:Bid:

NameNameNameName ofofofof thethethethe workworkworkwork: Supply, Installation, Testing & Commissioning of 11KV 25KA630Amps HT Single Breaker Panel comprising at SAMEER-SAMEER-SAMEER-SAMEER-

Centre for Electromagnetics, 2nd Cross Road, CIT CampusTaramani, Chennai-600 113

TenderTenderTenderTender NoticeNoticeNoticeNotice No.:No.:No.:No.: S-CEM/EST(E)/11KV BREAKER/1-120

Sl.Sl.Sl.Sl.NoNoNoNo NameNameNameName ofofofof thethethethe itemitemitemitem andandandand SAMEER'sSAMEER'sSAMEER'sSAMEER's

specificationsspecificationsspecificationsspecifications andandandand optionsoptionsoptionsoptions Qty.Qty.Qty.Qty. UnitUnitUnitUnitRateRateRateRate inininin Rs.Rs.Rs.Rs. TotalTotalTotalTotal

Supply Installa-tion

Amount inRs.

I

1.

ReplacementReplacementReplacementReplacement ofofofof existingexistingexistingexisting 11KV,11KV,11KV,11KV,630A630A630A630A BOCBBOCBBOCBBOCB HTHTHTHT IndoorIndoorIndoorIndoor SingleSingleSingleSingleBreakerBreakerBreakerBreaker PanelPanelPanelPanel withwithwithwith aaaa newnewnewnew 11KV11KV11KV11KV25KA25KA25KA25KA 630Amps630Amps630Amps630Amps VCBVCBVCBVCB HTHTHTHT IndoorIndoorIndoorIndoorSingleSingleSingleSingle BreakerBreakerBreakerBreaker PanelPanelPanelPanel ofofofof includingincludingincludingincludingSupply,Supply,Supply,Supply, installation,installation,installation,installation, testingtestingtestingtesting andandandandcommissioningcommissioningcommissioningcommissioning ofofofof aboveaboveaboveabove PanelPanelPanelPanelcomprisingcomprisingcomprisingcomprising

11KV 25KA 630Amps Draw out typeVacuum Circuit Breaker with bothmotorized and manual operated springcharge mechanism 110V DC shunt trip andclosing with-Rated short-time withstand current (SinglePhase to Earth) of 25KA-Rated lightning impulse withstand voltageOf 75KVRated 1 min power frequency withstandvoltage r.m.s. value of 28KV

1

2. 3 phase, 3 limb 11KV/ 110V, 100VAClass 1 Resin Cast draw out type PotentialTransformer complete with HT/LT fuses.

1

3. Suitable Dual Core Current Transformersof 30/5 ratio, one core for protection 15VAand other core for metering 15VA classone

3

4. Protective relays:i. IDMT Over current relays(50-200%)ii. Earth fault relay(20-80%)iii. High speed Master trip relayiv. Aux. Relays for transformer protection

2112

Page 17: Supply,Installation,Testing&Commissioning ...3.imimg.com/data3/OS/MC/HTT-341/341_2013-06-25-16-57-07_1372… · Programme Director, SAMEER - Centre for Electromagnetics, Ministry

17

5 Meters:i. Ammeter with selector switchii. Voltmeter with selector switch

Ammeterii. Voltmeteriii. Load Manager

6 LED type indicators forRYB Phases/ON//OFF/Auto Trip/ Healthytrip/Spring Charged condition

7 6way or 8way facia annunciatorOPTIONAL

II Buy back offer for the existing old 11KV630A ‘Sothern switchgear Ltd.’s manualoperated single breaker panel with bulkbulkbulkbulk oiloiloiloilcircuitcircuitcircuitcircuit breakerbreakerbreakerbreaker and with all the abovefeatures except motorized closing.