supporting materials for rms provided by retail customer choice (rcc) team
DESCRIPTION
Supporting materials for RMS Provided by Retail Customer Choice (RCC) team. Pro-Active Transaction Resolution Measures. 867s Received on Cancelled Service Orders. 867s received on Cancelled Service Orders. Situation - PowerPoint PPT PresentationTRANSCRIPT
3
SituationERCOT periodically receives 867_03 Finals and 867_04s for service orders that are Cancelled in ERCOT systems. The Service Order Sub-Statuses that are considered Cancelled are: CR Requested, Customer Objection, ERCOT Operating Rule, Manual, Permit Not Received, with Exception, Unexecutable and Rejected by TDSP. This can indicate an out-of-sync condition between the TDSP and ERCOT.
Mechanism for Handling 867 RCSO:Step 1: ERCOT produces 867RCSO data each Friday and submits a report file to each TDSP
and CR via the ERCOT PortalStep 2: The TDSPs review the report line items and take one of the following actions:
a) If the TDSP has cancelled the service order, no further action is requiredb) If the TDSP has completed the service order, they will initiate a day-to-day FasTrak issue and work with ERCOT to get ERCOT systems changed to complete. Completion of cancelled service orders will require the approval of the CR initiating the transaction.
(Note: For Cancel by Customer Objection, the TDSP will honor the cancel in their systems)
867s received on Cancelled Service Orders
4
867s received on Cancelled Service Orders
Cancel Type Total Dec. '06 Nov. '06 Oct.' 06 Sept. '06 Aug '06 Jul '06 June '06 May '06 Apr '06 Mar '06 Feb '06 Jan '06CR Requested 61 17 5 4 13 5 3 3 3 2 1 1 4Customer Objection 70 2 0 0 0 0 0 67 0 0 0 0 1ERCOT Operation Rule 7,263 497 529 1,082 727 558 532 433 346 580 640 702 637Manual 87 17 15 11 10 4 10 3 2 2 2 1 10Permit not received 14 0 1 0 0 0 0 5 1 2 2 2 1Rejected by TDSP 248 30 12 23 4 12 23 20 22 17 21 34 30Unexecutable 116 28 8 3 7 4 6 11 10 8 4 9 18W/Exception 33 4 2 0 0 1 0 0 0 0 1 24 1
Grand Total 7,892 595 1,167 2,290 3,051 3,635 4,209 542 384 611 671 773 702
TDSP Total Dec. '06 Nov. '06 Oct. '06 Sept. '06 Aug '06 Jul '06 June '06 May '06 Apr '06 Mar '06 Feb '06 Jan '06AEP 1,565 23 14 197 195 115 149 148 120 186 78 177 163CenterPoint 21 1 1 4 1 2 0 5 1 0 1 5TXU ED 6,271 567 553 918 560 467 420 392 259 417 591 594 533Sharyland 7 1 3 1 0 1 0 0 0 0 1 0 0TNMP 21 2 0 1 4 1 3 0 0 7 1 1 1Nueces 7 1 1 2 1 0 0 2 0 0 0 0 0WTU-TDSP 0 0 0 0 0 0 0 0 0 0 0 0 0Grand Total 7,892 595 1,167 2,290 3,051 3,635 4,209 542 384 611 671 773 702
6
Missing 867 Report • The Missing 867 Report will provide TDSPs information about Service
Orders in a scheduled state for which ERCOT has not received an 867 completing transaction at least seven days after the scheduled meter read
• Weekly report provided to the TDSP via the ERCOT Portal Stats Summary:
Missing 867 Report
09/27/06Total
10/25/06Total
11/29/06Total
12/2706Total
Dec '06
Nov '06
Oct '06
Sep '06
Aug '06
July '06
> 6 Months
AEP-C 231 164 207 198 145 28 13 9 1 1 1AEP-N 29 21 34 31 22 7 1 0 1 0 0AEP-N SPP 0 0 0 0 0 0 0 0 0 0 0Centerpoint 274 531 1,028 1,164 1,052 84 14 3 2 0 9Nueces Pilot TDSP 96 137 80 187 133 39 5 5 0 3 2Sharyland 22 68 73 409 381 6 3 2 1 1 15TNMP 17 19 31 10 8 2 0 0 0 0 0TXU-Elec Del 1,664 1,872 2,148 2,066 1,065 437 201 83 53 20 207WTU - SPP 0 0 0 0 0 0 0 0 0 0 0Total 2,333 2,812 3,601 4,065 2,806 603 237 102 58 25 234
Breakout of 12/27/06 Data
7
Missing 867 Report
0500
1000
15002000250030003500
400045005000
1 2 3 4 5 6
Months in the past
Co
un
t o
f M
iss
ing
86
7s
26-Jul
30-Aug
27-Sep
25-Oct
29-Nov
27-Dec
9
MarkeTrak production metrics / sample reports
Total D2D Issues Submitted – 12/01/06 – 12/31/06
Total D2D Issues Submitted 12/1/2006 - 12/31/2006
Sub-Type Issue Count997 Issues 6
Cancel with Approval - CR 3141Cancel with Approval - TDSP 16
Cancel without Approval 30Inadvertent Switch 1503
Missing TXNS 743Other 83
Reject TXNS 14Rep of Record 18
Siebel CHG/Info 110Usage/Billing Issues 1026
Grand Total 6690
10
MarkeTrak production metrics / sample reports
Total DEV Issues Submitted – 12/01/06 – 12/31/06
Total DEV Issues Submitted 12/1/2006 - 12/31/2006
Sub-Type Total(s)DEV-LSE DEV-Char DEV-IDR Usage DEV-Non-IDR Usage
IDR Usage present in both systems but has kWh issues 0 0 29 0 29IDR Usage present in ERCOT system but not in MP system 0 0 1 0 1IDR Usage present in MP system but not in ERCOT system 0 0 9 0 9
Loss Code Assignment 0 5 0 0 5LSE date change: Start and Stop - CR 101 0 0 0 101
LSE date change: StartTime - CR 32 0 0 0 32LSE date change: StartTime - TDSP 3 0 0 0 3LSE date change: StopTime - CR 18 0 0 0 18
LSE date change: StopTime - TDSP 9 0 0 0 9LSE in ERCOT system not MP - CR 6 0 0 0 6
LSE in ERCOT system not MP - TDSP 7 0 0 0 7LSE in MP sys not ERCOT: active - CR 1 0 0 0 1
LSE in MP sys not ERCOT: active - TDSP 2 0 0 0 2LSE in MP sys not ERCOT: inactiv - CR 22 0 0 0 22
Non-IDR Usage present in both systems has kWh/kW total issues 0 0 0 30 30Non-IDR Usage present in ERCOT system but not in MP system 0 0 0 100 100Non-IDR Usage present in MP system but not in ERCOT system 0 0 0 202 202
Profile Code Assignment 0 2 0 0 2Station Code Assignment 0 5 0 0 5
ZIP Assignment 0 6 0 0 6Totals by Issue Type 201 18 39 332 590
Issue Type
11
MarkeTrak production metrics / sample reports
Total D2D Issues ERCOT Actioned– 12/01/06 – 12/31/06
D2D - ERCOT Actioned12/1/2006 - 12/31/2006
Issue Type Sub-Type Number of ItemsD2D Cancel with Approval - CR 468D2D Cancel with Approval - TDSP 11D2D Cancel without Approval 0D2D Inadvertent Switch 0D2D Missing TXNS 266D2D Other 45D2D Reject TXNS 9D2D Rep of Record 10D2D Siebel CHG/Info 66D2D Usage/Billing Issues 798
Active
12
MarkeTrak production metrics / sample reports
Total DEV Issues ERCOT Actioned– 12/01/06 – 12/31/06
DEV - ERCOT Actioned12/1/2006 - 12/31/2006
Issue Type Sub-Type Number of ItemsDEV-LSE LSE date change: Start and Stop - CR 9DEV-LSE LSE date change: StartTime - CR 6DEV-LSE LSE date change: StartTime - TDSP 2DEV-LSE LSE date change: StopTime - CR 12DEV-LSE LSE date change: StopTime - TDSP 3DEV-LSE LSE in ERCOT system not MP - CR 5DEV-LSE LSE in ERCOT system not MP - TDSP 6DEV-LSE LSE in MP sys not ERCOT: active - CR 1DEV-LSE LSE in MP sys not ERCOT: active - TDSP 2DEV-LSE LSE in MP sys not ERCOT: inactiv - CR 20
Active
13
MarkeTrak production metrics / sample reports
Total D2D Issues No ERCOT Action – 12/01/06 – 12/31/06
D2D - No ERCOT Action - in the MP queue 12/1/2006 - 12/31/2006
Issue Type Sub-Type Number of Items Gaining/LosingD2D Cancel with Approval - CR 463D2D Cancel with Approval - TDSP 10D2D Cancel without Approval 0D2D Inadvertent Switch 0D2D Missing TXNS 228D2D Other 45D2D Reject TXNS 9D2D Rep of Record 10D2D Siebel CHG/Info 65D2D Usage/Billing Issues 794
Issue Type Sub-Type Number of Items Gaining/LosingD2D 997 Issues 1D2D Cancel with Approval - CR 320D2D Cancel with Approval - TDSP 2D2D Cancel without Approval 2D2D Inadvertent Switch 4 GainingD2D Inadvertent Switch 3 LosingD2D Missing TXNS 382D2D Other 25D2D Rep of Record 5D2D Siebel CHG/Info 4D2D Usage/Billing Issues 231
Active
Closed
14
MarkeTrak production metrics / sample reports
Total DEV Issues No ERCOT Action – 12/01/06 – 12/31/06
DEV - No ERCOT Action - in the MP queue 12/1/2006 - 12/31/2006
Issue Type Sub-Type Number of ItemsDEV-LSE LSE date change: StopTime - TDSP 0DEV-LSE LSE in ERCOT system not MP - TDSP 0DEV-Char Loss Code Assignment 5DEV-Char Profile Code Assignment 1DEV-Char ZIP Assignment 6
DEV-IDR Usage IDR Usage present in both systems but has kWh issues 29DEV-IDR Usage IDR Usage present in ERCOT system but not in MP system 1DEV-IDR Usage IDR Usage present in MP system but not in ERCOT system 8
DEV-Non-IDR Usage Non-IDR Usage present in both systems but has date issues 0DEV-Non-IDR Usage Non-IDR Usage present in both systems has kWh/kW total issues 30DEV-Non-IDR Usage Non-IDR Usage present in ERCOT system but not in MP system 100DEV-Non-IDR Usage Non-IDR Usage present in MP system but not in ERCOT system 198
LPA LPA 0
Issue Type Sub-Type Number of ItemsDEV-LSE LSE date change: StopTime - CR 0DEV-LSE LSE in ERCOT system not MP - TDSP 0
ERCOT Initiated ERCOT Initiated 0
LPA LPA 0
Closed
Active
15
Reminder – escalation emails are setup for calendar days
MarkeTrak production metrics / sample reports
Total D2D Unacknowledged– 12/01/06 – 12/31/06
Unacknowledged D2D Issues 12/1/2006 - 12/31/2006
Issue Type Sub-Type Number of Items Gaining/LosingD2D Cancel with Approval - CR 21D2D Cancel with Approval - TDSP 9D2D Cancel without Approval 0D2D Missing TXNS 56D2D Inadvertent Switch 0D2D Other 18D2D Reject TXNS 1D2D Siebel CHG/Info 41D2D Usage/Billing Issues 155
Active
16
Reminder – escalation emails are setup for calendar days
MarkeTrak production metrics / sample reports
Total DEV Unacknowledged– 12/01/06 – 12/31/06
Unacknowledged DEV Issues 12/1/2006 - 12/31/2006
Issue Type Sub-Type Number of ItemsDEV-LSE LSE date change: Start and Stop - CR 10DEV-LSE LSE date change: StartTime - CR 6DEV-LSE LSE date change: StartTime - TDSP 2DEV-LSE LSE date change: StopTime - CR 12DEV-LSE LSE date change: StopTime - TDSP 3DEV-LSE LSE in ERCOT system not MP - CR 6DEV-LSE LSE in ERCOT system not MP - TDSP 6DEV-LSE LSE in MP sys not ERCOT: active - CR 1DEV-LSE LSE in MP sys not ERCOT: active - TDSP 2DEV-LSE LSE in MP sys not ERCOT: inactiv - CR 20DEV-Char Profile Code Assignment 0DEV-Char ZIP Assignment 0
DEV-IDR Usage IDR Usage present in both systems but has kWh issues 2DEV-IDR Usage IDR Usage present in ERCOT system but not in MP system 0DEV-IDR Usage IDR Usage present in MP system but not in ERCOT system 0
DEV-Non-IDR Usage Non-IDR Usage present in MP system but not in ERCOT system 0
Active
18
‘Day to Day’ FasTrak Issue Stats by Category (thru 12/31/2006)
Legend:
Counts are of issues submitted during each month.
EI = ERCOT Initiated Issue
Non-ERCOT issue = Issues logged directly between the CR and TDSP with no ERCOT involvement to resolve.
Category of “All Other” does not have subtype. Issues logged as “All Other” can include Transaction Issues, Rep of Record Issues, Service Order Changes, etc.
Issue Type Issue Category Issue Sub Category Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Grand TotalDay to day Issue Cancellations - Other 1 1 2 0 4
- Requested by CR 1078 1030 1404 1294 1438 1361 1298 1453 1271 1309 602 0 13538- Requested by TDSP 46 26 34 39 17 39 54 62 21 42 24 0 404
Inadvertent switches - Drop to Arep 2 0 2- Submitted by Inadvertent REP 49 73 66 82 76 118 94 132 135 98 54 0 977- Submitted by Losing REP 55 45 48 69 30 53 84 81 66 58 19 0 608
All Other NULL 250 204 260 175 179 204 203 227 222 222 96 0 2242Day to day Issue Total 1479 1379 1814 1661 1740 1775 1733 1955 1715 1729 795 0 17775
EI Issue All Other NULL 49 7 6 9 14 26 60 8 57 18 198 0 452EI Issue Total 49 7 6 9 14 26 60 8 57 18 198 0 452
Non ERCOT Issue Cancellations - Requested by CR 5 3 5 7 15 4 10 6 4 6 3 0 68- Requested by TDSP 1 0 1
Inadvertent switches - Drop to Arep 3 7 4 7 3 1 1 1 6 0 33- Submitted by Inadvertent REP 789 921 828 749 882 981 911 1341 1145 973 422 0 9942- Submitted by Losing REP 648 447 566 465 493 552 883 868 630 696 319 0 6567
All Other NULL 824 636 670 555 615 594 570 637 690 606 236 0 6633Non ERCOT Issue Total 2269 2014 2073 1783 2008 2132 2375 2854 2475 2281 980 0 23244Grand Total 3797 3400 3893 3453 3762 3933 4168 4817 4247 4028 1973 0 41471
19
‘Day to Day’ FasTrak Issue Stats by Category (thru 12/31/2006)
• Of the 68 In Progress D2D Issues, 40 are resolved and awaiting other party resolution check off
• Total D2D Issue ESI IDs worked to date since January 1, 2006 = 49,016
Issue Type Issue Category Issue Sub Category In Progress New Grand TotalDay to day Issue All Other NULL 1 1
Day to day Issue Total 1 1EI Issue All Other NULL 60 26 86
EI Issue Total 60 26 86Non ERCOT Issue Cancellations - Requested by CR 6 6
- Requested by TDSP 1 1Inadvertent switches - Drop to Arep 14 14
- Submitted by Inadvertent REP 1373 1373- Submitted by Losing REP 1389 1389
All Other NULL 53 102 155Non ERCOT Issue Total 2836 102 2938Grand Total 2897 128 3025
20
‘Day to Day’ FasTrak Issue Stats by Category (thru 12/31/2006)
Issue Type Issue Category Issue Sub Category Rejected Resolved Grand TotalDay to day Issue Cancellations - Other 2 2 4
- Requested by CR 608 12930 13538- Requested by TDSP 15 389 404
Inadvertent switches - Drop to Arep 2 2- Submitted by Inadvertent REP 508 469 977- Submitted by Losing REP 461 147 608
All Other NULL 236 2005 2241Day to day Issue Total 1832 15942 17774
EI Issue All Other NULL 9 357 366EI Issue Total 9 357 366
Non ERCOT Issue Cancellations - Requested by CR 3 59 62Inadvertent switches - Drop to Arep 2 17 19
- Submitted by Inadvertent REP 502 8067 8569- Submitted by Losing REP 1187 3991 5178
All Other NULL 258 6220 6478Non ERCOT Issue Total 1952 18354 20306Grand Total 3793 34653 38446
21
DEV FasTrak Issue Stats by Issue Type (thru 12/31/2006)
Legend:Counts are of issues submitted during each month.
Issue Type Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Grand TotalDEV - Service History 96 259 88 102 100 92 121 70 106 96 19 0 1149DEV - Usage IDR 1 1 0 2DEV - Usage NIDR 2 1 1 1 1 1 1 0 8NonERCOT DEV - Service History 14 42 38 18 56 30 33 22 32 25 0 310NonERCOT DEV - Usage IDR 32 34 35 18 50 37 48 16 42 34 0 346NonERCOT DEV - Usage NIDR 33 51 19 11 31 42 34 13 27 24 0 285Grand Total 178 387 181 149 238 201 236 121 209 180 20 0 2100
22
DEV FasTrak Issue Stats by Issue Category (thru 12/31/2006)
• Of the 70 In Progress DEV Issues,6 are resolved and awaiting other party resolution check off
Issue Sub Category In Progress New Grand TotalLSE relationship record present in ERCOT system but not in MP system - ERCOT 4 4LSE relationship record present in MP system but not in ERCOT system - ERCOT 9 9LSE relationship records present in both systems but has date issues - ERCOT 19 19
DEV - Service History Total 32 32ESI ID present in ERCOT system but not in MP system - Non ERCOT 1 1Loss Code Assignment - Non ERCOT 1 1LSE relationship record present in ERCOT system but not in MP system - Non ERCOT 1 1Profile Code Assignment - Non ERCOT 16 16ZIP Assignment - Non ERCOT 12 12
NonERCOT DEV - Service History Total 29 2 31IDR Usage present in both systems but has date issues - Non ERCOT 1 1IDR Usage present in CR system but not in ERCOT system - Non ERCOT 1 1IDR Usage present in ERCOT system but not in MP system - Non ERCOT 1 1
NonERCOT DEV - Usage IDR Total 3 3Non-IDR Usage present in both systems but has date issues - Non ERCOT 1 1Non-IDR Usage present in both systems but has kWh or kW total issues - Non ERCOT 1 1Non-IDR Usage present in CR system but not in ERCOT system - Non ERCOT 2 2
NonERCOT DEV - Usage NIDR Total 2 2 4Grand Total 63 7 70
23
DEV FasTrak Issue Stats by Issue Type (thru 12/31/2006)
Issue Type Rejected Resolved Grand TotalDEV - Service History 394 723 1117DEV - Usage IDR 2 2DEV - Usage NIDR 4 4 8NonERCOT DEV - Service History 21 258 279NonERCOT DEV - Usage IDR 42 301 343NonERCOT DEV - Usage NIDR 14 267 281Grand Total 477 1553 2030
24
DEV FasTrak Issue Stats by Issue Category (thru 12/31/2006)
Issue Type Issue Sub Category Rejected Resolved Grand TotalDEV - Service History ESI ID present in ERCOT system but has start date issues - ERCOT 2 2
ESI ID present in ERCOT system but not in MP system - ERCOT 6 6ESI ID present in MP system but not in ERCOT system - ERCOT 37 1 38LSE relationship record present in ERCOT system but not in MP system - ERCOT 21 161 182LSE relationship record present in MP system but not in ERCOT system - ERCOT 105 182 287LSE relationship records present in both systems but has date issues - ERCOT 218 371 589Profile Code Assignment - ERCOT 3 3Region Code Assignment - ERCOT 1 1Status Assignment - ERCOT 1 1Un-retire ESIID 8 8
DEV - Service History Total 394 723 1117DEV - Usage IDR IDR Usage present in CR system but not in ERCOT system - ERCOT 2 2
DEV - Usage IDR Total 2 2DEV - Usage NIDR Non-IDR Usage present in CR system but not in ERCOT system - ERCOT 4 2 6
Non-IDR Usage present in TDSP system but not in ERCOT system - ERCOT 2 2DEV - Usage NIDR Total 4 4 8
NonERCOT DEV - Service History ESI ID present in ERCOT system but has start date issues - Non ERCOT 1 1ESI ID present in MP system but not in ERCOT system - Non ERCOT 3 6 9Loss Code Assignment - Non ERCOT 30 30LSE relationship record present in ERCOT system but not in MP system - Non ERCOT 2 2LSE relationship records present in both systems but has date issues - Non ERCOT 6 3 9Profile Code Assignment - Non ERCOT 1 89 90Region Code Assignment - Non ERCOT 1 1Station Code Assignment - Non ERCOT 4 55 59ZIP Assignment - Non ERCOT 4 74 78
NonERCOT DEV - Service History Total 21 258 279NonERCOT DEV - Usage IDR IDR Usage present in both systems but has date issues - Non ERCOT 17 39 56
IDR Usage present in both systems but has kWh issues - Non ERCOT 6 109 115IDR Usage present in CR system but not in ERCOT system - Non ERCOT 16 74 90IDR Usage present in ERCOT system but not in MP system - Non ERCOT 3 79 82
NonERCOT DEV - Usage IDR Total 42 301 343NonERCOT DEV - Usage NIDR Non-IDR Usage present in both systems but has date issues - Non ERCOT 16 16
Non-IDR Usage present in both systems but has kWh or kW total issues - Non ERCOT 4 74 78Non-IDR Usage present in CR system but not in ERCOT system - Non ERCOT 5 111 116Non-IDR Usage present in ERCOT system but not in MP system - Non ERCOT 5 66 71
NonERCOT DEV - Usage NIDR Total 14 267 281Grand Total 477 1553 2030