1.RECTANGULAR CONTOURING
1.1 AIM
To prepare a contour map of the given ground surface by the method of rectangulation.
1.2 INSTRUMENTS USED
1. Dumpy level with tripod
2. Chain
3. Tape
4. Ranging rod
5. Levelling staff
6. Cross staff
7. Arrows
8. Ropes
1.3 PROCEDURE
The dumpy level is the setup at anywhere in the contour area and temporary
adjustments are done.
The boundary area of the contour is marked using lime powder.
The area of the contour is divided into networks of rectangle by lines at right angles
and their corners marked with pegs or arrows.
The contour interval of the sides of the square may from 80X60m preferably the size
of the rectangulation may be uniform.
In every 5m the intervals are taken. Take the bench mark.
After taking the R.L. of the bench mark the corners of these rectangles are surveyed
with leveling instrument.
Each point of the R.L. is to be noted.
Contours having the same R.L. are joint together and contours never intersect with each other
contours.
-
7/31/2019 Survy Camp www.annaunivprojects.com
3/22
NAME OF LOCATION : INSTRUMENT NO :
SURVEYOR : DATE :
STATION B.S I.S F.S H.I R.L REMARKS
B.M 0.590 100.590 100.00
A1 1.300 99.290
A2 1.320 99.270
A3 1.330 99.260
A4 1.320 99.270
A5 1.350 99.240
A6 1.330 99.260
A7 1.340 99.250
A8 1.330 99.260
A9 1.330 99.260A10 1.320 99.270
A11 1.310 99.280
B1 1.320 99.270
B2 1.330 99.260
B3 1.340 99.250
B4 1.370 99.220
B5 1.350 99.240
B6 1.340 99.250
B7 1.320 99.270
B8 1.310 99.280B9 1.330 99.260
B10 1.330 99.260
B11 1.340 99.250
C1 1.320 99.270
C2 1.320 99.270
C3 1.330 99.260
C4 1.340 99.250
C5 1.320 99.270
C6 1.310 99.280
C7 1.310 99.280C8 1.320 99.270
C9 1.320 99.270
C10 1.330 99.260
C11 1.360 99.230
D1 1.290 99.300
D2 1.300 99.290
D3 1.330 99.260
-
7/31/2019 Survy Camp www.annaunivprojects.com
4/22
D4 1.320 99.270
D5 1.350 99.240
D6 1.300 99.290
D7 1.290 99.300
D8 1.310 99.280
D9 1.310 99.280D10 1.300 99.290
D11 1.300 99.290
E1 1.280 99.310
E2 1.280 99.310
E3 1.280 99.310
E4 1.300 99.290
E5 1.280 99.310
E6 1.290 99.300
E7 1.280 99.310
E8 1.280 99.310E9 1.280 99.310
E10 1.280 99.310
E11 1.280 99.310
F1 1.250 99.340
F2 1.250 99.340
F3 1.250 99.340
F4 1.260 99.330
F5 1.270 99.320
F6 1.250 99.340
F7 1.240 99.350F8 1.240 99.350
F9 1.270 99.320
F10 1.260 99.330
F11 1.250 99.340
G1 1.250 99.330
G2 1.260 99.330
G3 1.260 99.340
G4 1.250 99.410
G5 1.180 99.410
G6 1.180 99.390G7 1.200 99.380
G8 1.210 99.360
G9 1.230 99.350
G10 1.240 99.350
G11 1.240 99.460
H1 1.130 99.440
-
7/31/2019 Survy Camp www.annaunivprojects.com
5/22
H2 1.150 99.470
H3 1.120 99.470
H4 1.120 99.440
H5 1.150 99.420
H6 1.170 99.440
H7 1.150 99.390H8 1.200 99.390
H9 1.200 99.360
H10 1.230 99.380
H11 1.210 99.500
I1 1.090 99.510
I2 1.080 99.550
I3 1.040 99.560
I4 1.030 99.560
I5 1.010 99.580
I6 1.030 99.560I7 1.090 99.500
I8 1.140 99.450
I9 1.140 99.450
I10 1.120 99.470
I11 1.100 99.490
J1 1.010 99.580
J2 0.990 99.600
J3 0.960 99.630
J4 0.960 99.630
J5 0.950 99.640J6 1.000 99.590
J7 1.060 99.530
J8 1.080 99.510
J9 1.100 99.490
J10 1.120 99.470
J11 1.120 99.470
K1 0.980 99.610
K2 0.960 99.630
K3 0.950 99.640
K4 0.940 99.650K5 0.940 99.650
K6 0.990 99.600
K7 1.050 99.540
K8 1.090 99.500
K9 1.090 99.500
K10 1.100 99.490
-
7/31/2019 Survy Camp www.annaunivprojects.com
6/22
ARITHMETIC CHECK
SUM OF B.S-SUM OF F.S = LAST R.L
FIRST R.L
0.591.13 = 99.46100
0.54 =0.54
RESULT:
The contour map has been plotted by using the obtained reduced level
K11 1.130 99.460
-
7/31/2019 Survy Camp www.annaunivprojects.com
7/22
2.RADIAL CONTOURING METHOD
2.1 AIM
To prepare a contour map for the given surface by radial contour method.
2.2 INSTRUMENTS REQUIRED
1. Theodolite with tripod
2. Leveling staff
3. Ranging rods
4. Hammer
2.3 FORMULA USED
D = K s cos 2 + C cos
V = ( K s sin 2)/2 + C cos
2.4 FORMULA DESCRIPTION
D = Distance between the station point and R.L of the point in (m)
K=100 (multiplying constant)
=Vertical angle
v=vertical distance
s=staff intercept
2.5 PROCEDURE
Set the instrument at the station point and do all the temporary adjustmentsrequired.
Then place the leveling staff at the B.M and note down the reading.
Then set the Vernier A and B to O and place the ranging rod at a distance at .Hold the staff at suitable interval of 5m.Note down the reading at all
corresponding point and also note the vertical angle O.
Repeat the same with different angle by keeping the lower clamp fixed and theclamp as movable.
The unknown distance between the reduced levels is calculated by using theabove mentioned formula.
-
7/31/2019 Survy Camp www.annaunivprojects.com
8/22
A contour map is drawn after obtaining the R.L.
2.6 RESULT
The contour map has been plotted with its reduced level
-
7/31/2019 Survy Camp www.annaunivprojects.com
9/22
3.DOUBLE PLANE METHOD
3.1 AIMS
To determine the Reduced Level of two elevated objects and the level difference
betweenthem.
3.2 INSTRUMENTS REQUIRED
1. Theodolite with tripod
2. Levelling staff
3. Cross staff
4. Tape
5. Ranging rods
6. Plumb bob
3.3 PROCEDURE
Setup the theodolite at A and level it accurately with respect to the altitude
bubble
With the vertical verneir set to zero reading & the altitude bubble in the center
of its run,take the reading on the levelling staff kept at the near B.M station
Direct the telescope towards P and bisect it accurately. Clamp both the plates
Read the vertical angle 1 Direct the telescope towards Q by unclamping the upper clamp screw and
bisect it accurately. Clamp both the plates and note horizontal angle 1 and
vertical angle 2
Direct the telescope towards another instrument station B in which it is at a
known distance of 10m from the main instrument and note the horizontal
angle 2
Shift the instrument to the station B and repeat steps 1& 2.
Now direct the telescope towards Q and bisect it accurately. Note the vertical
angle 3 Now direct the telescope towards P and bisect it accurately. Note the
horizontal angle 3 and vertical angle 4
Direct the telescope towards instrument station A and note the horizontal
angle 4
-
7/31/2019 Survy Camp www.annaunivprojects.com
10/22
3.4 RESULT
R.L of P = 113.11m
R.L of Q = 121.50m
Difference elevation between tower P & Q =
-
7/31/2019 Survy Camp www.annaunivprojects.com
11/22
5. PROFILE LEVELLING.
DATE: 15.03.2012.
5.1 INTRODUCTION
5.1.1 LEVELLING
Levelling is a branch of surveying and the objects of which is
1. To find the elevation of given point with respect to a given or assumed datum.
2. To establish point at a given elevation or at different elevation with respect to a given or
assumed datum.
5.1.2 PROFILE LEVELLING
Profile leveling is the process of determining elevation of point at short measured
intervals along a fixed line such as the centre line of a Railway, Highway, or Sewer.
5.1.3 LONGITUDINAL SECTIONING
The fixed line may be a single straight line or it may be composed of a succession of
straight lines or of a series of straight lines connected by curve is known as Longitudinal
Sectioning.
5.1.4 CROSS SECTIONING
Cross sections are run at right angles to the longitudinal profile and on either side of it
for the purpose of lateral outline of the ground surface. They provide the data for estimation
quantities of earth work and for other purposes.
5.2 TERMS USED IN PROFILE LEVELLING
5.2.1 DATUM
Datum is any surface to which elevation are referred.
-
7/31/2019 Survy Camp www.annaunivprojects.com
12/22
5.2.2 BENCH MARK
Bench mark is a relatively permanent point of reference whose elevation with respect to
same assumed datum is known.
5.2.3 BACK SIGHT
Bench mark is the sight taken on a leveling staff held at a point of known elevation.
5.2.4 FORE SIGHT
Fore sight is a sight taken on a rod held at a point of unknown elevation, to ascertain the
amount by which the point is below the line of sight and thus to obtain the elevation of the
station.
Intermediate station is the point, intermediate between two turning point on which only
fore sight is taken to determine the elevation of the station.
5.2.5 CHANGE POINT
Change point is a point o which both fore sight and back sight are taken on a line ofdifferent levels.
-
7/31/2019 Survy Camp www.annaunivprojects.com
13/22
5.3 LONGITUDINAL SECTIONING
5.3.1 AIM
To determine the longitudinal section of the elevated point on the ground surface by
profile leveling.
5.3.2 INSTRUMENT REQUIRED
1. Dumpy level with tripod.
2. Tape.
3. Chain.
4. Cross staff.
5. Levelling staff.
6. Ranging rods.
5.3.3 PROCEDURE
Set up the dumpy level on the instrument station and do all the temporary
adjustments.
Hold the leveling staff on B.M and note the reading as Back sight.
Now hold the leveling staff at starting point and note the reading. At a constant interval of 5m distance, note the reading.
In longitudinal sectioning, necessary change points are adopted upto the end point.
5.3.4 PLOTTING THE PROFILE
The horizontal distances are plotted along the horizontal axis to some scale and the
distances are also marked. The elevations are plotted along the vertical axis. Each ground point isthus plotted by the two co-ordinates. The various points are obtained and jointed by straight
lines.
-
7/31/2019 Survy Camp www.annaunivprojects.com
14/22
CONTINUE,
5.4 CROSS SECTIONING
5.4.1 AIM
To determine the cross section of the elevated point on the ground surface by profile
leveling.
5.4.2 INSTRUMENT REQUIRED
1. Dumpy level with tripod.
2. Tape.
3. Chain.
4. Cross staff.
5. Levelling staff.
6. Ranging rods.
5.4.3 PROCEDURE
Set up the dumpy level on the instrument station and do all the temporary
adjustments.
Hold the leveling staff on B.M and note the reading as Back sight.
By using cross staff, at an offset of 2m interval bisect the ranging rods on either sides
of the longitudinal profile.
Hold the leveling staff at each point and note the longitudinal profile up to the last
station.
5.4.4 PLOTTING THE CROSS SECTION
Cross sections are plotted almost in the same manner as the longitudinal section
except that in this case both the scales are kept equal. The points along the longitudinal section
are plotted at the centre point of the horizontal axis. The points to the left of centre point are
plotted to the left and those to the right are plotted to the right. The points are obtained are joinedby straight lines.
-
7/31/2019 Survy Camp www.annaunivprojects.com
15/22
PROFILE LEVELLING.
PLACE OF SURVEY: THRIUVANNAMALAI INSTRUMENT NO : D/L-04
SURVEYOR NAME: DATE: 15.03.2012
HELPERS : BATCH MEMBERS. CLIMATE: HOT
STATION B.S I.S F.S H.I R.L
CHAINAGE
REMARKSL C R
B.M 1.630 101.630 100.000
1.720 99.910 151.710 99.920 1
1.710 99.920 11.710 99.940 0.5
1.690 99.940 1
1.690 99.940 11.930 99.700 0.5
2.010 99.620 30
1.960 99.670 1
1.910 99.720 11.960 99.670 0.5
1.900 99.730 1
1.980 99.650 11.680 99.950 0.5
1.680 99.950 45
1.660 99.970 11.770 99.860 1
1.720 99.910 0.5
1.680 99.950 1
1.610 100.020 1
1.000 100.630 0.5
1.030 100.600 601.050 100.580 1
1.040 100.590 11.030 100.600 0.5
1.060 100.570 1
2.720 1.050 103.300 100.580 1
2.030 101.270 0.52.050 101.250 75
2.040 101.260 1
2.050 101.250 12.130 101.170 0.5
2.190 101.110 1
2.210 101.090 11.630 101.670 0.5
-
7/31/2019 Survy Camp www.annaunivprojects.com
16/22
1.590 101.710 901.600 101.700 11.630 101.670 11.650 101.650 0.51.680 101.620 1
0.750 1.680 102.370 101.620 10.970 101.400 0.50.970 101.400 1051.040 101.330 11.910 101.180 11.090 101.280 0.51.280 101.090 11.320 101.050 11.250 101.120 0.51.240 101.130 1201.290 101.080 11.330 101.040 11.400 100.970
0.51.580 100.790 11.630 100.740 11.300 101.070 0.51.270 101.100 1351.330 101.040 11.440 100.930 11.440 100.970 0.51.630 100.740 11.790 100.580 10.840 101.530 0.50.860 101.510 150
0.960 101.410 11.130 101.240 10.910 101.460 0.50.950 101.420 11.170 101.200 10.440 101.930 0.50.480 101.890 1500.440 101.930 10.520 101.850 10.510 101.840 0.50.550 101.820 1
0.780 0.600 102.550 101.770 10.940 101.610 0.50.950 101.600
1.000 101.550
1.030 101.520
1.020 101.530
1.310 101.240
1.420 101.130
1.080 101.470
-
7/31/2019 Survy Camp www.annaunivprojects.com
17/22
1.050 101.500
0.980 101.570
1.040 101.510
1.100 101.450
1.160 101.390
1.410 101.150
1.100 101.450
1.170 101.380
1.170 101.380
1.230 101.320
1.150 101.400
1.310 101.240
1.370 101.180
1.450 101.100
1.420 101.130
1.480 101.070
1.530 101.020
1.380 101.170
1.410 101.140
1.430 101.120
1.500 101.050
1.510 101.040
1.510 101.990
1.530 101.020
1.370 101.180
1.340 101.210
1.320 101.230
1.430 101.120
1.340 101.210
1.350 101.200
1.380 101.170
1.410 101.140
1.390 101.160
1.290 101.260
0.460 102.090
0.480 102.070
0.490 102.060
0.520 102.030
0.450 102.100
0.470 102.080
1.230 0.520 103.260 102.030
1.470 101.790
1.300 101.960
1.310 101.950
1.240 101.020
1.360 101.900
1.410 101.850
1.430 101.830
1.380 101.880
-
7/31/2019 Survy Camp www.annaunivprojects.com
18/22
1.450 101.810
1.380 101.880
1.330 101.930
1.380 101.880
1.430 101.830
1.410 101.850
1.420 101.840
1.460 101.800
1.480 101.780
1.440 101.820
1.380 101.880
1.370 101.890
1.360 101.900
0.670 102.590
0.740 102.520
0.800 102.460
0.780 102.480
0.700 102.560
0.730 102.580
0.770 102.530
0.120 102.490
0.250 103.140
0.190 103.070
0.100 103.160
0.240 103.020
0.260 103.000
1.510 0.240 104.530 103.020
1.530 103.000
1.540 102.990
1.550 102.980
1.540 102.990
1.520 103.010
1.570 102.960
1.560 102.970
1.530 103.000
1.500 103.030
1.510 103.020
1.520 103.010
1.570 102.960
1.580 102.950
1.590 102.940
1.420 103.110
1.440 103.090
1.440 103.090
1.460 103.070
1.390 103.140
1.370 103.160
1.350 103.180
0.540 102.990
-
7/31/2019 Survy Camp www.annaunivprojects.com
19/22
0.510 102.020
0.610 102.920
0.600 102.930
0.560 102.970
0.680 102.850
2.100 0.670 104.960 102.860
1.970 102.990
1.970 102.990
2.090 102.870
2.160 102.800
2.120 102.840
2.060 102.900
2.010 102.950
1.720 103.240
1.750 103.210
1.780 103.180
1.770 103.190
1.690 103.270
1.700 103.260
1.690 103.270
0.950 104.010
1.070 103.890
1.110 103.850
1.100 103.860
0.900 104.060
0.870 104.090
0.880 104.080
0.080 104.880
0.120 104.840
0.250 104.710
0.310 104.650
0.080 104.880
0.020 104.940
1.260 0.020 106.200 104.950
1.340 104.860
1.380 104.820
1.560 104.640
1.560 104.640
1.320 104.880
1.300 104.900
1.280 104.920
1.050 105.920
1.120 105.080
1.200 105.000
1.200 105.000
1.140 105.060
1.100 105.100
1.070 105.130
0.390 105.810
-
7/31/2019 Survy Camp www.annaunivprojects.com
20/22
0.380 105.820
0.430 105.770
0.440 105.760
0.420 105.780
0.400 105.800
1.150 0.380 106.970 105.820
1.850 105.120
1.890 105.080
1.910 105.060
1.900 105.070
1.730 105.240
1.710 105.260
1.670 105.300
1.790 105.180
1.850 105.120
1.840 105.130
1.850 105.120
1.780 105.190
1.840 105.130
1.880 105.090
1.940 105.330
1.660 105.370
1.660 105.370
1.670 105.300
1.720 105.250
1.750 105.220
1.770 105.200
0.810 106.160
0.810 106.160
0.820 106.150
0.770 106.200
0.860 106.110
1.000 105.970
2.650 1.070 108.550 105.900
2.330 106.220
2.270 106.280
2.390 106.160
2.360 106.190
2.360 106.190
2.420 106.130
2.420 106.130
2.010 106.540
1.990 106.560
2.030 106.520
2.090 106.460
2.130 106.420
2.160 106.392
2.190 106.360
2.030 106.520
-
7/31/2019 Survy Camp www.annaunivprojects.com
21/22
1.990 106.560
2.060 106.490
2.130 106.420
2.160 106.390
2.220 106.330
1.920 2.260 108.210 106.290
2.050 106.160
2.080 106.130
2.100 106.110
2.070 106.140
2.070 106.140
2.090 106.120
1.990 106.220
1.750 106.460
1.720 106.490
1.810 106.400
1.830 106.380
1.720 106.490
1.760 106.450
1.810 106.400
1.140 107.070
1.190 107.020
1.210 107.000
1.250 106.960
1.170 107.040
1.220 106.990
1.190 107.020
0.080 108.130
0.130 108.080
0.190 108.020
0.240 107.970
0.110 108.100
0.150 108.160
1.890 0.260 109.840 107.950
1.600 108.240
1.620 108.240
1.640 108.240
1.600 108.200
1.660 108.240
1.720 108.180
1.410 108.120
1.410 108.430
1.400 108.430
1.430 108.400
1.470 108.410
1.500 108.370
1.530 108.350
0.970 108.310
1.000 108.870
-
7/31/2019 Survy Camp www.annaunivprojects.com
22/22
1.010 108.840
1.040 108.830
0.990 108.800
1.050 108.850
1.460 1.090 110.210 108.790
1.390 108.820
1.400 108.810
1.420 108.790
1.500 108.710
1.410 108.800
1.450 108.760
1.470 108.740
0.980 109.230
1.040 109.170
1.090 109.120
1.040 109.170
0.960 109.250
1.020 109.190
1.100 109.110
CHECK:
Sum of B.S Sum of F.S = Last R.L First R.L
20.05-10.95 = 109.11-100
9.110 = 9.110
Hence Okay