Suspended Work Platformfor
wall girts and cladding
![Page 2: Suspended work platform: Double Decker System](https://reader038.vdocuments.net/reader038/viewer/2022100506/55693294d8b42add468b4e9b/html5/thumbnails/2.jpg)
Highlights
• Double Decker Suspended work platform- 2.8 M height- can be used to fix the sheets at two heights simultaneously
• Length of 12 m- bay to bay length
• Weight of about 2MT
• Indigenously developed with active support and guidance from Sri.Balakrishnan,RPM, TBSL
![Page 3: Suspended work platform: Double Decker System](https://reader038.vdocuments.net/reader038/viewer/2022100506/55693294d8b42add468b4e9b/html5/thumbnails/3.jpg)
Useful Data
• Can be used wall sheeting above 15 mtrs – where boom lift or man basket is not possible
• Better than boom lift or man basket, as workers can safely work bay to bay
• JSA and working process well prepared for future use
• Can go upto heights of 60 mtrs• Can be used to fix wall girts also• Useful in constrained space and lack of front
clearance by the clients
![Page 4: Suspended work platform: Double Decker System](https://reader038.vdocuments.net/reader038/viewer/2022100506/55693294d8b42add468b4e9b/html5/thumbnails/4.jpg)
Other innovations
• Other ideas implemented with a target of 10 ideas per project objective
• Multilift of GHHB peb portion-design, jsa, process, etc well documented
• Pre Assembly of GHHB fabricaions- trolley concept for accurate and quick assembly
• Indigenous corrections of camber and sweep of 88 crane beams of TBSL
• Bridge Scaffold concept
![Page 5: Suspended work platform: Double Decker System](https://reader038.vdocuments.net/reader038/viewer/2022100506/55693294d8b42add468b4e9b/html5/thumbnails/5.jpg)
Ideas which did not work
• Purlin lift by winch and motor- failed at experiment stage
• Multi mode lift of purlins
• Avoiding Risk Creep in safety using STAMP model
![Page 6: Suspended work platform: Double Decker System](https://reader038.vdocuments.net/reader038/viewer/2022100506/55693294d8b42add468b4e9b/html5/thumbnails/6.jpg)
Few photos
Set up of SWPHoisting
Hoisting
![Page 7: Suspended work platform: Double Decker System](https://reader038.vdocuments.net/reader038/viewer/2022100506/55693294d8b42add468b4e9b/html5/thumbnails/7.jpg)
Few photos
Work above 15M
Work at 35 M
![Page 8: Suspended work platform: Double Decker System](https://reader038.vdocuments.net/reader038/viewer/2022100506/55693294d8b42add468b4e9b/html5/thumbnails/8.jpg)
credit goes to
• HP kallesh : Associate Director• G.Ashok: Project Manager
Thanks to: Sri. Majumdar: Structural consultant, JamshedpurSri.Balakrishna Perumal : RPM,TBSLSri.Alok Malhotra: Tata SteelSri.Byrappa: Structural consultant, Bangalore